Loading…
Loading…
9,710 results • Best match
Laying DI Pipe from Tubewell to Distribution for Augmentation of Ground Water Based Mini Piped Water Supply Scheme for Khunkhali (Part - I) Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte.
Restoration of Rajendraur Kathgola Road related to proposed cutting (Open Trench) for laying of underground 600mm dia DI pipe by KMDA during the year 2024-25 - Restoration of shoulder during the year 2025-2026.
Construction of Gray Water management project at BAJRAPUR Mouja 19 nos point (LWM) modified litch pit silt chamber and UPVC pipe connection under Salbari II Gram Panchayat within Tufanganj II Panchayat Samity Fund 15th FC and SBMG 2024 25
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe and Pre-packed Resin Bonded Gravel Filter for Augmentation of Companir char WS Scheme, Block - Sagar for implementation of JJM.
Sinking of 1 (one) no. Tubewell by D.R. Rig method with UPVC pipe and UPVC ribbed strainer at Augmentation of Kola Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte
Emergent replace of UPVC pipe line for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Dhanjana Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda.
Sinking of Rig Bored Tubewell (Replacement) 300mm. x 200 mm. dia. 200 mtr deep by Direct Rotary method using UPVC pipe under Augmentation of different Water Supply Scheme (Phase-II) in Hanskhali Bloc,. under Ranaghat Sub-Division, PHE Dte.
Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at KATALIA Water Supply Scheme(TW - II) within Berhampore Block under JJM
Sinking of 1 (one) no. Tubewell by D.R. Rig method with UPVC pipe and UPVC ribbed strainer at Augmentation of Chowberia Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte
Protection works for newly laid diff dia. UPVC pipe line at diff. places in Radhanagar Tetul para, Sekh para, Majher para and Biswas para within Chotto Sehara w/s scheme, Sandehkhali-I block under Hasnabad Sub-Division P.H.E. Dte.
Sinking of 1 (one) no. Tubewell by D.R. Rig method with UPVC pipe and UPVC ribbed strainer at Augmentation of Gabindapur Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte.
Sinking of 250mm x 150mm dia. 360 mtr. deep replacement tubewell by Direct Rotary Rig Method using UPVC pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No. - 4, Chandipur of Pathankhali Water Supply Scheme Block - Gosaba.
Left-out portion of uncovered area with uPVC pipe line and its allied works for Augmentation of Uttar Sonamui Water Supply Scheme (Mouza-Uttar Sonamui,Part-I) within Tamluk Block under Tamluk Sub-Division of Tamluk Division, PHE Dte.
Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe and UPVC ribbed strainer at Gangrapota water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte.
Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram with laying of UPVC pipe line and Repairing and Renovation of AIRP Compressor Room under Augmentation of Koniara Water Supp
Estimate for Replacing of old damaged A.C. pipe and laying of UPVC pipe lines from Dargatala towards Sardarpara via. Gaipur Chowmatha and Hospital road towards Thakurantala and Singhi Bari to Fire Bridged and Gaighata road to Mukul Banerjee house
Supply and laying 110 mm dia UPVC pipe with road restoration at Uchumath Bankimpally H/O Manash Chakraborty to H/O Manju Sing to H/O Kartick Das to H/O Bittu at ward no. 25 under Naihati Municipality.
Procurement of different size UPVC Pipe for Renovation of Jagannathpur Major RLI Scheme at Bamongola Block under Gazole (A-M) Sub Division under Malda-I (A-M) Division in the District of Malda under Core Sector 2019-20 programme.
Extention of UPVC pipe line for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM ) at Mahanandapur and Sadhu Hat mouza command area of Mahanandapur Water Supply Scheme at Chanchal-I Block under Malda Di
Sinking of Rig Bored Tubewell (Replacement) 300mm. x 200 mm. dia. 200 mtr deep by Direct Rotary method using UPVC pipe under Augmentation of different Water Supply Scheme (Phase-II) in Hanskhali Block, under Ranaghat Sub-Division, PHE Dte.
Procurement of different size UPVC Pipe for Renovation of Digalbar Major RLI Scheme at Bamangola Block under Gazole (A-M) Sub-Division under Malda-I (A-M) Division in the District of Malda under Core Sector 2019-20 programme.
Supplying, Laying, Fitting, Fixing and Jointing of UPVC pipe line for Rising Main From Bhadulara (OHR Site) to Katgura (CWR Site) including construction of sluice valve chamber etc. under SANABUNDH W/S Scheme of Bankura Sadar Sub - Division, under
Sinking of 1(one) no. 300mm x 200 mm. dia. Tube well 250 mtr deep by D.R. method with UPVC pipe and UPVC ribbed strainer at Panchita water supply scheme (2nd T/W site) under Bongaon Sub-Division P.H.E.Dte.
Construction of Gray Water management project at Barasalbari Mouja 73 nos point (LWM) modified litch pit silt chamber and UPVC pipe connection under Salbari II Gram Panchayat within Tufanganj II Panchayat Samity Fund 15th FC and SBMG 2025 26
Operation and maintenance of distribution system and rising main (CI/DI/AC/UPVC pipe) of Kharu Surface Based W/S Scheme under Amdanga block within the jurisdiction of North 24 Pgs WS Division I, P.H.E. Dte. w.e.f. 365 Days
Sinking of Rig Bored Tubewell (Replacement) 300mm. x 200 mm. dia. 200 mtr deep by Direct Rotary method using UPVC pipe under Augmentation of different Water Supply Scheme (Phase-II) in Hanskhali Block, under Ranaghat Sub-Division, PHE Dte.
DEVELOPEMENT OF W/S NETWORK BY CAPING OF EXISTING UPVC PIPE LINE, PICKUP, AND OTHER RELATED WORK DUE TO KEIIP NEW RUNNING NETWORK AT DIFFERENT LOCATION OF 22 BIGHA, ANNY SARANI AND KALYANNAGAR IN WARD NO-143, BR-XVI.
Sinking of 1 no 300 X200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at proposed Tube Well Site of BEGAMPUR ZONE-I W/S Scheme
Relaying of distribution system of pipe line with UPVC pipe for various nodals in the command area of the scheme under Anantapur Zone- II adjoining mouzas Water Supply Scheme of Tamluk Sub-Division under Tamluk Division, P.H.E Dte.Purba Medinipur.
Construction of Gray Water management project at Barasalbari Mouja 74 nos point LWM modified litch pit silt chamber and UPVC pipe connection under Salbari II Gram Panchayat within Tufanganj II Panchayat Samity Fund 15th FC and SBMG 2025 26
Laying of 250 mm dia M.S pipe Line over Gobindapur Bridge connection in between existing UPVC pipe line at Gurudaspur -Gobindapur of Tehatta village of Beharia G.P under Rukunpur Zone-G surface based water supply scheme under Berhampore Division
Sinking of 1 (one) no. Tubewell by D.R. Rig method with UPVC pipe and UPVC ribbed strainer at Augmentation of Chandpara Water Supply Scheme (H/W Site) within the Jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte
Water pipe line supply at Cons Water prakalpa at Samta E village.( Installation of Water Supply of 200mmx100mm dia X220.5 mtr. Deep PVC tube well by rig boring method , Laying distribution UPVC Pipe Line,Construction of New Pump House )
Laying of additional UPVC pipe line for balance portion in the distribution system for Providing balance FHTC to cover household under the Augmentation Scheme of Falta Zone-V within Mega Surface water-based W/S scheme for Falta-Mathurapur.
Left-out portion of uncovered area with uPVC pipe line and its allied works for Augmentation of Uttar Sonamui Water Supply Scheme (Mouza-Uttar Sonamui,Part-II) within Tamluk Block under Tamluk Sub-Division of Tamluk Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram with laying of UPVC pipe line, Tube Well connection and pipe protection work under Augmentation work at Kamlabas Water Supp
laying of UPVC pipe lines from Bithika Sadhu house towards Nepal Bairagi and Gouri Mondal house towards Joydeb Debnath and Shyamal Sarkar towards Goutam Mukherjee and Mayarani Halder towards Chaitanya Ashram and Shipra house to Dinesh Mondal in W3
Balance work of Laying of UPVC Pipe , Construction of approach road , Modification of R.C.C. Elevated Reservoir and Pump House, Boundary wall, for Agumentation of Basudevpur (Zone-I) Water Supply Scheme in Suti-I Block of Jangipur Sub Division und
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe and Pre-packed Resin Bonded Gravel Filter for Ramchandrapur W/S Scheme, Block- Kakdwip for implementing of JJM. (SM/15050)
Procurement of different size UPVC Pipe for Renovation of Khanpur Major RLI Scheme at Manikchak Block under Malda-I (A-M) Sub Division under Malda-I (A-M) Divisionin the District of Malda under Core Sector 2019-20 programme.
Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe under Augmentation work at Panchita W/S Scheme Bongaon block within the jurisdiction of Bonga
Laying of UPVC pipe line and Providing FHTC in connection with JJM and JAL SWAPNA at Khuplaltola, Gosaitola under command area of Charianantapur Water Supply Scheme at Kaliachak-III Block under Malda Arsenic Area Water Supply Division, PHE Dte.
Construction of Gray Water management project at Barasalbari Mouja 31 nos point (LWM) modified litch pit silt chamber and UPVC pipe connection under Salbari II Gram Panchayat within Tufanganj II Panchayat Samity Fund 15th FC and SBMG 2024 25
Sinking of Rig Bored Tubewell (Replacement) 300mm. x 200 mm. dia. 200 mtr deep by Direct Rotary method using UPVC pipe under Augmentation of different Water Supply Scheme (Phase-II) in Hanskhali Block, under Ranaghat Sub-Division, PHE Dte.
Providing Functional Household Tap Connection (FHTC) to the uncovered household as well as convert the mouzas into Swajal Gram including laying of UPVC pipe under Augmentation work at Panchita W/S Scheme Bongaon block within the jurisdiction of Bonga
Sinking of 01 No. 250mm x 150mm dia. 360 mtr. deep Tubewell by D.R. Rig method using UPVC Pipe and Pre-packed Resin Bonded Gravel Filter for Augmentation at Ramchandranagar W/S Scheme, Block - Kakdwip for implementing of JJM.
Laying of UPVC Pipe line for Revision of drawing to accommodate FHTC Construction of Jhama Bats Road for the approach way to headwork site of Mahisbathan water supply scheme under Kalyani Sub Division I under Nadia Division PHE Dte.
Individual House Connection from Household Inspection Pit to Main House Pit / Manhole for Sewerage Networking under Budge Budge Municipality with 110 mm. dia. UPVC Pipe OD at Ward No.-15 and Ward No.-20. 2nd Call Sl. No.-5
Procurement of different size UPVC Pipe for Renovation of Sonadighi Major RLI Scheme at Gazole Block under Gazole (A-M) Sub Division under Malda-I (A-M) Division in the District of Malda under Core Sector 2019-20 programme.
Procurement of different size UPVC Pipe for Renovation of Katwadanga Major RLI Scheme at Bamangola Block under Gazole (A-M) Sub-Division under Malda-I (A-M) Division in the District of Malda under Core Sector 2019-20 programme.