Loading…
Loading…
9,710 results • Best match
MISCALLENEOUS WORKS FOR PROTECTION OF POLES BY USING PVC PIPE FOR SAFETY OF PEDASTRAIN AT ELGIN ROAD AND ITS SURROUNDING AREAS IN WARD NO.-70 UNDER BR.-VIII.
Installation of 1 Nos. Submersible pump within 80 mm dia and 72 m depth PVC pipe for ..fittings over MS Structure stand at Sati Ghat under Bolpur Municipality.
CONST OF DRAN PVC PIPE FROM PRODIP HOUSE TO LALCHAND SAHA POND UTTA KUMEDPUR 70 MTR APAS ID NO APAS/01/046/19/0003,UNDER SADLICHAK GRAM PANCHAYAT.
CONST.OF DRAIN PVC PIPE FROM THE KALI MANDIR TO MAINUL LAND AT UTTAR KUMEDPUR 60 MTR APAS ID NO APAS/01/046/19/0005,UNDER SADLICHAK GRAM PANCHAYAT.
Sinking of one no. 250 mm by 150 mm tube well with PVC pipe and strainer by reverse circulation or by direct rotary method at KUSTIA Housing Estate.
Extension of PVC Pipe Line near Ajit Das house Sub Mersible Pump to Paltu Maity house at Nandigram-VI Sansad under Nandigram G.P under Nandigram-I Panchayat Samiti
Renovation of WTA with UPVC / MS pipes, spout chambers, and installation of Shore Manifold (inlet and outlet), Motor-pump sets as per drawing and design for Kasthoshali-I Major RLI scheme at Purbasthali-II Block under Patuli (AM) Sub-division
Renovation of WTA with UPVC / MS pipes, spout chambers and installation of Quadruped and Shore Manifold (inlet and outlet), Motor-pump sets as per drawing and design for Ganful Major RLI scheme at Ketugram-I Block under Katwa (AM) Sub-division
Renovation of WTA with UPVC / MS pipes, spout chambers, and installation of Shore Manifold (inlet and outlet), Motor-pump sets as per drawing and design for Ghuni-II Major RLI scheme at Purbasthali-II Block under Patuli (AM) Sub-division
Supplying and laying different diameters MS pipes in Primary grid pipeline for permanent repairing and restoration in front of Mandir Bazar GLR for negotiating typical curved pipeline within Mandir Bazar Block under South-24 Pgns W/S Division-I, PHE
Renovation of WTA with UPVC / MS pipes, spout chambers, and installation of Shore Manifold (inlet and outlet), Motor-pump sets as per drawing and design for Parsahapur-II Major RLI scheme at Kalna-I Block under Kalna (AM) Sub-division
Renovation of WTA with UPVC / MS pipes, spout chambers and installation of Quadruped and Shore Manifold (inlet and outlet), Motor-pump sets as per drawing and design for Moniary Major RLI scheme at Raina-II Block under Memari (AM) Sub-division
Insertion of 4 nos delivery pipes through the existing MS Pipes under B.T. Road and construction of a Pump Shed near Ch 93.0 of Khardah Khal, adjacent to the Khardah Police Station within Khardah and Panihati Municipalities, P.S. Khardah, Distt
Construction of temporary latrine, Hand Washing Unit (bib cock,pipe and fittings etc.), vat, sinking of temporary TW including sinking of New TW with submersible pump, hire charges for PVC tank etc Gede Sammilani Haigh School (NIS Code- 10009646)
Construction of temporary latrine, Hand Washing Unit (bib cock,pipe and fittings etc.), vat,Sinking of temporary TW including sinking of New TW with submersible pump, hire charges for PVC tank etc at Dhoradaha Rajanikanta High School(NIS- 10007502)
Construction of temporary latrine, Hand Washing Unit(bib cock,pipe and fittings etc.), vat,Sinking of temporary TW including sinking of New TW with submersible pump, hire charges for PVC tank etc including Plumber, Sweeper at JNM Medical College
Construction of temporary latrine, Hand Washing Unit(bib cock,pipe and fittings etc.), for PVC tank etc including Plumber, Sweeper for CAPF Camp in connection with WBLA Election 2026 at Ghosh Para Saraswati Trust School (NIS Code- 10005275 ) unde
Construction of temporary latrine, Hand Washing Unit(bib cock,pipe and fittings etc.),for PVC tank etc including Plumber, Sweeper for CAPF Camp in connection with WBLA Election 2026 at Kalyani Julian Day School (NIS Code- 10006009 ) under Kalyani
GI LONG SCREW 15 X 50 MM, GI LONG SCREW 15 X 75 MM, GI LONG SCREW 15 X 100 MM, GI LONG SCREW 15 X 150 MM, GI LONG SCREW 15 X 200 MM, GI LONG SCREW 20 X 100 MM, GI LONG SCREW 20 X 150 MM, GI LONG SCREW 20 X 200 MM, GI LONG SCREW 25 X 100 MM, GI LONG ... FOR GI PIPE 15 ... FOR GI PIPE 20 ... FOR GI PIPE 25 ...
LAYING OF 300MM DIA DI PIPE LINE FROM CHAULPATTY ROAD TO B M ROAD IN WARD NO. 35 UNDER COMMAND ZONE OF SOUTH SEALDAH ROAD SUGR CUM BOOSTER PUMPING STATION IN WARD NO.57.
Laying of DI pipe for inter-connection with newly sunk Replacement Tube Wells and OHR Connection and urgent allied works in distribution system under Augmentation work at Gangrapota W/S Scheme under Bongaon Block
DEVELOPMENT OF FW SUPPLY BY NEW LAYING OF 150 MM DIA DI PIPE FROM JN OF R.D. ST AND LALABAGAN RD TO JN OF SARIATULLA LN AND KALIMUDDIN LN SURROUNDING AREA IN WD- 15
SUPPLYING AND LAYING OF 100 MM DIA DI PIPE BY REPLACING EXISTING WORN OUT 100 MM C.I PIPE FROM H.O DIPOK DAS TO RANJAN RAYAT AT TETUL TALA IN WD NO 114 BR XI.
Supplying, laying different dia HDPE and DI pipe including Functional House Hold Tap Connection (FHTC) for Distribution System (Zone-I) of Sarbari W/S Scheme under Raghunathpur Sub-Division under Purulia Division, PHE Dte.
DEVELOPMENT OF W S NETWORKS BY LAYING OF 100 MM DIA DI PIPE LINE AT JORA BILL H O BIDUT PAL KALPANA BANIK GOUTAM HALDAR, PRADIP PAL ETC IN WD NO 114 BR XI
DEVELOPMENT OF W S NETWORKS BY SUPPLYING AND LYING 150 MM DIA DI PIPE AT BABU PARA FROM PRE NO 41 BABU PARA PURBOPUTIARY TO DR ASIM CHANDRA IN WD NO 114 BR XI
DEVELOPMENT OF WATER SUPPLY BY REPLACING OLD AND WORNOUT PIPE BY 100MM DIA DI PIPE NEAR PREMISES NOS 203/2 RAIPUR ROAD 217 RAIPUR ROAD 63 JORABAGAN ETC PLACES IN WARD 99 BR X
LAYING OF 150 MM DIA. DI PIPE BY REPLACING EXISTING WORN OUT 150 MM DIA C.I PIPE FROM HARTIKI TALA MORE TO TARUN SANGHO CLUB AT DAKHIN PARA IN WD NO 114 BR XI.
DEVELOPMENT OF W.S PIPELINE BY SUPPLYING AND LAYING OF 150 MM DIA DI PIPE AT PHOOLBAGAN ESR FROM 254 BAGHAJATIN G BLOCK TO 192 BAGHAJATIN E BLOCK EAST IN WARD NO 101 BR XII.
SUPPLY AND LAYING OF 100 MM DIA DI PIPE AT SARAT GHOSH GARDEN ROAD (KAMALA PARK) NEAR PREMISES NOS. 113A/3, 110/5/1, 115S 112T AND 112K ETC, IN WARD. 91, BR.-X
SUPPLYING AND LAYING OF 100MM DIA DI PIPE AT DAKHIN ANANDA PALLY NEAR H O BABLA DEY BISWANATH THAKUR ROBI KUNDU, RAJIB SIGH AND ETC UNDER SLUM AREA IN WD NO 114 BR XI
Protection works for newly laid different dia. UPVC/DI pipe line at different places in Champali and Hosenpur Mouza for Rejuvenation of Champali w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte.
Laying of CI,DI Pipe, Hume pipe and construction of boundary wall and other allied works at JAIGAON DEVELOPMENT AUTHORITY Area Water Supply Scheme Zone-I and Zone-II under Alipurduar Division, PHE Dte.
LAYING OF 150 MM DIA DI PIPE BY REPLACEMENT OF OLD DAMAGE 200 MM DIA C.I PIPE FROM ARSHALAN GOLDEN BIRIYANI HOUSE TO J 9 BAGHAJATIN STATION ROAD IN WD NO 102 BR XII.
DEVELOPMENT OF WATER SUPPLY GRID SYSTEM BY SUPPLY AND LAYING 150 MM DIA DI PIPE AT BAGHAJATIN E BLOCK FROM 90 TO 261 UPTO 158 BAGHAJATIN E BLOCK IN WARD NO 101 BR XII.
Protection works for newly laid different dia. UPVC/DI pipe line at different places in Boyermari mouza for Rejuvenation of Boyermari Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte.
AUGMENTATION OF F/WATER SUPPLY BY REPLACING 100 MM DIA DI PIPE AT 55,61,127,155 PA SHAH ROAD(HOGLAPARA BUSTEE), 66 ANJUMANARA BEGUM RD AND 21,27 GOLF CLUB RD(JHORO BUSTEE) IN WARD NO 94
SUPPLYING AND LAYING OF 100MM AND 150MM DIA DI PIPE TO DEVELOP THE WATER SUPPLY NETWORK SYSTEM NEAR PREMISES NO 52 SHAIDNAGAR, 24A PADDAPUKUR, 6/6/1N PADDAPUKUR ETC IN WARD 98 BR X
Protection works for newly laid different dia. UPVC/DI pipe line at different places in Baunia mouza for Rejuvenation of Baunia Abad w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte.
Withdrawing realaying of DI pipe line near Division Office Campus Construction for extension of additional room at Purulia Division office in Ground Floor 1st. floor including drain side appron under Purulia Division , PHE Dte.
LAYING OF 150 MM DIA. DI PIPE BY REPLACING EXISTING WORN OUT 150 MM DIA C.I PIPE FROM HARISAVA MANDIR TO H.O DR. ASIM PAL AT BABU PARA IN WD NO 114 BR XI.
CHANGE OF PIPE LINE TO IMPROVE WATER SUPPLY LINE BY PROVIDING 100 MM DIA DI PIPE AT NIRANJAN PALLY A BLOCK NIRANJAN PALLY MAIN ROAD UNDER BUSTEE AREA IN WARD NO 113 BR XI
DEVELOPMENT OF W S NETWORKS BY LAYING OF 100 MM DIA DI PIPE LINE AT PURBO PUTIARY H O 82 1 GURU CHARAN NASKAR ROAD TO MAA KALI CENTER IN WDNO 114 BR XI
IMPROVEMENT OF WATER SUPPLY BY LAYING OF 100MM DIA DI PIPE LINE REPLACING OLD WORN OUT PIPE FOR WESTERN SIDE OF R.R.PLOT FROM 162 R.R.PLOT TO 620 R.R.PLOT IN WARD NO-108, BR-XII.
DEVELOPMENT OF WATER SUPPLY NETWORK SYSTEM BY 100MM DIA DI PIPE NEAR PREMISES NO L/1/8 VIDYASAGAR, 1/21 VIDYASAGAR, 2/106 VIDYASAGAR,3/168 VIDYASAGAR ETC PLACES IN WARD 99 BR X
Withdrawing of DI pipe to prevent possibile damage due to widening of PWD road from Kamardanga More to Shibhati Hospital of Sangrampur water supply scheme under Basirhat Sub Division under Barasat Division PHE Dte.
LAYING 150MM DIA. DI PIPE LINE NEAR PRE. NO.V-200 , V-200/B , U-25 , U-27/2, U-33/1, U-29, U-14 ETC. KARBALA ROAD IN WARD NO -139, BR-XV.
DEVELOPMENT OF W.S PIPE LINE BY SUPPLY AND LAYING OF 100 MM DIA DI PIPE FROM 346 SATINDRAPALLY TO SUBHAS PALLY BIG DIA T W AND GOSTHOTALA A BLOCK LANE IN WARD NO 111.
One no leak repairing work of 1000 mm dia (DI Pipe) clear water rising main near Kamal Residency at S.D. More, Narendrapur on Sonarpur station road under Rajpur Sonarpur Municipality,District South 24 parganas.
New laying of 350mm dia. DI Pipe by replacing old damaged 350 mm dia backwashing C.I. Pipe from Clear Water Reservoir (CWR) to gate of filtration unit at Howrah Water Works Padmapukur Plant ( HWWPP)