Loading…
Loading…
9,716 results • Best match
Flex Board 20.5ft x 3ft both size with printing, Flex Board 22.5ft x 3ft both size with printing, Flex Board 6ft x 7ft one side printing only, Iron ladder 14ft with GI Pipe 2inch, 10 Watt flood lights for flex
Repairing work of concealed GI pipe line from ground floor to 7th floor staff toilet and allied civil work as preventive measures against seepage of toilet water the H/Q office building of WBMDFC at salt lake sec I kol-6
Reinstallation of Earthing arrangement system with 50 mm dia. GI Pipe at Three (03) different location (Oil Installation, Joint Kunch and Durgapur Siding Road) along with supply and fixing of Earth Busbar, GI Hot dip wire etc. and other allied works
DEVELOPMENT OF FW SUPPLY BY CHANGING OF DAMAGED GI PIPE NEAR 1 7C CHETLA HAT RD 35A 60 R DAS AUDDY RD 20 17 7L 17 8B MD LN AND 36 1 14 1B 52C JM LANE IN WARD NO 82
MAINTENANCE OF F.W AND U.F.W SUPPLY MAIN PIPE , CHANGING OF OLD AND WORN OUT GI PIPE OF STAND POST AND URINASLS AND ALLIED WORKS AT DC MITRA ST, JOY MITRA ST, NILMONI MITRA ST SURROUNDING AREAS IN WD NO-18
Supply and laying of clear water rising main pipeline of 600 mm dia MS Pipe from Madhyamgram WTP to PWD road junction along.....New Barrackpore Municipality under District North 24 Parganas, West Bengal under AMRUT 2.0.
Road Crossing work by 100 mm dia MS carrier pipe infront of Bandhkana More at Bahara Khuliya mouza by Jack pushing method, inetrconnection of MS carrier pipe with UPVC/HDPE pipeline including fabrication of MS pipe
Laying of pipeline at left out portions of secondary grid (DI , MS Pipe) in different locations (Sarisha School More, Mollapukur, Kalitala More, Kataria More, Bhatheriya Bazar, Jnan Chandra Ghose Polytechnic Extension Centre Falta to TCB Company
Laying balance portion of Primary Grid Rising main of 1219 mm dia MS pipe near Mandirbazar Police Station area in connection with Mega Surface Water Based Water Supply scheme for Falta-Mathurapur, Dist. South 24-pgs.
Supply and Laying of 12mm thick and 500 mm dia MS pipe (Length2224m) with Temporary road restoration Supply and Laying of 300 mm(Length1500m) and 350 mm(Length1000m) dia D.I.......within Maheshtala Municipality under AMRUT 2.0.
As per tender docus
Trial boring of 2 (two) nos. 100 mm x 50 mm dia x 270 mtr (av.) depth Tube well sinking upto 200 mtr. depth with PVC pipes including cost of all materials for Sarberya PWSS ( Head Work Site and 2nd T/W Site) under Haldia Sub Division
work of Sinking of 300mm X 200mm dia deep tube well l50mt deep top enlargement of 300mm dia with PVC pipes and stainer for Memari Water Supply scheme situated at Udaypally Purba para near house of Sukh Ranjan Mal in Zone no 01 Ward no 02
Installation of 100X40 mm dia 200 mtr. deep tube well with PVC pipes and strainer with Indian Mark II pump including high rise platform and soak well in front of Dulal Dey House of Baro Bamunia Mouza in Guma II Gram Panchayat under habra II Pan
Sinking of 1 no 100mm. x 40 mm. dia having 5 nos. strainer upto 300 Mtr. depth Mark II hand pump fitted tube well with PVC pipes near the house of Mantu Giri Gangasagar By-pass Chowrasta, JL No. 38 Kh No. 2021 Dag No. 711
Installation of 03 (Three) Nos of Light Duty Tube Well (Solar Operated) of size 150 mm X 150 mm (PVC pipes, Depth 100 metre) at Mouza -Shibpur, JL No-112, Plot No-745, 677, 872, G.P.-Bilati within Illambazar Dev. Block in the district Birbhum under
IMPROVEMENT OF W S PIPE LINE BY SUPPLY 7 LAYING OF 150 AND 100 MM DIA D I PIPE BY REPLACING DAMMAGE 150 AND 100 MM DIA CI PIPE AT 173 NIRANJANPALLY C BLOCK TO 281 NIRANJAN PALLY A BLOCK IN WARD NO 113 BR XI
Laying of HDPE pipe line (75mm 63mm) and supplying of DI specials with additional Functional Household Tap Connection (FHTC) of distribution system (Zone-I) under Sarbari W/S scheme within Raghunathpur Sub-Division under Purulia Division, PHE Dte.
Laying HDPE Pipe Line from Chatarkanali OHR site to Bahadurpur,to increase presure in Bahadurpur and Bagrakonda mouzas for construction and commissioning of FHTC (Funtional House Hold Tap Connection in connection with Jal Jeevan Mission (JJM) and JAL
DRAWL OF 33 KV 3C400 SQ MM XLPE CABLE BY MANUAL LAYING ASND MICROTUNNELLING THROUGH 200 MM DIA HDPE PIPE FOR BULK POWER SUPPLY TO M/S ELLENBARIE INDUSTRIAL GASES LTD AT MOUJA AMRABERIA MAHISHREKHA UNDER ULUBERIA DIVISION
Improvement of Water Supply with New laying of 110 mm dia HDPE pipe line with providing valve and other allied works from 67, Madhusudhan Biswas Lane upto 96/2, Madhusudhan Biswas Lane under ward no- 19 of HMC.
Inter connection between HDPE pipe and D.I pipe at street no. 183,185,187,192,194,200,202,204,224 ,226,228 , 238 and other ancillary work in CE Block within the command area of Tank no.-6 and other ancillary works under Newtown Kolkata Water Supply
Supplying and laying of HDPE pipe from 110 mm to 160 mm dia (OD) distribution main with temporary road restoration ........Amrapally near H/O Babul Shaw to Bapan Adhikary at Ward no. 1 and 2 of Naihati Municipality
Balance work for Supplying laying fitting fixing of HDPE pipe line from Kolaboni Zone -II OHR site to Bakdisha village , Velagora Village Takhrapara village to Susunia village for increase pressure of Retrofitting works in connection with Jal J
Interconnection between New Tube Well and Existing UPVC/DI/HDPE pipe line in connection with Source Augmentation of DakshinMahendrapur Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of We
Improvement of Water Supply with New Laying of 110 mm dia HDPE pipe line by provding Valves including Road restroration works from 2/3, Narasingha Bose lane to 21/2, Narasingha Bose lane and 310, Netaji Subash Road
Network PTZ Camera, Twisted Pair Cable, Cat6, Cat6 UTP, Elect cable, Power outlet, Network Switch, Fiber CABLE, Fibre Joint Box, HDPE Pipe, Elect wire, Fiber splicing, other items, Wiring Charges, Fiber laying charges, Installation Charges, Copper elect wire
Supplying, laying, fiting, fixing and jointing by HDPE pipe for Distribution Main along with making MS Tee and ancillary works at Baraamjhor village due to Strengthening - Widening of road from Pirorgari More to Brahamandiha by PWD (Roads) Dte.
Supplying, deliver and Laying of distribution network(110mm HDPE Pipe) along street no. 202 in CE Block within the command area of Tank no.-6 and other ancillary works under Newtown Kolkata Water Supply Division-I PHE Dte.
Supplying laying Parallel HDPE pipe and Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SAPNA) at different habitation and other allied works of Puncha W/S Scheme of Purulia Sadar Sub_Divisio
Laying of HDPE pipe line and supplying fitting fixing of different dia. CIDF sluice valve and fitting and Construction of valve chamber in connection with retrofitting Chingani and adjoining Mouzas Water Supply Scheme under Onda Water Supply Scheme
Laying of HDPE pipe by Horizontal Directional Drilling (HDD) process for crossing river at Ateswartala Radhakantapur Road in Mathurapur-II Block for Secondery Grid of Mega Surface Water Based Water Supply Scheme for Falta-Mathurapur, District-South 2
Distribution Main by supplying an laying of different dia HDPE pipe line and Functional Household Tap Connection (FHTC) including other allied works of Manguria Lalpur Water Supply Scheme at Hura Block of Raghunathpur Sub Division under Purulia Div
Balance work such as Left out FHTC, Laying of HDPE Pipe line, Road restoration and other ancially work for Kalikapur PWSS(SM/14053) under KATWA -I Block under Katwa Sub-Division under Burdwan Division, PHED, District- Purba-Bardhaman
Laying HDPE Pipe Line from Beladi more to Barabagan Junior High School to Cover Balia, Basulitora, Rangametya mouzas for construction and commissioning of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Mission (JJM) and JAL
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SAPNA) at different habitation Supplying laying of HDPE pipe through CWR for Distribution System of Puncha W/S Scheme of Purulia Sadar Sub_
Supplying laying fitting fixing of HDPE pipe from Manguria-Lalpur OHR site Zone -II main distribution pipe line to Kusmagora Village to increase pressure of Retrofitting works for creation of FHTC (Functional House Hold Tap Connection) in conne
Laying HDPE Pipe Line from Radhaballav more to Ampahari Village to increase water pressure at Ampahari mouza of retrofitting works for creation of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Mission (JJM) and JAL
Improvement of supply of water in Nandypara by new laying of 160 mm dia and 110 mm dia HDPE pipe with incidental works from Sastitala Kona Road to house of Sri Narayan Chandra Pal in ward no - 48.
Supplying laying fitting fixing of HDPE pipe from Manguria-Lalpur OHR site Zone -II main distribution pipe line to Chatumather Village to increase pressure of Retrofitting works for creation of FHTC (Functional House Hold Tap Connection) in con
Supplying, deliver and Laying of distribution network (110mm HDPE Pipe) along street no. 202 in CE Block within the command area of Tank no.-6 and other ancillary works under Newtown Kolkata Water Supply Division-I PHE Dte.
Laying of HDPE pipe by trenchless method using Horizontal Direct Drilling method at different location under Zone-I and Zone-V of Tapan Western Sector under Tapan Sub-Surface water based piped water supply scheme, at Tapan Block
Improvment of Water Supply with New Laying of 110 mm dia HDPE pipe line provding Valve with other allied works from 67, Mahendra Bhattcharjee to HIT Quater on New Approch Road under ward no- 43 of HMC area
PIPE LINE TO BE LAID OF 110 MM DIA HDPE PIPE LINE AT 35, RAJ KUMAR MUKHERJEE ROAD TO 42, RAJ KUMAR MUKHERJEE ROAD AT WARD NO-10 UNDER BARANAGAR MUNICIPALITY (SCHEME ID-APAS/01/113/100/0002)
Laying of HDPE Pipe line, Construction of Pump House cum chlorine room, Construction of Pump House and Toilet at head work site and Boundary wall under Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block
Relaying of distribution main by HDPE pipe along with allied works for Strengthening - Widening of road from Moukura Pitch road to Bardi Nadighat by PMGSY of Augmentation works for Belatikri, Zone-A Water Supply Scheme under Sarenga Water
Laying HDPE Pipe Line with in Pachirdang Village to increse pressure in Pachirdanga mouzas for construction and commissioning of FHTC (Functional House Hold Tap Connection in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of ANCHURI (Zon
Evacuation of 11 kV power from ESR Sub Station by manual laying and micro tunneling of 11 kV 3C,300 sq mm XLPE cable through and with supply and laying of 160 mm HDPE pipe under Uluberia Division
Improvement of water supply by New Laying of 160 mm dia HDPE pipe line including Road restoration work and other allied works from 10, Narasinha Dutta Road to 33, Bholanath Kabiraj Lane under ward no- 23 of HMC
Improvement of Water Supply with New Laying of 110 mm dia HDPE pipe line with other allied works from holding no - 61/48, P Road upto 66, P Road under ward no 8 of HMC.(15th FC SWM)