Loading…
Loading…
9,717 results • Best match
Creation of new source of drinking water by sinking of tube well with PVC pipe near the house of Bijoy Halder at Kenkopara JL No 8 at Mouza Madhusudanpur under Madhusudanpur GP Activity Code- 118750120 of 25-26
Estimate for Sinking of a Deep Tube Well of 300mm X 200mm dia and 200 meter deepwith PVC pipe Fibre Glass strainer at Shitala Mandir Boro Pukur Para in Ward No 10 within Kharar Municipality under SWM Project
Installation of 2 Nos. Submersible pump within 80 mm dia and 72 m depth PVC pipe ...(i) Bandanga (ii) Susmita pally (iii) New MS Structure stand at Goyal Para Das Para in ward No-01 under Bolpur Municipality
Installation of 1 Nos. Submersible pump within 80 mm dia and 72 m depth PVC pipe for withdrawn water of drinking tubewell by using Water jet system..Sabuj pally Kuno Park in ward no 11 under Bolpur Municipality
Sinking of 250mm X 150mm dia Tube Well, 180m deep top enlargement 250 mm. dia with PVC Pipe at Kachari Road, Near Existing Over Head Reservior, Ward No.- 04 under Water Supply grand at Katwa Municipality.2nd Call
NIT NO 5/23_24/ RIDF XXXI_STW_DRIP_JAL(AI)DIV/1 Installation of 1 no new clustered 6 Shallow Tubewell with DRIP with PVC pipe at Dakshin Kamsing At Dakshin Kamsing JL No29 block AlipurduarI district Alipurduar PIC No R291900303
NIT NO 5/23_24/ RIDF XXXI_STW_DRIP_JAL(AI)DIV/3 Installation of 1 no new clustered 6 Shallow Tubewell with DRIP with PVC pipe at Tatpara Kayakhata At Tatpara Kayakhata JL No85 block AlipurduarII district Alipurduar PIC No R291900307
NIT NO 10/23_24/ RIDF XXIX_STW_SPA_JAL(AI)DIV/4 Installation of 1 no new clustered 6 Shallow Tubewell Solar with sprinkler with PVC Pipe at Churabhandar I At Churabhandar JL No83 block Maynaguri district Jalpaiguri PIC No R291900335
Supply and Laying of Clear Water Rising main pipe line D.I.-K9 MS Pipe including supply of DI Specials and permanent Road restoration for Water Supply Scheme within Zone - F within Basirhat Municipal area in the District North 24 Parganas unde
Supply of Materials (Valve,DI Fitting, MS pipe and Flange etc.) including Loading, Unloading and Stacking properly for Day to day O and M of distribution system and Rising Main for entire project of Bankura- I,II and Barjora Block
Laying Secondary Rising Main of different dia MS pipe pipe at Jeonge more and along Sarisha-Noorpur Road under Diamond Harbour-II Block in connection with Mega Surface Water Based Water Supply Scheme for Falta-Mathurapur Dist. South 24-Pgs.
Installation of 1200 mm dia Butterfly Valve and construction of valve chamber for the Primary Grid Rising main of 1219 mm dia MS pipe near Mandirbazar P.S. and Washout arrangement at Ektara Bridge in connection with Mega Surface Water Based Water
Withdrawing and relaying 300 mm dia DI (K9) Rising main pipe line near Bheduasole rail gate an OHR site and Replacement of 300 mm dia MS pipe line at Bheduasole more NH Road crossing portion and Construction of sluice valve chamber
Replacement of MS pipe line and construction of spout chambers of sabanpur govt. Owned and operated major RLI scheme within onda dev. Block under Bankura-II(A-M) Sub-Division under Bankura(A-M) Division under NP/MTN Programme 2025-2026..
Emergency Leak repairing work to 600 mm dia D.I. rising main by replacement it with MS pipe coming from Panihara Water Treatment Plant to New Barrackpore Municipal Area infront of Noor Alam House beside Eidgah, Panihara Road at ward no. 17
Emergency Leak repairing work to 600 mm dia D.I. rising main by replacement it with MS pipe coming from Panihara Water Treatment Plant to New Barrackpore Municipal Area infront of Eidgah maidan, Panihara at ward no. 17 under Madhyamgram Municipality
Pushing of 600mm dia MS pipe and 100 mm dia GI water carrier pipe by hydraulic jacking method across rail road for laying Distribution Main for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (J.J.M.) at Ch
Supplying and laying of 450mm dia (ID) MS pipe line for interconnecting the CWPS, Phase II to manifold connection to existing UGR cum Pump House of HMC Manifold connection of existing 1MG capacity UGR of KMDA including permanent road restoration...
Restoration of road for proposed 600 mm dia MS pipe laying along BBT Road by open cut method by KMDA from Matri Sadan Gate to Subhas Uddan More under the South 24 Parganas Division, P.W.D. in the year 2022-23
Design and execution of MS pipe bridge over water way to carrying water pipe upto 300 mm Dia complete in all respect as per direction of engineer-in-charge in Ward No. 32 b) At Gangarampur Bridge (near Gangarampur High School)
Supplying and Laying of 250 mm dia. (ID) MS pipe conduit 50 Mtr. Length (in each location) to be prepared from 12 mm thick plate by HDD.....(including obtaining Permission from Rail way Authority) under Champdani Municipality under AMRUT 2.0.
Supplying, fabrication and insertion of 200 mm dia (ID) and 16mm thick MS pipe line 80 mtr. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique for crossing National Highway-117 at Sarisha Ashram More within Diamond Harbour-II block for Layin
Pushing of 600mm dia MS pipe and 100 mm dia MS water carrier pipe by hydraulic jacking method across rail road for laying Distribution Main for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (J.J.M.) at Ba
Supply, delivery at site , Laying of rising main of 350mm dia MS pipe for Tank no 7 , 8 from existing water supply rising main at AA ID and other ancillary works under New Town Kolkata Water Supply Division I, PHE Dte.
Emergency Leak repairing work to 600 mm dia D.I. rising main by replacement it with MS pipe coming from Panihara Water Treatment Plant to New Barrackpore Municipal Area infront of Sk. Aminul Builders, Panihara Road at ward no. 17 under Madhyamgram...
Supplying, fabrication and insertion of 350 mm dia (ID) and 16mm thick MS pipe line 60 mtr. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique for crossing National Highway-117 at Sarisha 246-More within Diamond Harbour-II block for Laying
Design, Composition, Supply and Installation of 4 inch. thick box having size 900mm X 1800mm showing details of scheme made from MS pipe and cladded with 3mm Router cut ACP sheet, LED Modules of Samsung or Equivalent with appropriate power supply
Crossing road by 300 mm dia MS carrier pipe by Jack pushing method, inetrconnection of MS carrier pipe with UPVC and DI pipeline including fabrication of MS pipe and allied works for Augmentation of Beliatore Piped Water Supply Scheme (JJM Revision)
Canal crossing of 02 nos. location due to laying thick MS Pipe with supplying and fitting fixing for 2 nos. gap filling in the distribution system under the Augmentation scheme of Zone-II of Diamond Harbour-II Block. (2nd Call)
PVC PIPE 1 INCH, PVC PIPE 3 BY 4 INCH, PVC PIPE HALF INCH, Elbow PVC 1 INCH, Elbow PVC 3 BY 4 INCH, Elbow PVC HALF INCH, Elbow Metal 1 INCH, Elbow Metal 3 BY 4 INCH, Elbow Metal HALF INCH, Tee Pvc 1 INCH, Tee Pvc 3 BY 4 INCH, Tee Pvc HALF INCH, Tee ... 350L, PVC PIPE 3 ... INCH, PVC PIPE 4 ...
R.C.C. Over Head Reservoir (OHR) (Intze Type) of 650 cum capacity with 20 m Staging height including supply of HDPE Pipe, PVC-O D.I.(K-7) and M.S. Pipes with all Specials, Valves with valves chambers at Zone-3 within Egra Municipality
Laying of Left-Out portion HDPE Pipe line under Surface Water Based Water Supply Scheme at Zone-IX-A due to uncovered area of this Zone and damaged pipe line at different Nodal Point under Tamluk Sub-Division of Tamluk Division, PHE Dte.
Laying of hume pipe 600 MM dia and laying of 48 mtr 315 mm dia HDPE pipe for widening of NH2 crossing at Budbud more fly over of Mankar Water supply scheme within Galsi -I Block,under Durgapur Sub Division,PHE Dte.
Repairing of existing 200mm and 150 mm DI rising main pipeline and Providing Functinal household tap connection (FHTC) at Baligara Village and Laying of HDPE pipe and MS Casing Pipe and other allied works under Lagda W/S Scheme under Purulia Divisio
Laying of HDPE Pipe by Micro tunnelling and Manual laying of 33KV 400 Sq mm XLPE 3C cable having length 0.982KMfrom Kalipur More to Mathura Math to Complete the 33KV dedicated source of Laxmipur 33 11Kv Sub Station from Vikdas 400KV Substation
G.I pipe column with M.S. Structure for laying of HDPE pipe line with Casing at Kanchanpur Water Supply Scheme under Haldia Sub- Division of Tamluk Division, PHE Dte. Total Length 60.00 mtr, NP-21 to 27 30.00 mtr NP-44 to 50 30.00
Emergent road restoration work due to laying of 225 mm dia. and 90 mm dia. HDPE Pipe line from Khajurdihi Bazar to Khajurdihi football play ground in connection with Khajurdihi PWSS (SM/18484) under Katwa-I Block under Katwa Sub-Division PHE Dte
Replacement of damaged 150 mm dia HDPE pipe and cleaning of pipe line to prevent entering of dirty water into the pipe line at the areas of KajiSaifulAlam lane along with ancillary works under HMC Ward no - 35 under PARAY SAMADHAN Programme.
Const. of ug electri.cable conduit by supplying and laying 100mm dia HDPE pipe and G.Ipipe including renovation of existing pavement Motor Vehicle to R.S Soft only right side pavement and R.S. Softto Cros of Ring Road Both side pavement) on Street 11
Augmentation of laying distribution system by 150 mm dia. HDPE pipe from Pump House No- 1 to Beluni more of Dhola PWSS under Zone-VI of Kulpi Block within Mega Surface water-based water supply scheme for Falta-Mathurapur, District South 24 Parganas.
Laying of HDPE Pipe by Micro tunnelling and Manual laying of 33KV 400 Sq.mm XLPE 3C cable by Micro tunneling and Manual Excavation having length 1.62KMfrom Kalipur More to Mathura Math to Complete the 33KV dedicated source of Laxmipur 33 11Kv Sub
Re erection of 17 nos street light poles LED street lights including construction of new RCC foundation for street light poles supply and laying of LT power cable HDPE pipe etc for the street lighting system at Nimtouri Bazar Area under Tamluk Block
Supplying, deliver and Laying of 160 mm HDPE Pipe along MAR-1111 from Kalakhetra /CBD-2 metro station to Newtown Metro Station/ Mother wax museum for water supply at Metro stations within AA-II and other ancillary works under Newtown Kolkata Water S
Laying of 90 mm dia HDPE Pipe Lines With allied works to accommodate Total 4893 nos FHTC of Augementation of Contai Saline Area Zone -III (Phase-B) Water Supply Scheme within Contai-I Block under Contai Sub-Division of Tamluk Division, PHE Dte.
Sl No 08 Providing functional household tap connection FHTC and laying 90 mm OD HDPE pipe from house of Dulal Biswas to house of Sunil Sikdar and house of Kalipada Mondal to Zamatulla SSK at village Shyamdhan and habitation Shyamdhan and allied works
laying of 11 KV 3C 300 sq mm XLPE cable 1.35 KM including micro-tunneling with HDPE pipe 160 mm dia 1.2 KM (Dedicated Feeder) iro HT Bulk service connection to APOLLO MULTISPECIALITY HOSPITALS LTD at 366 Paik Para Road PO Narendrapur
Laying of Heavy Duty HDPE Pipe by Micro tunnelling and Manual laying of 3 3C 11KV 300 Sq.mm XLPE cable by Micro tunneling 1.86 km and Manual Laying having 2.46Km for drawl of New 11 kv line to Singur Argo Industrial Park.
Micro tunneling with 200 mm and 160 mm dia HDPE pipe (PE-80, PN-6) and laying of 33 kV,3C,300 sq mm and 11 kV,3C,300 sq mm XLPE cable for NH6 crossing from Dhulagarh to Panchla under Uluberia Division
Laying of 160 mm. dia., 200 mm. dia. and 250 mm. dia. HDPE Pipe (Grade PE-100, PN-10) Rising Main Pipe line for interconnection of Keshabpur Jalpai Water Supply Scheme under Haldia Sub-Division of Tamluk Division, PHE Dte. Purba Medinipur.
Retrofitting of FHTC (200 nos.) and Laying of Left-Out portion HDPE Pipe line under Surface Water Based Water Supply Scheme at Zone-V due to uncovered area of this Zone and damaged pipe line at different Nodal Point under Tamluk Sub-Division