Loading…
Loading…
9,718 results • Best match
LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L-1.050 KM (DOUBLE CKT) 33 KV SOURCE FROM THUMPSUP TO ARRJAVV 33/11 KV SUB-STATION,DIST.-HOOGHLY UNDER SERAMPORE DIVISION OF HOOGHLY REGION, WBSEDCL.
Improvement of water supply by New Laying of 110 mm dia HDPE pipe line including Valves with other allied works Road restoration works from 11/38, Balai Mistri Lane to 11/26, Balai Mistri Lane via 11/23, Balai Mistri Lane under ward no- 38 of HMC.
Laying of 90 mm (O/D) HDPE pipe from Subhash Purkait house to Pulak Das house via Niranjan Saha house within Beliadanga mouza, Dakshin Barasat GP of Joynagar-I Block under Zone-49 of surface water based W/S scheme in the arsenic affected areas of SWD
Improvement of water supply with New Laying of 110 mm dia HDPE pipe line near 84, B Road, and 98, B Road and existing 150 mm dia C.I Pipe Line to be cleaned and washed to remove contamination by cut and flash work by providing valve near
Improvement of Water Supply with New Laying of 160 mm dia HDPE pipe line including Road restoration work and other allied works from 1, Dharma Das Ganguly Lane to 21/22, Atindra Mukherjee Road via 12/1,Dharmas Das Ganguly Lane under ward no- 30 of
WORK FOR LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L 2.580 KM FROM TALDANGA SUB STATION TO MIARBERMORE FOR MOGOLTULI 33/11 KV SUB STATION TOWN CHINSURAH DIST HOOGHLY IN IPDS CND DIVN
WORK FOR LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L 0.925 KM FROM BAGPARA TO KEVENTERS 33/11 KV SUB STATION TOWN RISHRA DIST HOOGHLY IN IPDS SCHEME UNDER SERAMPORE DIVISION OF HOOGHLY
WORK FOR LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L 0.71 KM FROM KUSUM FACTORY GATE TO NAYABASTI MORE FOR KEVENTERS 33/11 KV SUB STATION TOWN RISHRA HOOGHLY IN IPDS SCHEME SERAMPORE
Resinking including supply of pipe and strainer and along with Interconnection work for the DTW at Bhar Factory PH within Kanaipur GP under Uttarpara Zone-IV FAWS Scheme.
Resinking including supply of Pipe and Strainer and along with Interconnection work for the DTW at at Jagganathpur PH within Rishra GP under Serampore Zone-II FAWS Scheme
Installation of Submersible Pump and Supply of Pipe line from Gokul Mandal House to Goutam Kuilya House at Samaspur Village JL NO-279 PLOT NO-425 to 319.
Sinking of Deep Tube well
Electro mechanical works
CP Pillar Cock, PTMT Pillar Cock, PTMT Bib cock., Cotton thread, GI Reducer Elbow 15X20 mm, GI Union 15 mm., GI Socket 15 mm., GI Socket 20 mm., GI Nipple 15 mm., PTMT Ball cock set 15 mm., Gate Valve 20 mm., GI Pipe 15 mm., GI Pipe 20 mm., GI Plug 15 mm., GI Plug 20 mm., Steel sink Jalli., Capacitor 3.15 MFD, Insulation tape, 40 watt Choke., Starter, Batten Holder, Tube light holder, 6 Amp Switch, 6 Amp Socket, Regulator 2 Pin, 6 Amp MCB SP, 16 Amp Switch, 16 Amp Multi Socket, TPN MCB 40 Ampere, TPN MCB 63 Ampere BOQ Title PURCHASING OF BOQ ITEMS
Wall Shelves - Handcrafted (Q3), Soap Dish - Case (Q4), Health Faucet (Q3), Cushion for sofa set Size 22 Inch x 22 Inch x 4 Inch, PVC Seat and Back for chair verandah, PVC Seat for Chair Dining JCO and OR, Readymade cloth Cover For Cushion Size 22 ... Inch, UPVC pipe 15
Supplying an laying of left out pipe line of 110 mm dia 75 mm dia UPVC pipe for Zone-I an Zone-II of Rejuvenation of Bongabari W/S Scheme under Purulia Sadar Sub-Division, PHE Dte. Node 10-11, 20 p-22 for zone-I an Node 69-67 67-60 60-64 67-7
SPL REPAIR FOR REPLACEMENT OF OLD RUSTED GI RISING MAIN FOR BOREWELL SUPPLY WITH CPVC PIPE AT BLDG NO P-127 P-128 P-129 P-152 P-153 P-161 P-162 P-118 P-120 P-100 P-143 P-145 P-146 P-147 P-149 P-178 P-113 P-117 OF ECHS, TC(EC) and CMDC PERS LINE UND
SUPPLYING AND LAYING 100MM DIA. DI PIPE LINE NEAR P-83/D, P-83C MUDIALY RD AND P-181/1, P-181/D, P-196 TIKIAPARA AND G-181/A, G172 AND H-128, H-125, H-125/1, H-125/D SHYAMLAL LANE IN WARD NO-135, BR-XV.
SUPPLYING AND LAYING 100MM DIA. DI PIPE LINE NEAR G-407/2, G-391/1 RAMNAGAR LANE AND J-8, J-17, J-9 MATHERPARA LANE AND G-3/94/B AND G-309, G-377, G-366/2, G-367, G-367/G ALIFNAGAR IN WARD NO -134, BR-XV.
LAYING OF 100 MM DIA DI PIPE LINE AT KHUDIRAM PALLY, ANANDA NAGAR FROM (1) PR.NO-AC 31/13/14 TO ROY FURNITURE TO H/O LALTA PRASAD SHAW (2) PR.NO. C/25/19/18/F TO PR.NO. C/25/19/9A ,H/O SWAPAN PAL ETC IN WARD NO-126.
(PART-A) Sinking of a Deep Tube Well of 300 mm x 200 mm. dia. And 180 metre deep with P.V.C. pipe and Fibre Glass strainer and(PART-B) construction of a Pump House and(PART-C) installation of submersible Pump and Laying of DI Pipe in ward no 10
IMPROVEMENT OF WATER SUPPLY NETWORK BY LAYING 100MM DIA. DI PIPE LINE NEAR PRE. NO. B-64/B, B-75/1B, B-63, B-75/1A/1, B-61,B-65, B-65,B-54, B-58, B-67, B-68 ETC IRON GATE ROAD IN WARD NO -135, BR-XV.
RESTORATION OF ROAD BY C.CON/I.P NEAR PR NO Y-94/13,Y-156/A,Y-2/164/A,Z-3/162 ETC. AT KHALDHARI BYE LANE, DR. AK. ROAD, KANTHAL BERIA LN ,SATGHARA ROAD DUE TO LAYING OF DI PIPE WATER SERVICE MAIN IN WARD NO-140,BR-XV.
DEVELOPMENT OF WATER SUPPLY NETWORK BY LAYING 100MM DIA. DI PIPE LINE NEAR PRE. NO. P-188, 187, 189 RAMESWARPUR ROAD AND G-5, 11/A/1, 7 DHANKHETI LANE AND I-23, 34/1 KASAIPARA LANE AND H-10, 11 GULAM ABBAS LANE IN WARD NO-135, BR-XV.
(PART-A) Sinking of a Deep Tube Well of 300 mm x 200 mm. dia. And 180 metre deep with P.V.C. pipe and Fibre Glass strainer and(PART-B) construction of a Pump House and(PART-C) installation of submersible Pump and Laying of DI Pipe in ward no 13
DEVELOPMENT OF WATER SUPPLY NETWORK BY LAYING 100MM DIA. DI PIPE LINE NEAR PRE.NO-X-74,X-74/A, X-74/1, X- 78/A AND.Z-3/293/A,Z-3/293,Z-3/296 ETC.KHALDHARI ROAD AND RIVER SIDE ROAD( KACHARI BARI ROAD) IN WARD NO - 141, BR- XV.
IMPROVEMENT OF WATER SUPPLY NETWORK BY LAYING 100 MM DIA DI PIPE LINE NEAR PRE.NO. Y 2/172/2,Y 2/180/1, Y 2/180/2/A,Y 2/180/11, Y 2/169,X 121/1,Y 2/180/23 ETC.KHALDHARI BYE LANE IN WARD NO 140,BR XV.
(PART-A) Sinking of a Deep Tube Well of 300 mm x 200 mm. dia. And 180 metre deep with P.V.C. pipe and Fibre Glass strainer and(PART-B) construction of a Pump House and(PART-C) installation of submersible Pump and Laying of DI Pipe in ward no 16
(PART-A) Sinking of a Deep Tube Well of 300 mm x 200 mm. dia. And 180 metre deep with P.V.C. pipe and Fibre Glass strainer and(PART-B) construction of a Pump House and(PART-C) installation of submersible Pump and Laying of DI Pipe in ward no 17
RESTORATION OF ROAD BY C.CON/I.P NEAR PR NO Y-2/181/1,Y-2/156/21,Y-2/130,Y-155,Y-2/136,Z-3/215 ETC. AT JELIAPARA , TAPAPARA ,KANTHAL BERIA,SATGHARA ROAD DUE TO LAYING OF DI PIPE WATER SERVICE MAIN IN WARD NO-140,BR-XV.
REPLACEMENT OF 100 MM DIA OLD PVC PIPELINE BY LAYING OF 100 MM DIA DI PIPE AT 6.30 TO 6 32B 6.A TO END CAP 3 82 TO SALIL CHOWDHARI MANCHA C.R.COLONY 318 TO 259 WEST RAJAPUR AND 195 TO 143 U.B SARANI IN WD NO 102 BR XII.
DEVELOPMENT OF WATER SUPPLY NETWORK BY LAYING 100MM DIA. DI PIPE LINE NEAR PRE. NO. Y-2/180/10/A, TO Y-2/180/16/A, Y-2/172/20 TO Y-2/101/65/3 TO Y-2/ 172/15 ETC.BAGDIPARA LANE (SANTI NAGAR) IN WARD NO -140, BR-XV.
DEVELOPMENT OF WATER SUPPLY NETWORK BY LAYING 100MM DIA. DI PIPE LINE NEAR Y -98, Y -100/C/3 MADARSAHEB MATH LANE AND Y -324/A, Y -326/1 MADAR SAHEB MATH RD AND T -21/A/6, T -21/C/1 HERUMATH LANE IN WARD NO -138,BR-XV.
Octagonal Pole with Single Arm or Double Arm Brackets (Q3), Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418 (Q3), Hdpe Pipes For Water Supply-IS 4984 (Q4), Slamps (Algorithm based Street Light Automatic Switch) (Q3), Earthing Rod-IS 3043 (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Octagonal Pole with Single Arm or Double Arm Brackets (Q3), Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418 (Q3), Led Luminaire (For Road And Street Lights)- IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3), Earthing Rod-IS 3043 (Q3), ... (Q3), Hdpe Pipes For ...
Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418 (Q3), Hdpe Pipes For Water Supply-IS 4984 (Q4), Slamps (Algorithm based Street Light Automatic Switch) (Q3), Earthing Rod-IS 3043 (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3), Octagonal Pole with Single Arm or Double Arm Brackets (Q3)
referred to NIT
Resinking of 300 mm x 200 mm Dia DTW including supply of Pipe and Strainer accessories with ancillary works at Battala PH within Nabagram GP under Nabagram FAWS Scheme
Pipe line shifting including supply of pipe and Acessories i. H/O Jibon Hazra to polly sree club via upto Mordern sceity in ward no - 13 under Dankuni Municipality
Sinking of deep tube well
OFC 12 Core Armoured, Fiber Patch Pannel with E2K connector, Layer 3 Network Switch, LAN Extender Optical, 5KVA Online UPS with External Bty, 9U Rack with all accessories, 32U Rack with all accessories, SFP 40Km Extended Range, HDPE Pipe 40mm, Cable Warning Tape, Laying Charges of OFC, ROW Charges
Supply, delivery and Laying of 110 mm dia HDPE pipe line by HDD method along street no. 267 an 265 within the command area of Tank-8, AA-I and replacement of 350mm dia valve at H/W site and other ancillary work under Newtown Kolkata Water Supply Di
work for Laying of Heavy Duty HDPE Pipe by microtunelling and laying of 33 KV 400 sqmm XLPE Cable (3C) of R/L-0.620 Km (Double Ckt Tripple Cable) for shifting of 33 KV Mogra-I and Mogra-II Feeder from pond adjacent of Mogra Railway Crossing to Swit
Laying of 6.0 KV XLPE cable of size 3 Core X300 sqmm through Micro Tunneling method from CESC intake room to Main Electrical Substation to extend the 6.0 KV power supply by crossing the Railway tracks with 200 mm dia HDPE pipe of PE-100 PN-10 Rating
Drawl of a new 11 KV Feeder by laying of 3 C XPLE 300 sq mm by Microtunneling work of 420 Mtr with laying of HDPE pipe from Gouripur 33/11 KV substation for bifurcation of existing Hazinagar 11 KV and Hazinagar-I 11KV Feeder under Naihati Division
Re-routing of 33 KV line by laying of 3C XPLE 400 sq mm by Micro tunneling work of 415 Mtr with laying of HDPE pipe (200sq mm PE-100, PE10) for Railway crossing at Kanchrapara Kalyani Rail crossing and Road crossing near SNR Carnival under Naihati Di
Schedule of work for Laying of Heavy Duty HDPE Pipe by micro tunnelling and manual laying of 33 KV 400 Sq mm XLPE CABLE 3C of RL 2.40Km for drawl of new 33 KV UG line from Chanditala GSS to existing Chanditala Mother Dairy CKT II near Mahadeva Fac
LAYING OF HEAVY DUTY HDPE PIPE BY MICROTUNELLING AND LAYING OF 33 KV 400 SQMM XLPE CABLE (3C) OF R/L-1.020 KM (DOUBLE CKT) 33 KV SOURCE FROM RADHIKA EXP. TO LUX FOR ARRJAVV 33/11 KV SUB-STATION,DIST.-HOOGHLY UNDER SERAMPORE DIVISION OF HOOGHLY REGI
Schedule of work for Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying of 33 KV 400 Sq.mm XLPE CABLE 3C of RL-3.942 Km for 33 KV Source from Nezone Tube Ma Ambe Ware House to Par Dankuni Raghunathpur SS Area and ShriraM G City
Laying of Heavy Duty HDPE Pipe by microtunelling and manual laying of 33 KV 400 Sq.mm XLPE CABLE 3C of RL 2.333 Km for 33 KV Source from Rishra GSS to Bangihati More and from near Divine Forging to near Trishan Metel for 33 11 KV Sub-Station