Day to day carriage of different materialsLike DI Pipes, DI Fittings,AC Pipes ,MSERW Pipes,GI Pipes,Ferrule,TMT Bar et.c from Rajarhat Stores under Resources Divn,P.H.E.Dte to different work sites in rural urban areas in any area of WB
Day to day carriage of different materialsLike DI Pipes, DI Fittings, AC Pipes ,MSERW Pipes,GI Pipes, Ferrule,TMT Bar e.t.c from Rajarhat Stores under Resources Divn , P.H.E.Dte to different work sites in rural urban areas in any area of WB
Day to day carriage of different materialsLike DI Pipes, DI Fittings, AC Pipes ,MSERW Pipes,GI Pipes, Ferrule,TMT Bar e.t.c from Kalyani Stores under Resources Divn , P.H.E.Dte to different work sites in rural urban areas in any area of WB
Day to day carriage of different materials Like DI Pipes,DI Fittings,AC Pipes,MSERWPipes,GI Pipes,Ferrule,TMT Bar e.t.c from Kalyani Stores under Resources Divn, P.H.E.Dte to different work sites in rural urban areas in any area of WB
Day to day carriage of different materials Like DI Pipes,DI Fittings,AC Pipes,MSERW Pipes,GI Pipes,Ferrule,TMT Bar e.t.c from Kalyani Stores under Resources Divn ,P.H.E.Dte todifferent work sites in rural urban areas in any area of WB
Interconnection of distribution system by laying of DI and HDPE pipes along with bridge/culvert crossing and other allied works at Shrinathpur TG Adjacent to Samuktala PWSS (Zone-I) under Alipurduar Division, PHE Dte.
Laying of HDPE pipes with allied works at Left Out Portion of PART-L for Augmentation of Mukutshila Zone II PWSS within Khejuri-I Block under Contai Sub-Division of Tamluk Division PHE Dte.
Supplying and laying of HDPE Pipes including Supply of Valves and Specials along with permanent Road restoration for Zone-A, at part of ward no. 12, 14, 15, 16 within Jangipur Municipality for Water Supply Scheme Under AMRUT- 10338 m
Flow control of rising main and distribution system by different dia GI pipes, Non return valves and sluice valves (as per relevant IS Standers, complete in all respect) for Kalajharia under RCFA Division-I PHE Dte.
Withdrawing AC/CI pipe line and laying D.I./UPVC pipe line of..under Reju. of Bhagwanpur Zone - I and its adjoining W/S Scheme under Contai Sub-Division of Tamluk Division, PHE Dte. (Part-C).
Installation of 1 No Clustered (6) LDTW (Solar) (Depth 120m) with PVC Pipe at Karui (J.L. No. -49) within Katwa (A-I)Sub- Division in Karui G.P.,Katwa -II Block, Plot No -859, 4412, 4794, 5296, 10530, 7627
Installation of 1 No Clustered (04) LDTW (Solar) (Depth 120m) with PVC Pipe at Keshabpur (J.L. No.- 66) within Burdwan (A-I) Sub- Division in Gopalpur G.P.,Kanksa Block, Plot No -368, 118, 969,213 ( LAT-23.530663N, LONG- 87.412819E)
Installation of 1 No Clustered (6) LDTW (Solar) (Depth 120m) with PVC Pipe at Mallikpur (J.L. No. -76) within Burdwan (A-I) Sub- Division in Gohogram G.P.,Galsi-II Block, Plot No -1373, 1335, 1451, 1426, 1519, 2170
Installation of 1 No Clustered (04) LDTW (Solar) (Depth 120m) with PVC Pipe at Ijjatganj (J.L. No.- 71) within Burdwan (A-I) Sub- Division in Tilakchandrapur G.P.,Kanksa Block, Plot No -345, 295, 192,06 ( LAT-23.478065N, LONG- 87.443322E)
Repairing of office cum godown house, land development concrete road and replacemnt of damaged UPVC pipe line at Dignagar of Aushgram-I block under Dignagar PWSS (O and Mtc) under DWSD,PHE Dte
Reparing ,shifting and replacing of UPVC pipe line and allied works at Fulbagan More to WBSEDCL office under Augmentation of RCFA Part-III (Zone-II) piped W/S Scheme under DWSD ,PHE Dte
Laying of 110mm (OD) Dia. and 160mm (OD) Dia. HDPE pipe (PE -100 and PN -6) at Aurobinda Pally (Ward - 20), Natunpally (Ward -18), Under DMC.
Supplying, laying of HDPE pipe line for water supply of Jamuria Zone XII at Bijpur OHR under AMRUT 2.0 Scheme within Asansol Municipal Corporation.2nd Call
Extension of pipe line from existing pipe line repairing of leakage/bursting and replace old damaged AC pipe line with HDPE pipe of Kanksa (Zone-I)
Laying of different dia HDPE pipe at Narayankuri Pump House to Mathura Chandi Burning Ghat under RCFA Part-II PWSS under RCFA Division-I PHE Dte.
Laying of HDPE pipe line for left out house hold connection at Ethelbari TG PWSS(SM/13449) of Birpara Sub-Division under Alipurduar Division, PHE Dte.
REPAIR/ REPLACEMENT AND MAINT OF CI/GI/DI/ PPR PIPE LINE AND HDPE PIPE LINES AND CONNECTED WKS AT OTUSIDE FORT WILLIAM UNDER GE (FW) KOLKATA
Laying of HDPE pipe from behind Mohishila OHR goli and Padma Pukur Par for development of drinking water supply ward no.86 under AMC 2nd Call
Laying of different dia HDPE pipe line towards Ruidaspara under Dakshin Khanda (Jl No. 36) area Block Andal of RCFA Division-I PHE Dte. (Part-B)
SUPPLYING AND LAYING OF OPVC, HDPE PIPE LINE INCUDING ALL FITTINGS, ROAD RESTORATION WORK AT WARD NO 18, 19, 59 OF KULTI WITHIN ASANSOL MUNICIPAL CORPORATION.
Additional for laying 90 mm dia HDPE pipe including allied works within Zone-I (Part-A) of Dendua distribution zone under RCFA Division-I PHE Dte.
Supply of 20 mm diameter PE 100 HDPE pipe along with Pre-installed rope of length 500 mtr along with all accessories. Make: Triveni or Similar.
Laying of 33KV 3CX400 sqmm XLPE UG Cable at Anandapur 33KV SS side along with supply and laying of HDPE Pipe PE80 PN6 200mm dia through Micro Tunnelling by HDD method for drawal of 33KV line between Keshpur and Anandapur SS under Midnapore Division
REPLACEMENT OF 150 MM DIA PVC PIPE BY LAYING OF 150 MM DIA DI PIPE LINE AT TALBAGAN CLUB TOJHUMA S HOUSE IN WD NO 114 BR XI
REPAIR / MAINT OF OLD CI/GI DISTRIBUTION PIPE LINE WITH PPR / DI / GI PIPE LINE AND ALLIED WORKS OF MD / OTM ACCN AT U AREA UNDER GE SUKNA
Supply and installation of LED street light and LED post top fittings with steel tubular and GI pipe mini pole at Rajendra Prasad Bhawan under ward no. 07.
Providing and laying 100 mm dia GI pipe line from reservoir to settling tank to old reservoir at Bhootbunglow pump house at Bejdih Colliery of BMP Group, SDPA
REPAIR REPLACEMENT OF INTERNAL CONCEALED GI PIPE LINE, INTERNAL SEWAGE PIPE LINE, REPAIR CLEANING WORKS AND MISC. WORKS IN JALAPAHAR, KATAPAHAR AND KURSEONG AREA UNDER AGE I DARJEELING
Replacement of under ground GI Pipe Non returning valve and gate valve of 10 HP submersible water pump installed at 157 BN HQ Campus under SHQ BSF Gopalpur
Construction of side shouldering to widening of road along with pond side GI pipe railing near Bhagirathi Club in Udaynagar Colony in ward no-03 under Dainhat Municipality
REPAIR REPLACEMENT OF INTERNAL CONCEALED GI PIPE LINE INTERNAL SEWAGE PIPE LINE REPAIR CLEANING WORKS AND MISC. WORKS IN JALAPAHAR KATAPAHAR AND KURSEONG AREA UNDER AGE I DARJEELING
Installation of 1 No Clustered (5) LDTW (Solar) (Depth 100m) with PVC Pipe at Simaith , Baidyanathpur (J.L. No. -132,131) within Suri (A-I) Sub- Division in Bolpur-Sriniketan Block, Plot No -250, 317, 789, 464, 466
Construction of Reservoir tank at Sherpa Gaon with supply of pipe line Health centre
DEVELOPMENT OF 100 MM DIA DI PIPE BY REPLACING 100 MM DIA EXISTING WORN OUT PVC AND CI PIPE FROM R.75 TO 61.3 KAMDAHARI PURBA PARA R BLOCK IN WARD NO 111.
SUPPLY AND LAYING OF 150 MM DIA DI PIPE BY REPLACING OLD DAMAGED WORN OUT 150 MM DIA CI PIPE FROM BALANK SANGHA CLUB TO H/O NEMAI BANERJEE IN WARD NO 111
REPLACING OF DAMMAGE 150 MM AND 100 MM DIA CI PIPE BY PROVIDING 150 AND 100 MM DIA DI PIPE AT SARADA MANI PARK 1ST AUTO STAND IN WD NO 112 BR XI
Drilling and Development of LDTW (Elec.) of size 150.MM x 100 MM NB. (PVC Pipes) 100M depth with Energisation at Jay Loknath Krishi Gosthi, ,Katodanga-II GP. under Haringhata Development Block
CONSTRUCTION OF CROSS DRAINAGE FOR GRAY WATER PASSING NEAR SAMSHAN AND UPVC PIPE FOR CARRING GRAY WATER FROM INSPECTION PIT TO COMMUNITY LEACH PIT UNDER MIR SAHAPUR SANSAD 24-25 TIED SANITATION 15TH FC THEME 5 - CLEAN AND GREEN VILLAGE
731725655, 731725657, 738725610, 738725655, 738725657, 753836655, 753836657, 775546019, 775844482, 775844710, 775844712
LAYING OF 11KV 3CX95 SQMM XLPE CABLE AND SUPPLY AND LAYING OF HDPE PIPE 110 MM DIA THROUGH JACK PUSH METHOD FOR EFECTING LT BULK CONNECTION I R O SHARANYA FIRM HOUSE UNDER MIDNAPORE DIVISION
Day to Day Operation and Maintenance of providing safe Drinking Water uninterruptedly to consumer Premises by making Distribution System in functioning within Zone II of Newly laid DI Pipes lines, Raw Water and Clear Water pipe lines
Day to Day Operation and Maintenance of providing safe Drinking Water uninterruptedly to consumer Premises by making Distribution System in functioning within Zone III of Newly laid DI Pipes lines, Raw Water and Clear Water pipe lines
Day to Day Operation and Maintenance of providing safe Drinking Water uninterruptedly to consumer Premises by making Distribution System in functioning within Zone IV of Newly laid DI Pipes lines, Raw Water and Clear Water pipe lines
Installation of 1 No Clustered (05) LDTW (Solar) (Depth 120m) with PVC Pipe at Fuljhuri (J.L. No.- 15) within Burdwan (A-I) Sub- Division in Bidbihar G.P.,Kanksa Block, Plot No -10, 308, 50,98, 57 ( LAT-23.637070N, LONG- 87.393622E)
Installation of 1 No Clustered (07) LDTW (Solar) (Depth 120m) with PVC Pipe at Nutangram (J.L. No.- 78) within Burdwan (A-I) Sub- Division in Amlajora G.P.,Kanksa Block, Plot No -213, 299, 667,62,271,01 , 819 ( LAT-23.455483N, LONG- 87.396775E)