Loading…
Loading…
4,592 results • Best match
Establishment of closure by using Fencing, Plantation, Patch Sowing, in Comptt. No. 8bU of Block Guddar Sangial Range Udhampur under CAMPA NPV FY 2025-26
Plantation work in Compt. 64/U and 65/U (Strip) (Jakheni NH) of Udhampur Forest Range Udhampur Forest Division under CAMPA NPV FY 2023-24
Establishment of closure with fencing and plantation in Co. 66/Th Makol Galla of Thakrakote Range in Reasi Forest Division Under CAMPA NPV 2023-24
Fencing ,Plantation and Lantana Eradication in Co.3/K Barwal of Kathua Forest Ranfe, Kathua Forest Division under CAMPA (CA) for the Year 2024-25
Establishment of closure with fencing and plantation in Co. 5/ TH Narloo Bridge of Thakrakote Range in Reasi Forest Division Under CAMPA NPV 2023-24
Fencing and Plantation works in Co.16/J Gaalak of Jasrota Forest Range under CAMPA (CA) for the Year 2024-25 of Kathua Forest Division
Plantation of PB and NR plants, Beating up of causalities in Siraj Range of Doda Forest Division under CAMPA NPV for the year 2024-25
Plantation work (BUC) in pits of Naked Root (B.L. sppl) under CAMPA at Co.114/A-Kadoora Dist. Bandipora CAMPA Unit 2022-23(old closure)
Providing and Fixing/ formation of barbed wire Closure for protection of plantation unit at Geerpathri area of Hajin beat, Khangund Block (Closure 2) 5135 rft
Establishment of closure with fencing and plantation in Co.09/j/K Bhombyal of Katra Range in Reasi Forest Division Under UT Capex 2023-24
Plantation work (BUC) in pits of Naked Root (B.L. sppl) under CAMPA at Co.114/A-Sumlar Dist. Bandipora CAMPA Unit 2022-23(old closure)
Establishment of Closure/Unit Fencing 400 rft., Plantation 100 nos. and Grass Slips 100 in comptt. 28/P (Panjar) of Panchari Range under CAMPA (CA).
Providing and Fixing of barbed wire fencing with angle iron posts in cement concrete blocks, and Plantation Work in Comptt. No 38N Waltengoo Qazigund Range.
Providing and fixing/formation of barbed wire fencing on angle iron posts around plantation unit 6 strands at Kharhajan and Bhatten Bajnari Khrew/Khonmoh CR.
Plantation of PB and NR plants, Beating up of causalities in Thakrai Range of Doda Forest Division under CAMPA NPV for the year 2024-25
Establishment of closure/unit by using Fencing, DRSM, Plantation in Comptt. No. 16/P of Block Lander Range Panchari under CAMPA NPV FY 2025-26
Plantation and BUC works in Co. 1/Tunnel (Sukhter) and BUC Planting work in Co. 18/Udh (Mand) under CAMPA for the year 2023-24
Providing and Fixing of Angle Iron Fence Posts with Black Annealed Barbed Wire Fencing and Plantation Works at Strip Gulabbagh of Social Forestry Range Qazigund
Plantation of 11760 Nos. Of Poly Bagged Plants in already Fence Unit in Co.07/R Doongi of Rajouri Range under CAMPA (NPV) 2026-27
Repair and Renovation of Old Plantation Closure 48M Ramhal by providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks.
Please refer BOQ
please refer BOQ
Supply, Bed formation and Transplanting of Broad leaved healthy prickings Plants standard quality(not less than 2 feet with good collar diameter) including all mechanical carriage and loading /unloading at Zerin Nursery Tangmarg (Complete Job)
Trial PB raising with maintenance of 9 x 6 PBs at Kassal Nursery of North Research Range Jammu-Udhampur under CAMPA scheme Work ID- W/R/RRJ/25-26/02453 for the year 2025-26
Supply, Bed formation and Transplanting of Broad-leaved healthy pickings Plants standard quality (not less than 2 feet with good collar diameter) including all mechanical carriage and loading /unloading at Zerin Nursery Tangmarg (complete job).
Providing and Fixing of Barbed Wire Fencing with Angle Iron Posts in Cement concrete block and six strand and crisscross at new Nursery Arahama Shopian, Forest Division Shopian under the Scheme CAMPA, Year 2023-24.
Construction of Fencing (1000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at Siya Nursery , Under CAMPA (NPV) Social Forestry Division, Rajouri 2024-25.
boq
BOQ
Refer to BOQ
conifers and broad leaved trees at Kangan II Ganderbal Range
boq
boq
boq
boq
boq
Creation of Green Zones by way of mass plantation/ landscaping in the open spaces on the right side 90 feet road from Soura to Pandach Chowk
Creating Green zones by way of mass plantation/ Landscaping along the Western Highways Adjoining areas under National Clean Air Program (NCAP). (Opposite newly constructed Pediatric Hospital).
Creating Green zones by way of mass plantation/ Landscaping along the Western Highways Adjoining areas under National Clean Air Program (NCAP).(LHS of Bemina , shamlal pump)
Fencing with G.I Barbed wire using PCC Sq post ,Plantation of fruit plants,Grass Slips, Patch sowing/Hardwood cutting etc at Co.11/KTH Thein CR.
Plantation of 9390 Nos. Of Poly Bagged Plants in already Fence Unit in Co.52/R Panjal Dana of Rajouri Range under CAMPA (NPV) 2026-27
BUC plantation in compartments 45/Gul, 47c/Gul, 61/Gul, 64d Gul in Gulmarg Range, and 65c/Gul in SPSP Beerwah Range, Forest Division Tangmarg (CA)
Recreational facilities at Makote Park Construction of RCC pedestrian culvert, repair of track path and development of land near river side including plantation work 2nd Call
Fencing, Plantation and Lantana Eradication in Co.26c/J Mastgarh of Jasrota Forest Range under CAMPA (CA) for the year 2024-25 of Kathua Forest Division
BUC Plantation of 12610 nos. of Poly Bagged Plants in Pits in different locations of Udhampur and Soil Conservation Forest Range under CAMPA FY 2024-25
Providing and Fixing of barbed wire fencing with angle iron posts in cement concrete blocks, Plantation and SMC Work in Comptt. No 108K Brah Kuthar Range.
BUC Plantation of 15729 nos. of Poly Bagged Plants in Pits in different locations of Dudu Forest Range Udhampur Forest Division under CAMPA FY 2024-25
Fencing and Plantation Cum Pit Works at Kot Bhalwal JMC Dumping Site under NCAP, Urban Forestry Division Jammu for the Year 202627 Creation of Urban Forests
Establishment of closure by way of BA barbed wire fencing and Plantation works in Co. 29/Kalidhar under UT CAPEX budget for the year 2024-25