Loading…
Loading…
4,592 results • Best match
BUC plantation for the year 2020-21 2021-22 and 2022-23 in Thakrai Range of Doda Forest Diviison under CAMPA for the year 2023-24
Fencing using PCC Fence post and Naked Root plantation work in Kuntwara Range of Doda Forest Division under CAMPA Exigency Plan for the year 2023-24.
Establishment of closure/unit by using Fencing, Crate, DRSM, Plantation in Comptt. No. 34/P of Block Panjar Range Panchari under CAMPA NPV FY 2025-26
Establishment of closure by using Fencing, Plantation, Patch Sowing, in Comptt. No. 8 bU of Block Guddar Sangial Range Udhampur under CAMPA NPV FY 2025-26
Providing and fixing of angle iron post with barbed wire fencing 4500 rfts and plantation of planting material at Khiram Cherisangad of Social Forestry Range Anantnag
Fencing with G.I Barbed wire using PCC Sq post ,Plantation of fruit plants, Grass slips, Patch sowing/Hardwood cutting etc at Co.11/KTH Thein CR.
Providing and Fixing of barbed wire fencing with angle iron posts in cement concrete blocks, Plantation and SMC Work in Comptt. No 37N Noorabad Qazigund Range
Plantation work (BUC) in pits of Naked Root (B.L. sppl) under CAMPA at Co.38/k- khenusa-Rajpora Dist. Bandipora CAMPA Unit 2022-23 (Old closure)
Plantation 2500 nos and Patch Sowing 1000 nos work in Comptt. 96/D of Dudu Forest Range Udhampur Forest Division under CAMPA NPV FY 2024-25
Establishment of closure/unit by using Fencing, Plantation, Patch Sowing work in Comptt. No. 59a/D Dudu Block Range Dudu under CAMPA NPV FY 2026-27
BUC Plantation of 12815 nos. of Poly Bagged Plants in Pits in different locations of Udhampur and Soil Conservation Forest Range under CAMPA FY 2026-27
BOQ
Steel Box, Rope Light, Tree Guard, Referigrator Small, Washing Machine 8 Kg, Wooden Book Case, Wooden Corner, Oddy Paper Shreder Mchine 12 sheet, Carpet 9x12, Zebra Blinds 7x7 ft, Towel With Unit Crest
Establishment of Closure usingFencing, Plantation, Patch Sowing and DRSM work in Comptt. 34/U of Block Bali Tirshi Range Udhampur under CAMPA Addl. CA FY 2024-25
refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
-Clearance of site by way of removing vegetations, plant roots , bushes etc , Bed formation , preparation of soil ,
please refer BOQ
Fencing using Sq. PCC fence post with four strand black annealed barbed wire, Pit Plantation in Co. 22/K Chowki Choura at Kalidhar Range, Jammu Forest Division
Plantation of fruits and fodder plants(BUC), grass slips, Patch sowing, DRSM work and Removal/eradication of lantana/obnoxious weed in different locations in Nandini Wildlife Sanctuary
Face lifting of park in sector no.1 (Mathura Park) in Roop Nagar Housing Colony Jammu by way of painting, bush cutting, removal of mulba and plantation
Providing and fixing of angle iron post with barbed wire fencing 4500 rfts and plantation of planting material at Co. 17LDR Shumhall of Social Forestry Range Anantnag
Plantation,BUC and DRSM works in Co.36/Kdr (Dhana Jalada) and Co.37/Kdr (Dhana Amboshani) of Kalidhar Range under CAMPA for the year 2023-24
Plantation of 2676 No s NR fruit plants BUC in Co 47BNL JTCCR of Wildlife Range Ramban Chenab Division Kishtwar for the year 2024 25 Under CAMPA
Constt. of new playfield at pS plal and Plantation and fencing in the land of hans raj and in the land of suram Singh and buta Singh
Plantation of 7500 nos. of Poly Bagged Plants in Pits, Patch Sowing 6000 nos. of patches in Comptt. 43/U Hartayan in Udhampur Range under CAMPA-NPV
Plantation of 11000 nos. of Poly Bagged Plants in Pits, Patch Sowing 4000 nos. of patches in Comptt. 96/D Kud in Dudu Range under CAMPA-NPV
Establishment of closure with fencing and plantation in 49a r and 50 R Ladda A of Reasi Range in Reasi Forest Division Under CAMPA NPV 2023-24
Establishment of closure by using Fencing, Plantation, Patch Sowing work in Comptt. No. 3cD-I, II of Block Bandhole Range Dudu under CAMPA CA FY 2025-26
Providing and Fixing of barbed wire fencing with angle iron posts in cement concrete blocks, Plantation and SMC Work in Comptt. No 38N Waltengoo Green Qazigund Range.
Plantation of 6500 nos. of Poly Bagged Plants in Pits, Patch Sowing 4000 nos. of patches in Comptt. 97a/D Margana in Dudu Range under CAMPA-NPV
Plantation of 2000 nos. of Poly Bagged Plants in Pits, Patch Sowing 1500 nos. of patches in Comptt. 79b/U Pakhlai in Udhampur Range under CAMPA-NPV
Development Beautification of major city roads by way of Plantation of Central Verges Medians of Major city Roads and Paving of Earthen Shoulders Eastern Western Foreshore Road
Providing and fixing of angle iron post with barbed wire fencing 3376 rfts and plantation of planting material at Co. 28N Malwan of Social Forestry Range Qazigund
Maintenance of Old Closure N02 Nandimarg (25 Hac) established in the year 2015-16 by way of fencing and plantation under Scheme CAMPA NPV year 2025-26.
Maintenance of Old Closure N02 Nandimarg (20 Hac) established in the year 2013-14 by way of fencing and plantation under Scheme CAMPA NPV year 2025-26
Maintenance, Repair and Renovation of Nursery Infrastructure at herbal Garden Daksum Range and Planting of MFP Slips in patches 70000 No. at various locations of Daksum Forest Range for development of Medicinal Plant Conservation Area (MPCA) Anantnag
Upgradation of Farm Nursery production area path approach road, irrigation channel, culvert pulley etc. at Main Campus, Chatha under HADP Project No. 14 entitled Cluster based Floriculture entrepreneurship for employment generation in UT of J and K
Plantation Work
As per the specifications of NIT and BoQ.