Loading…
Loading…
7,157 results • Best match
Supply and Fixing of CC kerbing of foot path portions & filling with red earth for plantation in various wards of Malkajgiri Circle-28, Secunderabad Zone, GHMC. Invited under earmarked works - ST Community are only eligible to participate.
Clearance of miscellaneous growth, uprootal of stumps and tilling in the proposed plantation area of 25 Ha at Gdk.11 Incline, RG.I area during 2024 by deploying Poclain of more than or equal to 200 HP capacity
RAISING OF BLOCK PLANTATION 2HA (L1 METHOD) IN INSTITUTIONS etc., (TREE SPECIES ONLY (Raising + 1st year maintenance + 2nd year Maintenance = 33 Months) Unit Cost: 2HA in Circle-27, Alwal, Kukatpally Zone, GHMC during the year 2023-24
Felling of Eucalyptus clonal plantation and Disposal of Pulpwood from the felled trees at 8 incline colony 1000 quarters for establishment of R&R site for shifting of Gaddiganipalli village pertaining to KTK-OCP-II Project -Reg
Felling of Eucalyptus trees and conversion of Props and Timber and Transportation of Eucalyptus Props and chock timber from various Eucalyptus plantation sites located at Rudrampur (near Professor Jayashankar Ground )of Kothagudem area for the year 2023.
RAISING OF BLOCK PLANTATION 2HA (L1 METHOD) IN INSTITUTIONS etc., (TREE SPECIES ONLY (Raising + 1st year maintenance + 2nd year Maintenance = 33 Months) Unit Cost: 2HA in Circle-24, Kukatpally, Kukatpally Zone, GHMC during the year 2023-24
Engaging of JCB & Dozer for clearing the site for Plantation under haritha Haram at Main Road i.e., NH-63, Kallur Road, Ailapur Road, Sangem Road, Yakeenpur Road, Madhapur Road and etc., under Green Budget/Pattana Pragathi funds
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, ... the plantation area ... in plantation areas ...
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation area ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, ... the plantation area ... in plantation areas ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, ... the plantation area ... in plantation areas ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted 200 LC with 0.90 cubic meters and above capacity bucket, collection and ... the plantation area ... in plantation areas ...
Clear Felling and Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation area ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation area ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. 200LC excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clear felling & Chipping and Heaping in the entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. 200 LC excavators fitted with 0.90 cubic meters and above capacity bucket, collection and ... the plantation area ... in plantation areas ...
Clear Felling & Chipping and Heaping in entire area, Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of ... the plantation area ... in plantation area ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal ... the plantation area ... in plantation areas ...
Clearance of Jungle growth, chipping and heaping and then Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., 200LC and above excavators fitted with 0.90 cubic meters and above capacity bucket, ... the plantation area ... in plantation areas ...
Supply, Delivery and erection of Submersible pump set repairs and maintenance Materials works at Vishnupuri Colony Park, Sai Enclave Colony Park, RK Nagar Colony Park, Geetha Nagar Colony Park, Maruthi nagar Nursery, Godavari Colony Park and Swarnandra Colony Parks of Circle-28, Malkajgiri, SCZ, GHMC during the year 2021-22
Laying of CC Road from M.Kannaiah H.No. 3-19 to Linga Reddy H.No. 2-36, Venkatapuram Krishna H.No. 4-34 to Nursery (Pochamma Temple Opp), G.Sathaiah H.No. 4-59 to Narsimha H.No. 4-72, K Raju house to Gunti Sagar house & in ward No. 16 at Shamshabad Municipality. Under HMDA Funds.
Laying of 63 mm dia HDPE line providing water supply to nursery at Annojiguda and s Supply and fixing of 80by100 mm dia water supply sluice bolts and attendending and rectification of leakage on 3 or 4 or 6 inch dia at various places in Pocharam Municipality under MGF 2019-20
MLAP Double Rows Flowering Shrub & Flowering Trees plantation for 6 Kilometer (i.e 1)Janagam road to Pedamma Temple 2) Kuda Kuda road 3) Khammam road 4)Durajpally road 5) Kasarabad Road ) in Suryapet Municipality under TKHH - 2021-22.
Estimate for Gap Filling plantation in existing Colony parks, Tree parks and other open spaces in Circle-VI,VII,VIII,IX,X & XI Charminar Zone, UBD, GHMC for the Year 2022-23(Reserved for Scs)(On Contract Profit)
Procurement of 2.50 lakhs 5 1/2"X6 1/2" bag size plants for taking up plantation at Green curtains, Flyovers and Central medians during "Telangana Ku Haritha Haram" 2020-21 (bit-II) in Circle-20, SLPZ, GHMC
Maintenance of plantation and lawn at canteen building-1 including sorroundingareas of office sheds at (5x800MW) Yadadri Thermal Power Station, Veerlapalem(V) Dameracherla(M), Nalgonda Dist for a period from 01.04.2024 or actual date of utilization to 31.03.2025
Pitting, Planting, Watering, Watcher one watcher and Maintenance for Median Plantation upto March 2022 for plants at Srisailam Highway roads under Haritha Haram Programs 2021-2022 in Jalpally Municipality Under Pattana Prgathi 14th Finance Commission Grants (Green Budget)
PLANTATION ALONG THE MAIN ROAD ALONG VEERANNAPET TO DOUBLE BED ROOM ROAD, T.D.GUTTA TEMPLE TO THIRMAL KUTCHA THANDA, RAICHUR ROAD CASUALITIES, BANDAMEEDIPALLY, PPV CASUALITIES, MUNICIPAL PARKS/AMRUTH PARKS, TOWN INTERNAL ROADS FOR THE YEAR 2024 IN MAHABUBNAGAR MUNICIPALITY
Engage of Labour for Maintenance of Median plantation, Yadardri park & Bruhath Pattana prakruthi vanamu in Zaheerabad Municipality, from month of Nov-2021 to Feb-2022(4 Months) (Rate as per SSR 2021-22). Under Green Budget 2021-22.
Procurement of 1 Lakhs no's of (8 x 10) bag size Tall plants for TKHH Plantation 2020-21(Forest / Native Spieces only) in Cirlce-26, Gajularamaram Forest Block, Kukatpally Zone, GHMC during the year 2020-21(2nd recall)
Pitting, Planting, Watering, Watcher one watcher and Maintenance for Median Plantation upto March 2022 for plants at Srisailam Highway roads under Haritha Haram Programs 2021-2022 in Jalpally Municipality Under Pattana Prgathi 14th Finance Commission Grants (Green Budget)
Felling of eucalyptus trees and extraction of prop and timber and transportation from 1999,2003 & 2004 plantation site in 3 incline, bungalows area, womens hostel, CRP camp ramavaram along railway OHT line in kothagudem area of SCCL during 2019
RAISING OF BLOCK PLANTATION 2HA (L1 METHOD) IN In 2BHK Thumkunta (Trees and Shrubs )(Raising + 1st year maintenance + 2nd year Maintenance = 33 Months) Unit Cost: 2HA in Circle-25, Quthbullapur, Kukatpally Zone, GHMC during the year 2023-24
Felling of eucalyptus trees and extraction of disposal of pulwood from 1999,2003,2004 eucalyptus plantation site located in 3 incline, bungalows area, womens hostel CRP camp ramavaram and along railway OHT line at Kothagudem area of SCCL during 2019
RAISING OF BLOCK PLANTATION 2HA (L1 METHOD) IN GHMC OPENSPACE etc., (TREE SPECIES ONLY (Raising + 1st year maintenance + 2nd year Maintenance = 33 Months) Unit Cost: 2HA in Circle-27, Alwal, Kukatpally Zone, GHMC during the year 2023-24
Digging of Periphery Trench around the periphery of 2007 EP Govindapur, 2008 EP Govindapur-I & 2008 EP Govindapur-II plantation with a size of Lx1.25M ((1.5M Top & 1.0M Bottom)x 1.0M Depth) of Paloncha Division Package no.2
Engage of Labour for Maintenance of Median plantation, Yadardri park and Bruhath Pattana prakruthi vanamu from 8th January 2025 to 07th January 2026 (Rate as per SSR 2024-25). Under Green Budget 2024-25 in Zaheerabad Municipality(2nd call)
Plantation in Central Dividers from Ambedkar Jn to towards Angadi Jn towards Mallapally Road towards pakhal road jn and from Pakal jn towards pakal road towards Sarvapuram jn and from Sarvapuram jn to towards mahabuabbad road in Narsampet Municipality
Engaging of 15 No's of Private Water Tankers with Trolly including Driver batha and Diesel to Haritha Haram plantation trees through Tanker with tractor in various localities of Siddipet town under Pattana Pragathi funds for the year 2022-23
"Providing plantation,Korean grass in front of Circle Office building,Security room,Retaining wall at Circle Office Building Khammam in Khammam District" (Tender invited under earmarked works-SCs,Societies & individuals belonging to SC communities are only eligible to participate)
Providing water supply to Median plantation from Welcome Arch to Gayatri Garden, Vivekananda Chowk to SBI Bank Shivaji chowk, Gandhi Chowk to Punjab Chowk, NTR Chowk to Vinayak Chowk in Adilabad Municipality., Est. Cost Rs.40.00 Lakhs, MGB Grant
Raising and 1st year maintenance of OB plantation in an area of about 7.20 Ha at North external dumpyard (North of GP vagu Part of 3rd deck and 4th deck slopes) of PKOC Manuguru area during 2023 to 25
Raising and 1st year maintenance of OB plantation in an area of about 11 Ha at MNGOCP (External Dumps south east deck 2 -7 Ha and south east 3rd deck 4 Ha) in Manuguru area during 2023 to 25
Clearance of unwanted growth, uprootal of stumps and tillage entire plantation area (9Ha) B). CCPT and SCT(4400 Cum) at RG OCP-II (9.0Ha) (Ladnapur Ac 302 area- 5Ha and Bokkalavagu Aqueduct area- 4 Ha) in RG-III area