Loading…
Loading…
7,157 results • Best match
Development & maintenance of Shrubbery Plantation beside Walking Track on both side (left side-1Km & Right Side-1Km = Total 2Km) from Mahindra Showroom to Old age home(Nizampet Link Road) in circle-24, Kukatpally, Kukatpally Zone, GHMC during the year 2021-22. (Reserved for WLCCS Societies)
Estimate for Engaging Mandays,DCM,Water Tanker and stakes for Massice Plantation Programme (One Day One Crore, Planting Programme) (On 26-8-2023) in ward no:1,2,3,4,5 &6 in Circle-1, Kapra, LB.Nagar Zone, GHMCfor the year2023-24[For planting of 10000 No's Tall Plants]
Raising and 1st year maintenance of OB plantation in an area of about 4 Ha at MNGOCP (West side of 1st and 2nd deck external dumpyard -2 Ha and east side of central dumpyard 1st deck 2 Ha) in Manuguru area during 2023 to 25
Engaging of 12 No's of Private Water Tankers with Trolly including Driver batha and Diesel to Haritha Haram plantation trees through Tanker with tractor from April, 2024 to September, 2024 in various localities of siddipet town Under Pattana Pragathi funds for the year 2024-25.
Engaging of 16 No's of Private Water Tankers with Trolly including Driver batha and Diesel to Haritha Haram plantation trees through Tanker with tractor from April 2021 to July 2021 in various localities of siddipet town under Pattana Pragathi funds for the year 2020-21.
Engage of 16 nos private water tankers with tolley including driver batha and diesel to Harithaharam plantation trees through tanker with tractor from august 2021 to November 2021 in various localities of Siddipet town under Pattana prathi funds for the year 20-21-22
Maintenance of MLAP-1 ( Moula Ali flyover, near Moula ali Grave yard and Patel Enclave Plantations) at Ward 180, Malkajgiri Zone , MMC for(12) months during the year 2026-27- 1st Recall
Clearance and Uprootal of miscellaneous growth and tillage in entire area and digging of CCPT around the site & SCT'S across the slope areas in the proposed 2019 year plantation site at KLP mine premises - Spread over in 60 Ha -of BHP area during 2019-2020 financial year
Hiring of JCB for removing of bushes and leveling the surface and making pits for plantation area from Welcome arch to Baba Garden via bypass road, Ekachakra nagar X-road to Naganpally vagu and Ambedkar colony to Srinivas camp in Bodhan town Under pattana pragathi grants
Conversion of bag plants from Micro bags into 6 x8 bag size (63620 Nos) (Ornamental plantation other than Bougainvillias) AND Raising of 4 x7 (10,000 Nos) (Home stead) Bag size plants in Cir.no 5, Saroornagar in LB.Nagar zone, GHMC for the year 2024-25 -3rd Recall
Raising and 1st year maintenance of Miscellaneous Block plantation at vacant patches (Spotter Junction, CHP, VPR Camp, Coal Yard, PO Office, Site Office, Borehole Pump, Base Workshop, View Point to Borehole Pump house) in the premises of MNGOC Project, Manuguru area during the year 2021-23.
Development and Maintenance of Median Plantation (at MIDHANI) with tall Plants@3mtrs espacement and with [email protected] espacement in (2) Rows in Circle-8 at Ward No.41, Charminar Zone, UBD, GHMC for the year 2024-25 for 12 months.(Unit 1430RMT, 476 Tall Plants& Shrubbery Plants)
Maintenance of Shrubbery Plantation beside Walking Track on both side (left side-1Km & Right Side-1Km = Total 2Km) from Mahindra Showroom to Old age home (Nizampet Link Road) in circle-24, Kukatpally, Kukatpally Zone, GHMC for a period of 12 months during the year 2023-24
construction of Telangana Kreeda Pranganam Arch ,Plantation & Fencing at Housing Board near Hn o 5-5-61/57, Housing Board opp. Teacher House, NGO's Colony opp. Nagi Reddy House, Venkatadri Nagar Colony near Swamy das House & other places in Zaheerabad Municipality under Pattana Pragathi Grants 2022-23.
Engaging of 4 No's of Private Water Tankers with Trolly including Driver batha and Diesel to Haritha Haram plantation trees through Tanker with tractor from Jan 2021 to March 2021 in various localities of siddipet town under General funds/CSR Funds for the year 2020-21.
Providing of Harithaharam i.e., Institutional Plantation at Various Offices and Institutions at Old Bazar in Mahabubabad Municipality under Pattana Pragathi Grant. RESERVED FOR WADDERA / SAGGARA COMMUNITIES INDIVIDUALS / SOCIETIES ONLY. CASTE CERTIFICATE SHOULD BE ENCLOSED. IF NOT ENCLOSE OR OTHERS CAN BE PARTICIPATED THE TENDER WERE REJECTED
Felling of Eucalyptus clonal plantation and disposal of pulpwood from the farmers field at proposed KTK-OCP-III and at KTK OCP-II for launching of new project (OCP-III)and expansion of mining activity and preparation of coal stock yard at KTK OCP-II -BHPL area
Engage of Dozer, JCB and Supply of Red soils of RCC Rings for Plantation of Avenue plants from Housing Board Kaman to Ensanpally Road, Vemulawada Kaman to Yellamma temple and Kappalakunta to Islamina College road both sides in Siddipet town under Haritha Haram Programme under General Funds.
Maintenance of Shrubbery Plantation beside Walking Track on both side (left side-1Km & Right Side-1Km = Total 2Km) from Mahindra Showroom to Old age home (Nizampet Link Road) in circle-24, Kukatpally, Kukatpally Zone, GHMC for a period of 12 months during the year 2023-24.
Supply and Delivery of Plants & Tree, Manure(Gobar), Vermi-Compost, Red Soil & for Haritha Haram Plantation at 16th ward Surya Medical to Kistapur road and Mansoor house to Theater Galli via Shadi khana both road side Tall plants in Toopran Municipality under Pattana Pragathi Fund 2020-21.
Digging of Periphery Trench around the periphery of 2025 EP Satyampeta-I (Old 2001 EP), 2025 EP Satyampeta-II (Old 2005 EP) plantation and 2025 BP Gollagudem with a size of Lx1.25M ((1.5M Top and 1.0M Bottom)x 1.0M Depth) of Paloncha Division Package no.8
Engaging of 8 No's of Private Water Tankers with Trolly including Driver batha and Diesel to Haritha Haram plantation trees through Tanker with tractor from September 2018 to March 2019 in various localities of siddipet town under General funds/CSR Funds for the year 2018-19.
Construction Of Underground Drain From Oggu Nagabhushanam(h) to K Ashok(h) Construction of (0.45x0.45)m CC Drain from Banda Venkatesh(h) to Peraboina Bangari(h) Construction Of Underground Drain From Madhava chari(h) to Checkdam and Laying of CC Road ... to Nursery CC ...
Submersible Pumpset Repairs and Maintenance material and Laying & Jointing HDPE Pipe Line work at:- 39 Police Park,Road No.10 ISI Quarters Park, Anushaka Park, Commissioner House Back Side Park, Club House Park, KBR Park,Lotus Pond Park-I, Senior ... Vijaya Nursery Circle-18,Khairathabad ...
3rd year Maintenance of Avenue Strip plantations at GDK 2 Incline under bridge to new filter bed all along the diverted nallah and Railway siding adjacent to GDKCM RG I during 2026 27
Detailed Estimation towards Maintenance Repairs Supply Delivery and erection of Submersible Pump Set and HDPE Pipe Line repairs Work at Laxmi Puri Colony Park Maruthi Garden Nursery Shaily Garden Nursery Registration Colony Tree Park Circle-1 Yapral Malkajgiri Zone UBD MMC for the year 2026-27-1st Recall
Development and Maintenance of Median Plantation Babanagar Central Median with all plants @3mts espacemnet and with shrubbery @ 0.50m espacement in (5) Rows in Circle-8 at ward 42, Charminar Zone, UBD, GHMC for the year 2024-25 for 12 months (Unit 1100 RMT PLants-0, Shrubbery Plants 11000Nos)
Advance operations, Raising and first year maintenance of Block plantation at RG OCP-II (20.0Ha) (Ladnapur: 7 Ha +Bokkalavagu Aqueduct area: 4 Ha +North High wall Quarry top edge: 4Ha, NCC Camp Opposite: 3Ha and JNTUHCEM campus: 2.0 Ha) in RG-III area during 2021-22-23-Reg
Supply and Delivery of Plants & Tree, Manure(Gobar), Vermi-Compost, Red Soil & Engaging Labours for Haritha Haram Plantation on occassion of Honble CM KCR Birthday as GREEN INDIA CHALLANGE Near Pedda Cheruvu Katta, Abhyasa School Area & Narsapoor X-road in Toopran Municipality under Pattana Pragathi Fund 2020-21.
PLANTATION ALONG THE MAIN ROAD ALONG BHAGEERATHA ARCH TO HASANAPUR, BHAGEERTHA COLONY TO SHIVALAYAM TEMPLE, CHRISTAINPALLY TO MARLU ROAD, CHRISTAINPALLY INTERNAL ROADS, BHOOLAXMI ENCLAVE TO ADARSHA NAGAR DOUBLE BED ROOMS, BHOOTPUR ROAD CASUALITIES MUNICIPAL PARKS/ AMRUTH PARKS, TOWN INTERNAL ROADS FOR THE YEAR 2023-2024 IN MAHABUBNAGAR MUNICIPALITY
Development and maintenance of Median Plantation with Tall plants @ 3 mt espacement and with Shrubbery @ 0.50 espacement in (2) Rows at Chandrayangutta Flyover to Bandlaguda, Circle-VIII, Charminar Zone, UBD, GHMC for the year 2023-24 (Raising + 1st year maintenance +2nd year maintenance = 33 months) (Unit 3000 Rmt)
Supply and Plantation of Various varieties (Foxtail Palm, Royal pagoda, Gulmohar, Raavi,Tecoma, Spathodia Spe, Kentia Palm,Phonox, Termilija Green, Budhabelli Amboos, Neem,Black Ficus,Bogan Villa,Rain Tree) of plants to Grave Yard at Kosgi Municipality under 15 Th Kosgi Municipality under Pattana Pragathi Funds Est.Cost.16.50 Lakhs
Hiring of JCB for removing of bushes , leveling the surface and making pits for plantation area from Ambam gate to Welcome Arch to Railway gate to Pasupu vagu to Ladmavandi shivar and from Achanpally road to Pegadapally vagu and at other places in Bodhan town Under pattana pragathi grants
Raising and First year maintenance of Block plantation in an area of 4.0 Ha(Back side of work shop-2.0 Ha,west side of top soil dump yard-1.0 Ha and west side of CHP switch station-1.0 Ha) at MNGOC Project Manuguru area during the year 2023 25
Digging of Periphery Trench around the periphery of 2025 EP Mulakalapally-I (old 2002) 2025 EP Mulakalapally-II (old 2003 EP) and 2025 EP Mualakalapally-III (old 2004 EP), plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom)x 1.0M Depth) of Paloncha Division Package no.5
Procurement of Plants for Plantation in Peddapalli Municipality under 10 % Municipal Greenery Budget (Recall)
Construction of Storm Water Drain from Raghavendra hotel, Sanghiguda junction (Nursery) to ORR Service Road in W.No.118, Shamshabad of Shamshabad Circle18, GHMC.
clearance and uprootal of miscellaneous growth and tillage in entire area and digging of CCPT around the site $ SCT's across the slope areas in the proposed 2019 year plantation site in Forest lease area of KTK-1 incl (30.0Ha) and KTK-5 incl (10.0Ha) total 40.0Ha -Bhp area during 2019-2020.
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M ((1.5M Top & 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2024 EP Garimellapadu in package I of Kothagudem Division
Digging of Periphery Trench around the periphery of 2024 BP Guntimadugu plantation with a size of Lx1.25M ((1.5M Top & 1.0M Bottom)x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. XI of Sathupalli Division.
Digging of Periphery Trench around the periphery of 2025 EP Lankalapalli plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. XIV of Sathupalli Division.
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M ((1.5M Top & 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2024 BP Srirampur-I in package V of Kothagudem Division
Digging of Periphery Trench around the periphery of 2024 EP&BP Vedanthapur plantation with a size of Lx1.25M ((1.5M Top & 1.0M Bottom)x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. X of Sathupalli Division.
PLANTATION ALONG THE MAIN ROAD ALONG BOYAPALLY TO PILLALAMARI, BOYAPALLY GATE TO PATHYAPURAM MAISAMMA, THIMASANIPALLY TO PILLALAMARRI, YEDIRA X-ROAD TO DIVITIPALLY, PALKONDA GATE TO BY-PASS ROAD, BY-PASS ROAD, JADCHERLA ROAD CASUALITIES PPV CASUALITIES MUNICIPAL PARKS AMRUTH PARKS, TOWN INTERNAL ROADS FOR THE YEAR 2024 IN MUNICIPALITY. MUNICIPALITY
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M ((1.5M Top & 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2024 EP Chaparalapalli in package II of Kothagudem Division
Digging of Periphery Trench around the periphery of 2024 BP Gandugulapalli plantation with a size of Lx1.25M ((1.5M Top & 1.0M Bottom)x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. IX of Sathupalli Division.
Development and maintenance of Median Plantation with Tall plants @ 3 mt espacement and with Shrubbery @ 0.50 espacement in (2) Rows at durga nagar Chowrasta to Bandlaguda (Mylardevepally), Circle-XI, Charminar Zone, UBD, GHMC for the year 2023-24 (Raising + 1st year maintenance +2nd year maintenance = 33 months) (Unit 1500 Rmt)
Drilling of 6 1/2" dia Bore well, Supply, Delivery and erection of suitable submerisble pump set and laying of HDPE pipe line work at Open Space plantation ( Railway Open space near sanjeevaiah park) Under TKHH in circle-30 of Sec'bad Zone, GHMC during the year 2021-22 (1st recall)
Digging of Periphery Trench around the periphery of 2025 EP Katkur plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. XV of Sathupalli Division.
Digging of Periphery Trench around the periphery of 2007 EP Balarajugudem plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. XI of Sathupalli Division.