Loading…
Loading…
391 results • Best match
Daily collection of garbage from door to door from all floors and transporting the same to the SLRM centre including operating and maintenance of SLRM centre and removing of water hyacinth Jal Kumbhi from Pragati Nagar Pond near Dipka house
Manual cleaning of box culvert / hume pipe culvert from pragati nagar pond to Lilagarh river and providing and fixing of OB /Earth filled cement bags at various location of mine of Dipka Expansion Project at Dipka Area.(For monsoon 2026-27)
Facility Management Services - LumpSum Based - Industrial; Assistance in pump operation with minor maintenance in JK Pond UK Sadbhav main Sump and Brahmaputra main sump at Quarry of Gevra project for a period of 01 year; Consumables to be provided by..
Guarding of pontoons (10 nos.) with railing works, toe guard, fencing of pontoons installed at various sumps of quarry and pragati nagar pond with chain link wire mesh, walkway works on pontoons and painting of pipelines near sump area at DEP.
Custom Bid for Services - Ash filling of abandoned mine quarries upto 150 KM by filling of Pond ash from Dhanras Ash dyke or Fly Ash from Stage23 Silo of Korba STPP Similar Category Goods Transport Service – Per KM Based Service
Renovation Work of Dhobi Nala Pond, Ward No. 01
Construction of Raod and Drain near Mishra Talab to Avdhesh Pathak House Ward No. 42 Daihanpara.
Construction of RCC Nala at Ward No 06 Malappa Camp Near Gop House to Railway Talab
WN 17 DEVELOPMENT WORK OF TULSAGHAT POND LORMI(3RD CALL)
Construction of 06 seater Aspirational Toilet in front of Dev Talab at Ward no -12. (2nd Call)
Construction of RRC Drain Work at Ward 03 Mahamayapara Mainroad To Kunwarpar Talab Vhaya Pankaj Sharma House.
Ward no. 05 Sanskritik bhavan to Manka Dai to Akhra talab retaining wall at nagar panchayat Saragon
A) Diversion/erection of 3.3kV Overhead Line for UG pump from turra pond to mine substation at Kurasia Colliery. B) Extension of 3.3kV OHL from 6 no. feeder up to new 5 no. bore hole site over seam-V at Kurasia Colliery.
Job Contract for excavation, loading, transportation and unloading of Pond Ash excavated from V-1, V-2, V3-A, V3-B, V4-A and V4-B ash dykes ofVSTPS to low lying area located within 100 kms from ash dyke of NTPCVindhyachal.
Work of Pipeline in west zone (Department UK, department E and F, Forest Patch, JK Pond, Khusrudih, Old Dipka Sump) and LK zone sump on as and when required basis of quarry section at Gevra project for a period of 180 days.
As per SOW
Day-to-day shifting and installation of pumps at West Zone (Department UK, Department E and F, Forest patch, JK pond, East Dozer section, old Dipka) sump and LK zone sump (LK1 and LK2) on as and when required basis of Gevra Project for a period
S-CPG1-182 Supplying pond ash to the road project of NHAI for Rehabilitation and Up gradation of existing 2 lane to 4 lane standardsfrom Duburi to Chandikhol section of NH-200 (New NH-53) from Km 388.000to 427.400 in the state of Odisha
Providing laying and jointing of UPVC Pressure (6kg/cm2 & 10kg/cm2) pipe line under shifting of existing Distribution pipe line 6200m, affected on widing of Kopra to Pokhara Road under PWD Project at villages – Koundkera, Block – Fingeshwar, District – Gariyaband.
Rate Contract for Transporation of PondAsh from NTPC Kudgi
Day to day cleaning of main drain along outer side of north side of compound walls from new MD qtr. Via B1 type qtr. Up to low level area near Krishna Nagar village and main drain from pond near deepashwari Mandir to Saraswati Shishu Mandir School at
Custom Bid for Services - Loading Transportation Unloading of pond ash to the lowlying area in 3rd Batallion Chhattisgarh Armed Police Force office Amleswar DistDurg for development equestrian centre Distance from PPII ash dyke to the unloading site.. Similar Category Operation and Maintenance Power House/Power Plant
CONSTRUCTION OF RETAINING WALL & ROAD WIDENING WORK BEHIND KALYANI SHITLA MANDIR TALAB AT LAXMI NAGAR WARD NO -29, RISALI (C.G)
CONSTRUCTION OF 50 KLD CAPACITY HIGH LEVEL RESERVOIR (OVERHEAD TANK) 15 METER STAGING NEAR JALSAN TALAB WARD NO. 05 KURUD
BARE OILY WATER TRANSFER PUMP (Q3), BARE WASTE WATER GUARD POND PUMP (Q3)
As per SOW
Shielding Block of material IS: 2062 Gr. -B for Rehearsal Emergency storage Facility, Nozzle screen for 100 NB pipe EP of Emergency make up water pond, Nozzle screen for 150 NB pipe EP of Emergency make up water pond, Nozzle screen for 200 NB pipe EP ... water pond
Construction of RCC drain near Ganga Munda Pond in Rajendra Nagar Ward No. 21
S/R, Mow & Deposit Work of Residential/ Non Residential Building at Panchsheel Nagar Section (Katora Talab) Under Maintenance Sub-Division Raipur (C.G.)
As per SOW
Deployment of chain mounted Dozer for dozing of NTPC Korba supplied pondash in manikpur Open Cast Mine
Services
Services
Services
Services
Services
Services
Services
Services
Services
Services
Services
Providing laying and jointing of UPVC Pressure (6kg/cm2 & 10kg/cm2) pipe line under shifting of existing Distribution pipe line 6050m, Rising main 500m & 01 No. Switch Room affected on widing of Kopra to Pokhara Road under PWD Project at villages – Basin, Block – Fingeshwar, District – Gariyaband.
Desks and Bench/Chair set for Classroom/Training Area (Q2)
E - Tourist Vehicle/Golf Cart (Q2) (3 (3 ))
Custom Bid for Services - Transportation Unloading of Ash, Custom Bid for Services - Excavation Loading of Pond ash
Custom Bid for Services - Transportation of pond ash to Basanwahi Marangpuri section CG03 section NH 130 CD of Raipur Vishakhapatnam from NTPC Sipat Similar Category Goods Transport Service – Per MT per KM Based Service Goods Transport Service – Per KM Based Service Goods Transport Services - Per MT Handling and Transport on Lumpsum Basis Handling, Transport and Other Mining Services - Percentage quote based
As per SOW
Day to day maintenance of Staff Quarters at BSNL Colony Katora Talab, Staff quarters Compound Fafadih and administrative building compound at Khamardih Raipur for period of Six months.
Geotechnical Investigation of Earthen Dam and tailings inside tailings pond during condition assessment including CPTu testing and slope stability analysis