Loading…
Loading…
1,782 results • Best match
CONSTRUCTION OR PCC ROAD AT WARD NO 05 HOUSE OF KAUSHAL JAYASHWAL TO POND OF ROHANI SHUKLA
Beautification of Chirha Pond Paver Block, Fencing Gate Work as per estimate at ward n. 09 burhar
BEAUTIFICATION WORK OF POND OPPOSITE TO JANPAD PANCHAYAT AT WARD NO 02 UNDER NAGAR PARISHAD MAKHAN NAGAR.
Supplying, commissioning, installation and testing of fountain in pond of Golden Jublee Park at Block B Project
REJUVENATION WORK OF BABAN POND KATANGI UNDER AMRUT 2.0 SCHEME- Construction of pitching, Pathway, Plantation AND Ghat
2ND CALL REJUVENATION OF WATER BODY AT Hanuman Mandir Pond-Ward 9, Udaipura UNDER AMRUT 2.0 SCHEME
Filling of Pond Ash in Depressions in BTG and BOP Area under Stage-II of SSTPP, Dongalia.
Drain construction work on both sides from Ward No. 30 Labravada-Aahu Phata to the pond culvert
Providing and Fixing water sprinkling system for dust mitigation from sical pond to weighbridge at Amlohri Project.
2ND call Deepening and beautification work of Pond At Ward No 05 Nagar Parishad Deori Dist Raisen
Providing and fixing water sprinkling system for dust mitigation from sical pond to weighbridge at Amlohri Project.
Pre monsoon silt cleaning of different siltation pond / sumps in Coal and West section at Jayant Project
Establishing a binocular structure with hide out tent for watching birds at various places under the pond.
DRILLING OF TUBE WELL AND PROVIDING AND FIXING OF SUBMERSIBLE PUMP 150MM DIA AT POND DIST SIDHI
Establishing a binocular structure with hide out tent for watching birds at various places under the pond.
Tender for Construction of approach road for lifting of Fly Ash from Pond-II at MPPGCL Birsinghpur
Construction of Ghat in pond at Mediyaras village under Dhanpuri OCM of Sohagpur Area under CSR Scheme.
Renovation work of community hall near Aadhartal pond under Diwan Aadhar Singh ward in zone no. 07.
Construction of fencing around the pond under Gokalpur ward. Under zone 10 ranjhi (CM Monit A plus)
CONSTRUCTION OF RCC DRAIN AT WARD NO 12 HERO - HONDA SHOW ROOM TO HANUMAN SAGAR POND JAISINGHNAGAR
Ghat Construction Work In Manegaon Pond Under Lala Lajpat Rai Wardv Undar Zone 10 Ranjhi (Prasad Mad)
Construction of drain from Shri Chandra Pandey house to the government pond in Ward No. 13, Pathra.
Development of Pond Under Jal Ganga Samverdhan Abhiyan at Ward No.44 Near Conveyar Vishwabharam Dwivedi House
Construction of water channel, pond and other civil work near Lord Shiv statue at Chipri distt. Tikamgarh.
Development of Ghat, approach road and construction of retaining wall for pond at Abhed Ashram, Banaouli, Singrauli.
Custom Bid for Services - M17855 Lime Charging In Individual Ball Mills and Reclaim Pond in Cyclic Shifts
Work Contract for Monitoring of ambient air quality ,stack emission ,Domestic water quality ,efflluent /waste water quality of STP ,Ash Ponds ,Boiler blowdown ,cooling tower blowdown ,ETP ,various water samples ,Noise Pollution at STPS,Sarni
Job Contract for transportation of approx 5.5 Lac M3 pond ash from AshDykes of NTPC Rihand to Road Project of NHAI at Varanasi
JC for excavation, loading, transportation and unloading of Pond Ashexcavated from ash dykes of VSTPS to low lying area (land or roadprojects) within the radius of 100 kms of NTPC Vindhyachal
Removing of weeds and refused material from facultative ponds No. 2,3,5,6,7 and 8, cleaning and uprooting of rank vegetation long grass brushes and surface dressing at Sahapura Oxidation Pond, Bhopal
Cleaning overflown or accummulated silt and or OB from Culverts, Drains, Sumps or Siltation Ponds, Road sides etc. in Main Haul Road, CHP and in Mine on as, when and wherever required basis at Amlohri Project.
CONSTRUCTION OF CEMENT CONCRETE ROAD AT WARD NO 20 AMRUT SAGAR TALAB MAIN ROAD TO GAVLI SHAMSHAN APPROCH ROAD RATLAM AS PER NIT AND ESTIMATE
Construction of Kirhai Mukundpur road At Km. 35/10 to Roop Sagar Talab Bye Pass Road Length 3.16 KM under Sub Division Amarpatan. 2nd Call
1. Construction Of Main Road to Mehra Talab Approach Road Balaghat Length 200.00 M 2. Rain Basera to Anganwadi CC Road Balaghat. Length- 320 M
CONSTRUCTION OF RCC DRAIN FROM SGS COLLAGE ROAD MADHURI MOD TO DIVYANG CHHATRAVAS NEAR MADHURI TALAB AT WARD NO. 07 UNDER NAGAR PALIKA PARISHAD SIDHI
DETAILED ESTIMATE FOR CONSTRUCTION OF PAVERS BLOCK PATHWAY, WAITING AREA SHED AND CHOWKIDAAR QUARTER NEAR MAHARAJ SAGAR TALAB MUKTIDHAM AT WARD NO 06 PANNA M.P
Construction Of M-40 Cement concrete Road, Drain and Footpath at Madan mahal chowk to near ganga sagar talab under zone no.04. 3rd Call
Supply fixings, Installation Trail And Maintainced 2 Years Of Musicial Fountains At Jal Sena Talab Rajnagar As Per Pic And Specifications Attached Distt Chhatarpur M.P.
02 yearsOperation and Maintenance of 500 KLD STP at Gullava Talab including Construction of boundary wall, Guard room and installation of required Elec-mech workcomplete
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO RAVIDAAS SAMUDAYAK BHAWAN AND PATHRIYA TALAB TO DOCTOR H.N SHARMA HOUSE AT WARD NO 04 PANNA MP
CONSTRUCTION OF Pipalarava Road to national Highway Bypasa Road SonKutch Road to Talab Colony ta Length 3.80 K.M WORK With electric Pole Shifiting Division Dewas
UNDER THE JAL GANGA SAMVARDHAN ABHIYAN CLEANING OPERATIONS ARE BEING CARRIED OUT AT WATER BODIES SUCH AS KHAJRU TALAIYA, JAIL ROAD TALIYA AND BADA TALAB
Regarding Laying the Pipe in the Canal dug to fill the Pond in the Regional Park at Indore
Upkeeping and maintenance of ECO Park near Bareja pond at Nigahi Project for a period of two years
Construction of Tar road and road widening from Dhonti pond to Sacchitanand Shukla house Dhonti Ward no.38
Construction of C.C. Road on Culvert of Rajarani Pond in Ward No. 09, Nagar Parishad Lanji - 2nd Call
Breaking and Transportation of White Stone from Barhata Mine to Narsingh Pond Nagar Palika Parishad Narsinghpur - II Call
Work of installing chain link mesh around Hanumantal pond under Hanumantal ward under division no. 08. (Councillor recommendation)
Construction of CC Road from Budhsen house to Pond and Badan Singh house at Ward No. 03 Sigudi.
EMPANELMENT OF AGENCY TO SUPPLY OF SAFAMITRA AND OTHER EMPLOYEES FOR FY 2026-27 AND POND CLEANING WORK