Loading…
Loading…
3,254 results • Best match
Construction of Pakka Check Dam-7, Amrit Sarovar-2, PT-1, Talai-6, Recharge Shaft-9, Sefty/Retaining Wall-5, Anicut Renovation-1 and Talab Renovation-3 in PS Baran
Construction of Amrit Sarovar near samsan ghat village Gopalnagar in GP Thala PS Madhorajpura, Jaipur
Construction of SSB, ECD, BS, MPT, Johad and Amrit Sarovar in MJSA 2.0 Block Thanagazi
Construction of Anicut-5, PCD-4, Amrit Sarovar-2, Retaining Wall-1 and Field Outlet-1
Construction of Farm pond, sunkon pond, percolation tank, recharge shaft, SSB, Talab and Talab renovation work PS Bhusawar under PMKSY 2.0
2_Construction of Anicut, Pacca Chekdam, WHS, Sunken Pond, Farm Pond, MPT, Other N.R.M. Work, Amrit Sarovar Work and Rennovation of Anicut (Total 46 Works)in GP Peepalwas, Sukhwara, Nahargarh, Kannoj PMKSY 2.0 Project Chittorgarh WDC-2 Block Bhadesar
Construction of Farm Ponds Sunken Pond SSB and Bank Stabilization in Pisangan
Construction of Amrit Sarovar and Recharge Shaft in MJSA-2.0 Phase III Block Mundawar. (Package No. 03)
Construction of Amrit Sarovar, Talai, Johad and Recharge Shaft n MJSA 2.0 Block Kotkasim (Package No. 02)
Construction of Amrit sarovar nirman karye and pacewall weist wier pasture ke pass PMKSY-2.0 block malpura
Construction of NRM works under PMKSY 2.0 WDC-4/2021-22 Amrit Sarovar (2), Anicut (7), WHS Cum Rafat (7), Talai (Talab) (3) and Farmpond (3) at various Villages of P.S. Sultanpur District Kota.
Construction of Farm Ponds Khadin Sunken Pond Percolation Tank under PMKSY 2 in Bhinai block
Construction of Farm Ponds Sunken Pond and Khadeen Works in RGJSY Area of Bhinai Block
Construction of Farm Ponds,MPT, Sunken Pond, Field Bunding etc in IWMP 17 project
CONSTRUCTION OF NRM WORK G-3 ANICUT, PAKKA CHECK DAM, MINI PERCOLATION TANK, SUNKAN POND, FARM POND OR AMRIT SAROVAR AT W.C. PARAPEEPLI, RANAYRA,PADLIYA, TALAWALI OR KOLVI URF MANDI RAJANDRAPUR UNDER PMKSY-2.0 (WDC-3) P.S. DAG DISTRICT JHALAWAR
AMRIT SAROVAR, MPT,SUNKUN POND
Construction Of Farm Pond And Talab Rennovation In Arain Block
Construction of Amrit Sarovar, WHS and Recharge shaft in MJSA 2.0 IInd phase Block Mundawar (Package No. 01)
4_Construction Work of Amrit Sarovar in GP Gudakheda PMKSY 2.0 Project Chittorgarh WDC-7 Block Nimbahera District Chittorgarh
Material Supp. gram panchyat Talab
Construction of Anicut Renovation, Talab Renovation, CCT, Farm Pond
Construction of Amrit Sarovar -1, Anicut/Pakka Checkdam -29, MPT/PT-9 . Scheme PMKSY-2.0 Block Shahabad District - Baran
Construction of anicut, Amrit Sarovar, Percolation Tank and MPT in MJSA- 2.0 Phase III Block Kishangarhbas (Package No. 01)
Construction of Amrit Sarovar, MPT, PT, WHS, Renovation and Recharge Shaft n MJSA 2.0 Block Kishangarhbas (Package No. 01)
Construction of Farm Ponds, Sunkne Pond and Khandin Renovation in Block Bhinai under PMKSY 2.0
Anicut, Pucca Check Dam and Amrit Sarovar Work G.P. Bori P, Kelamela, Kupada, Morvaniya, Sagbari, Tamatiya, Peepalkhunt. Block-Peepalkhoont Pratapgarh-WDC-7
Construction of Pakka karya Anicut, Pakka check dam, Amrit Sarovar, Percolation tank and Recharge shaft works PS Bayana Under PMKSY 2.0
Construction of Farm Pond, Field Bunding, Sunkon Pond and Talab renovation work under RGJSY-1 Project in Masuda block
HARI BHARI POKHAR WSP NIRMAN KARYA GRAM PANCHAYAT KALAKHO
Gundolav lake Development work MLA FUND
Model Talaab 50 GG
MATERIAL SUPPLY GP TALAB
GP TALAB MATERIAL SUPPLY
MATERIAL SUPPLY GP TALAB
MATERIAL SUPPLY GP TALAB
2_Construction of Recharge Shaft(4), Roof Top Rain Water Harvesting Structure (1), Anicut Cum Causeway(1) and Renovation of Talab/Nadi(5), Amrit Sarovar(2) Gundali, Tana, Kanadkhed PMKSY 2.0 Project Chittorgarh WDC-4 Block Bhupalsagar District Chitto
Construction of Amrit sarovar, Johad, WHS and CCT Nirman Work in MJSA 2.0 Phase II Block Thanagazi (Package No. 02)
2 Amrit Sarovar, 7 Anicut AND 54 Farm Fond Construction in Project Sikar-WDC-01/2021-22 Block- Ajitgarh, Sikar
CONSTRUCTION OF PAKKA CHECKDAM, GABION ,AMRIT SAROVAR AND RECHARGE SHAFT UNDER WDC-4 PMKSY2.0 PS-PIRAWA DIST.-JHALAWAR( 29 WORK )
FOUNTAIN INSTALLATION WORK FOR BEAUTIFICATION IN POND AT NAYA TALAB
Construction of Amrit Sarovar, Anicut, Pakka Check dam, Mini Percolation Tank and Percolation Tank in Gram Panchayat of Bhanwata, Dob, Nayawas and Palunda, Panchayat Samiti Ramgarh Pachwara, District Dausa
Baundry Ball Nirman Work gau Ghat Badi Pokhar Gushyari
CONSTRUCTION OF 2 PAKKA TALAB,9 FARM POND, 176 TANKA IN G.P. LAMBA, BUDANIYA,DHARTWALA AND LAMBA GOTHRA
Pakka Work- Amrit Sarovar, Anicut, PCD, Recharge Shaft, RTWHS Works 20, GP Karunda, Kesunda, Gagrol, Narani, Semarda, Block Chhotisadri WDC-3
Construction of Amrit sarovar, Percolation tank, Anicut and pakka check dam under PMKSY 2.0 in Project Area Panchayat Samiti Keshorai Patan
Construction of Sunken Pond, Diversion Channel, CCT, SGT, Pakka Check Dam and Pokhar under RGJSY P.S. Bayana
pokhar surksha diwar nirman karya chhoti pokhar jheetredi
PCD, MPT, PT, Farm Pond, Sunken Pond, Talab Renovation ,Recharge shaft and ANICUT at Panchyat Samiti Malakhera
Construction of Anicut Renovation, Talab Renovation, Farm Pond at P.S. Kareda
civil work inside pond , sketing and other work at naya talab