Loading…
Loading…
2,499 results • Best match
Laying of CC road from H.No.18-7-425/325 to Masjid E Salam Mahaboob Anwar at Road No. 7 in Siddiq Nagar in 34- Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC Rs.4.30 Lakhs
Remodeling of pipe drain H.No. 18-7-425/432/4 to 18-7-425/432/9 Aman Nagar B in Talab Chanchalam in Santosh Nagar, Cirlce-7, CRZ, GHMC in view of Moharram 2019 Rs. 0.80 Lakhs
Raising of Catch pits various places at Khan Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC in view of Ramzan Festival 2019 (Reserved for ST Contractors / Proprietorship Firms / Partnership Firms) Rs.2.50 Lakhs
Pre Monsoon and Annual Desilting of Nala from Labour adda to Hidayath Masjid via Mammu Kirana store and Chacha Garage of 34-Talab Chanchalam in Santosh Nagar Circle-7, South Zone, GHMC. Rs. 5.10 Lakhs (2nd Recall)
Construction of SW Drain of 450mm dia and CC at 18-7-423/A/26 18-7-423/A/27 Aman Nagar B in 34-Talab Chanchalam in Santosh Nagar Circle -7, CRZ, GHMC Rs. 3.70 Lakhs
Laying of Damaged CC road with vibrated Disc from H.No. 18-7-425/376 to 18-7-425/396 at Bhavani Nagar in 34-Talab Chanchalam division in Santosh Nagar Circle-7, CRZ, GHMC Rs. 26.15 Lakhs
Laying of CC road from H.No. 18-7-425/86/2/A to H.No. 18-7-425/107 at Siddiqui Nagar Road No.2 in 34-Talab Chanchalam, Santosh Nagar Circle-7, CRZ, GHMC Rs. 6.95 Lakhs
Laying of SS flooring and providing to Jungle cutting, white wash to Salam Chause graveyard in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC. in view of Shab E Barath Festival 2022 Rs.3.30 Lakhs
Supply and Fixing of RCC Covers at Akram nagar in view of Ramzan Festival 2023 in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC(Reserved for Sagara/ Waddara community Individuals and Societies) Rs. 1.30 Lakhs
Remodeling of SW Drain of 450 mm dia & Restoration from H.No. 18-7-425/325 to 18-7-425/327 at Siddiqui Nagar in 34-Talab Chanchalam, Santosh Nagar Circle-7, CRZ, GHMC(Recall) Rs. 1.47 Lakhs
Providing barricading on both sides of bund and repairs to approach roads from R.R.Nagar to Rayasamudram baby pond in Ward No.112 Ramachandrapuram, Circle-22, Serilingampally Zone, GHMC
Engaging of JCB for digging of pond in manair river and Blade Tractor for levelling roads, removing bushes and Ganesh Immersion place and other areas in Sircilla Municipality
Engaging of JCB, DOZER and ROLLER with levelling of Morram Dam the Pond at Uma Maheshwara Colony Ward no.13 in Kompally Municipality under General Funds 2025-26 .
Providing of man power for cleaning of baby pond at boin cheruvu Hasmathpet in view of Ganesh Immersion in ward no 119 old bowenpally Kukatpally circle-24, GHMC
Laying of 450mm dia RCC NP3 pipeline for diverting the water from existing box drain to pond at CARO in Ward 149 Begumpet Circle 30 Secunderabad Zone GHMC
Arrangements and cleaning of baby pond before and after Chatt Puja for the year 2024-2025 in ward no-134, Alwal Cirlce-27, GHMC (Reserved for Waddera /Sagara )
Handling and Immersion of Ganesh Idols duly supplying stationary cranes along with labour at Pariki cheruvu, Lingam Cheruvu and Earthpit pond in Gajularamaram Cir-26, Kukatpally Zone -2023
Construction of pond (size 23 MtX13 Mt X 1.80 Mt) for Ganesh idol immersion at Maruthi Nagar for the year 2023, Ward-94, Shaikpet, Cir-18, KZ, GHMC
Providing of Man Power for Cleaning of Baby Pond at Boin Cheruvu Hasmathpet in view of Ganesh Immersion In ward No 119 Old Bowenpally Kukatpally Circle-24,GHMC.
Making arrangements for Chatt pooja at Vennela gadda baby pond and various places in Jeedimetla ward 132 for the year 2024 in Quthbullapur Circle-25,KP Zone, GHMC
Providing injection bore wells in existing pond at CARO (Begumpet Airport) for avoiding water logging at IOCL Prakash nagar in ward 149-Begumpet,cir-30,SBZ,GHMC (Recall)
Laying of 450mm dia RCC np3 and 300mm dia SWG pipe line from Lotus pond culvert to Subashnagar near nallapochamma Temple, Subashnagar slum in Ward.no.135 (item.no.1)
Engaging of Dewatering pump sets and labour at Baby Pond, Nalla Cheruvu, Ward No, 10-Uppal in view of the Ganesh Nimarjanam-2022 in Circle-2, Uppal, GHMC.
Construction of excavated pond of size 20 X 10m for ganesh idol immersion at Gudimalkapur Jamsingh temple, Under Gudimalkapur-71, Mehdipatnam, Circle-12, KZ, GHMC (Item No.1)
Submersible pump set repairs and maintenance material at Road.No.39 Park, Gundu Park, Road.No.72 Park, Lotus Pond -I, Mithila Nagar Park, Jubilee Hills, Cir-18, KZ, GHMC
Filling of Water at Baby pond on the occasion of Festival Durgashtami for Immersion of Durgha idols - 2024 in 91-Khairathabad, Cir-17, KZ, GHMC (Item No.02)
Placing of temperory portable pond on occasion of Saddula Bathukamma on 10-10-24 at Mandal office ground in ward no:19, Saroornagar of Saroornagar circle-5, GHMC
Handling and Immersion of Ganesh Idols duly supplying stationary cranes along with labour at Pariki cheruvu, Lingam Cheruvu and Earthpit pond in Gajularamaram Cir-26, Kukatpally Zone -2022
Providing temporary Pond in view of Bathukamma festival at Vitobha temple in 50-Begumbazar corporator division in Ward-15, Division-14 GHMC ( Item no.1) Rs.2.40 lakhs
Engaging of Labour in Kapra lake, Kapra baby pond for Lifting of Ganesh idols in view of Ganesh Nimajjanam-2025 in Kapra Circle-01, GHMC.(Rs.4.25 Lakhs)
Providing of mobile toilets (1 Male and 1 Female unit) near baby pond during Ganesh Nimarjanam at Kotha cheruvu, ward 134 Alwal Circle, GHMC( Reserved for Waddera /Sagara)
Arrangements for bathukamma festival and cleaning of baby pond before and after festival for the year 2025 in ward no-134, Alwal Cirlce-27, GHMC(Item No.20)
Supply and spreading of stone dust and development of artificial water pond at Bhadrakali Temple Parking Place in Division No.11 (Reserved for SC Individuals and SC Societies)
Providing of Man Power for Cleaning of Baby Pond at Boin Cheruvu Hasmathpet in view of Ganesh Immersion In ward No 119 Old Bowenpally Kukatpally Circle-24,GHMC.
Laying of 300 Dia pipeline from H.No.18-7-425/426/ to 18-7-426/644, all by lines, Siddiq Nagar, Talab Chanchalam under Gowlipura section 2) Laying of 300mm Dia pipe line from H.No.18-7-425/430/A to 18-7-425/418, Road No.11, Siddiq Nagar, Talab Chanchalam under Gowlipura section, Sub Division-I of Operations and Maintenance Division-II (B) (Reserved for SC contractors only as per G.O.MS.No.59, I&CAD (Reforms) Department Dated:21.05.2018)
Office Chair (V3) (Q2)
Package No. 1 - ATAL TINKERING LAB OF NITI AAYOG ELECTRONICS DEVELOPMENT, ROBOTICS, INTERNET OF THINGS AND SENSORS (Q3)
Classroom Stools (Q3)
High End Laptop - Notebook (Q2)
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) ( ( 3 3 ))
Interactive Panels with CPU (Q2)
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Construction of RCC slab (box drain type) at 18-7-423/1/M/6/1/B, 18-7-423/1/M/B/1/B at Bhavani Nagar in Talab Chanchalam Div (Reach-II) (3rd Recall) Rs. 20.00 Lakhs
Laying of damaged CC road from H.No. 18-7-425/24/10 to 18-7-425/78/5/2 via Nijam Kirana at Bhavani Nagar in 34-Talab Chanchalam, Santosh Nagar Circle-7, CRZ, GHMC Rs. 1.73 Lakhs
Construction of SW Drain 600mm dia and laying of CC road 18-7-425/90/12, 18-7-425/94/8 to Al-Yaseen Hotel, Bhavani Nagar in 34-Talab Chanchalam in Santosh nagar Circle-7, SZ, GHMC
Remodeling of SW Drain of 450 mm dia & Restoration from H.No. 18-7-425/502/C to 18-7-425/623 at Siddiqui Nagar in 34-Talab Chanchalam, Santosh Nagar Circle-7, CRZ, GHMC(Recall) Rs. 1.41 Lakhs
Laying of CC road at H.No. 18-7-423/1/M/C and 18-7-423/A/616 at Aman Nagar B in 34-Talab Chanchalam Division, Santosh Nagar Circle-7, CRZ, GHMC(RMC Work) Rs. 6.75 Lakhs
Construction of SW Drain of 600mm dia at 18-7-425/70/1, 18-7-425/53/A, 18-7-425/51 at Bhavani Nagar road No. 1 in 34-Talab Chanchalam, Santosh Nagar Circle-7, SZ, GHMC
Laying of CC patch from H.No. 18-7-425/429 to H.No. 18-7-425/464 via 18-7-425/461 at Siddiqui Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC Rs. 2.50 Lakhs