Loading…
Loading…
2,499 results • Best match
Laying of CC road from Masjid Haji Mohammed Hidayath to 18-7-198/E/18/A/1 to 18-7-198/D/11 Nasheman Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMCRs.7.15 Lakhs
Laying of 450 NP2 pipe and CC road at 18-7-426/76/B to 18-7-198/D/58/A Nasheman Nagar in 34-Talab Chanchalam division in Santosh Nagar Circle-7, CRZ, GHMC Rs. 22.50 Lakhs
Laying of CC patches from 18-7-423/A/1/K to 18-7-423/A/45 at Salman Masjid in Aman Nagar B in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC Rs. 6.85 Lakhs
Construction of SW drain with 450 mm dia and laying of CC road opp. Masjid E Saleema Khatoon road No.1 at Siddiq Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC Rs. 3.35 Lakhs
Pre Monsoon Desilting and Maintenance of nala from Labour adda to HidayathMasjid via Mammu Kirana store and Chacha Garage for the year 2022 of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC. Rs.7.05 Lakhs
Laying of SW Drain with 300mm dia Np2 and CC road from H.No. 18-7-425/86/61 to 18-7-425/86/84 at Siddiqui Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC
Providing Drilling of Borewell and Sintex storage tank at Masjid e al arab hamudiya Bhavani nagar in 34 -Talab chanchalam in Santosh Nagar Circle-7, CRZ, GHMC.(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs.2.69 Lakhs
Laying of RCC slab on Nala at 18-7-425/411/A, 18-7-425/418/A and 18-7-425/468 of Siddqui nagar and Khan Nagar of 34-Talab Chanchalam, Santosh Nagar Circle-7, SZ, GHMC
Premonsoon Desilting and annual maintenance of SW Drain at Bhavani Nagar for the year 2022 of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC. (Reserved for Sagara/ Waddara community Individuals and Societies)Rs.12.80 Lakhs
Laying of CC road with Vibrated Disc from H.No 18-7-425/70 to 18-7-425/51/2 along with Railway track at Bhavani Nagar in 34- Talab Chanchalam division in Santoshnagar Circle-7,CRZ,GHMC.(Recall)
Repair to damaged SWD catchpits and RCC Catchpits at Saraswathi Nagar and Bhavani Nagar Various Places in 34-Talab Chanchalam in Santosh Nagar Circle-7,CRZ,GHMC.(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 2.00 Lakhs
Construction of RCC slab (box drain type) at 18-7-423/A/65/A, 18-7-423/A/14, 18-7-423/A/16 at Bhavani Nagar in Talab Chanchalam Div (Reach-I) (3rd Recall) Rs. 20.00 Lakhs
Engaging Hitachi for Shahatam Talab,Taj Banjara and other lakes for removal of water hyacinth, grass and garbage on Musi River from Puranapul Bridge to Attapur Bridge for 3 months under Khairatabad Zone,GHMC KZ, GHMC (2025-26)
Estimate for Providing of Temporary Lighting with LED lights (100 No's) and 1 No Diesel Generator Set on Hiring basis to provide power supply to the Temporary Lighting at various ponds for 2 days (as per field requirement) of November-2020 in view of Chat puja-2020 in Alwal Circle-27, KPZ, GHMC.
Providing of Temporary lighting on Hire basis with 110/120W LED Lights, Pedestal fans, Mike sets at Portable Rubber tanks, excavation Ponds and its approach roads in Vanasthalipuram & Hasthinapuram divisions in LB Nagar Circle-(4) and DG Set for 5 days on the occasion of Ganesh immersion for 11 days from 07.09.2024.
KTPS - V&VI Stsages - Providing RCC lining along C Pond Slopes of KTPS - VI Stage Ash Disposal Pipelines to avoid damage of bund slopes due to Bursting of Pipelines
Providing arrangements for Chatt puja from 25-10-2025 to 28-10-2025 at Baby Pond,Koneru at Nalla Cheruvu, Ward No. 10-Uppal, Division No. 2-Uppal, GHMC
KTPS-V &VI Stages - Civil - O&M-II - Formation of approach Road along the KTPS VI th Stage ash disposal pipeline between compound wall and C pond inspection path
Arrangements for Ganesh Immersion and Engaging of Dewatering pump sets and labour at Baby Pond, Nalla Cheruvu in view of the Ganesh Nimarjanam-2023 in Circle-2, Uppal, GHMC.
Providing arrangements for Chatt puja from 07-11-2024 to 08-11-2024 at Baby Pond,Koneru at Nalla Cheruvu, Ward No. 10-Uppal, Division No. 2-Uppal, GHMC.
Arrangements for Ganesh Immersion and Engaging of Dewatering pump sets and labour at Baby Pond, Nalla Cheruvu in view of the Ganesh Nimarjanam-2024 in Uppal Circle-2, GHMC.
Providing Civic amenities in view of the Ganesh Nimajjanam-2025 for immersion of Idols at Mansoorabad Baby Pond in Ward No. 12, Mansoorabad of Hayath Nagar Circle-3, GHMC.
Providing amenities and arrangements for Vinayaka Nimmajjanam at kaidammakunta Cheruvu(BABY POND) for the year 2024-25, at Ward no 109-Hafeezpet, Division no.21, Chandanagar Circle-21, GHMC
Handling and Immersion of Ganesh Idols duly supplying stationary cranes along with labour at Pariki cheruvu, Lingam cheruvu and Earth pit pond in Gajularamaram circle 26, kukatpally Zone 2024
Laying of Storm water pipe drain from IALA pond at Auto Nagar to existing - Culvert at Sahara Compound wall in Ward No.12 Mansoorabad of HayathNagar Circle-3 GHMC
Arrangements of Chhath Puja from 29th October to 31st October-2022 at Cherlapally Baby pond lake in Ward No.3, Cherlapally of Kapra Circlre-01, GHMC.(Rs.2.00 Lakhs)
Construction of excavated pond of size 20 X 10m for ganesh idol immersion at Ramleela Ground, Chinthal Basthi in Redhills-75, Mehdipatnam, Circle-12, KZ, GHMC (Item No.28)
Providing amenities and arrangements for Vinayaka Nimajjanam at Baby Pond of Rayasamudram, R.C.Puram, Ward No.112 and Sakicheruvu at Patancheru, Ward No.113 in Circle-22, Slp Zone, GHMC
Engaging of Labour and water drums at Cherlapally baby pond for Lifting of Ganesh idols in view of Ganesh Nimajjanam-2023 in Kapra Circle-01, GHMC.(Rs.1.30 Lakhs)
Construction of Retaining wall from Baby Pond to Bathukamma Ghat at Boin Cheruvu in Old Bowenpally Ward no 119, Kukatpally Circle-24, GHMC. (Reserved for SC Category).3rd call
PROVIDING OF MOBILE TOILETS 1 MALE AND 1 FEMALE UNIT NEAR BABY POND DURING GANESH NIMARJANAM AT IDL CHERUVU, BALAJI NAGAR IN WARD NO. 115 MOOSAPET CIRCLE-23, GHMC
Arrangements of temporary pond for immersion of Bathukamma in the view of Bathukamma festival 2019 at 4th phase in KPHB colony, Ward No. 114 of GHMC, Moosapet Circle - 23
Construction of pond (size 23mt x 13 mt x 1.8mt) for Ganesh idol immersion at Maruthi Nagar for the year 2025 in Ward-94, Shaikpet, Cir-18, KZ, GHMC
Arrangements for Ganesh Immersion and Engaging of Dewatering pump sets and labour at Baby Pond, Nalla Cheruvu in view of the Ganesh Nimarjanam-2025 in Uppal Circle-2, GHMC.
Providing Civic amenities in view of the Ganesh Nimajjanam-2025 for immersion of Idols at Nagole Baby Pond in Ward No. 11, Nagole of Hayath Nagar Circle-3, GHMC.
Providing temporary Pond in view of Bathukamma festival at Vitobha temple in 50-Begumbazar corporator division in Ward-15, Division-14 GHMC,for the year 2025. (Rs. 2.50 Lakhs)
Providing Civic amenities in view of the Ganesh Nimajjanam-2024 for immersion of idols at Baby Pond,Nagole Lake in ward No.11 Nagole of HayathNagar Circle-3, GHMC.
Remodelling and strengthening to closed nala from 18-7-425/C/28 to 18-7-425/157 in Talab chanchalam Div-34, Santosh Nagar Circle-7,CRZ,GHMC(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs.11.00 Lakhs
Pre Monsoon and Annual Desilting of main nala from Samad Hotel to Lalithabagh RUB of 34-Talab Chanchalam in Santosh Nagar Circle-7, South Zone, GHMC. Rs. 9.30 Lakhs (Reserved for SC, ST, Waddera, Sagara (Uppara), Societies) (2nd Recall)
Laying of CC road from 18-7-423/726/B/1 and Abu Bakar Masjid to farhan dairy form in Aman Nagar 34- Talab Chanchalam in Santo sh Nagar Circle-7,SZ,GHMC(Reserved for SC, ST, Waddera, Societies)
Laying of CC road at 18-7-425/386, 18-7-425/318, 18-7-425/43 of Siddiqui Nagar road No. 11 of 34-Talab Chanchalam, Santosh Nagar Circle-7, SZ, GHMC (in view of Ramzan Festival 2018)
Engaging the IRT vehicle (TATA ACE) along with labour and material for filling of pot holes repairs to footpath and SW drains etc, in 34- Talab Chanchalam corporator division in Santosh Nagar Circle-7, SZ, GHMC. (For 6 Months)
Laying of RCC 450mm dia NP2 pipe line at H.No. 18-7-425/46/2 to 18-7-425/46/4 in Bhavani Nagar in 34-Talab Chanchalam, Santosh Nagar Circle-7, CRZ, GHMC (RMC Work) Rs. 2.60 Lakhs
Laying of CC road from H.No. 18-7-425/432/83 opp. Gowsia School at Bhavani Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 4.95 Lakhs
2BHK Housing Programme-Construction of 2BHK(60) Rural Houses Group B (Anjani,Tikaram Thanda, Burugupalli,Samundar Thanda, Shivapur,Talab Thanda, Chavni Thanda,Pocharam Thanda, Pocharam, Vittalwadi Thanda,Vittalwadi&Lingampalli) in Peddakodapgal Mandal of Jukkal Assembly Constituency in Kamareddy District.
Remodelling and strengthening to closed nala from 18-7-425/C/28 to 18-7-425/157 in Talab chanchalam Div-34, Santosh Nagar Circle-7,CRZ,GHMC. (Reserved for Sagara/ Waddara community Individuals and Societies)Rs.11.00 Lakhs
Premonsoon Desilting and maintenance of nala from Talah Masjid to Samad Hotel for the year 2022 of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC. Reserved for SC Contractors / Proprietorship Firms / Partnership Firms)Rs.11.20 Lakhs
Laying of 450 mm dia Np2 pipe line and CC road from H.No. 18-7-425/69/1 to 18-7-425/77 Bhavani Nagar in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC Rs.16.15 Lakhs
Jungle cutting, carting and white washing to Baba Bahuddin Dargah 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC (in view of Shab E Bharat 2023) (Reserved for ST Contractors / Proprietorship Firms / Partnership Firms) Rs. 1.45 Lakhs
Supply and Fixing of RCC Covers at Khan nagar in view of Ramzan Festival 2023 in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC(Reserved for Sagara/ Waddara community Individuals and Societies) (2nd Recall) Rs.1.30 Lakhs