Loading…
Loading…
9,533 results • Best match
23VJSC001 SLUDGE GEAR PUMP TGH 23 65
BAMC--BAMC MEDICAL LIMITED Syringe infusion pump
BOQ (Q3) (PNEUMATIC HAND PUMP FOR CALIBRATION)
BOQ (Q3) (COMPARISON TEST PUMP FOR CALIBRATION)
HPCL VR PROCUREMENT OF DENGYOSHA MAKE PUMP
SUPPLY INSTALLATION AND COMMISSIONING OF VT PUMP
PROCUREMENT OF JET PUMP BODY FOR EVU
Providing Pump Operators in Acharya Nagarjuna University
Procurement of Bottom Ash Pump Model:8LN29B
Providing Pump Operators in Acharya Nagarjuna University
Procurement of Portable Fire Pump for CISF
supply of spares for condensate extraction pump
Procurement of Spares for Boiler Feed Pump
Procurement of spares for BFP Booster pump
Supply of Spares for BFP Booster Pump
Procurement of spares for BFP & Booster pump
Procurement of Spares for Boiler Feed Pump
Procurement of spares for BFP Booster pump
procurement of pump shaft for BFP Model:FK6D30
Procurement of Jacking oil pump for TDBFP's
Procurement of Jacking oil pump for TDBFP's
Gear pump for Wagon Tipplers at Simhadri
Rotary Evaporator with Pump and chiller (Q3)
GTL_MEDICAL_PH.No.02016_MEDICINE_LIGNOCAINE 10% PUMP SPRAY 100 ML
Miniature Circuit Breaker (MCB) for Pump Controller
Self Priming Pump Conforming To IS5120 (Q3)
DE-GASSER WATER PUMP WITHOUT MOTOR (Q3)
EMERGENCY FIRE PUMP (EJ3220D-CH 80-400)
Spare Vacuum Pump and Software Upgrade Kit
GAS detector pump and gas detector tube
Labour charges for Operation of Clarifier, side stream filters,chemical pump house equipment, chlorination plants,collection and preparation of the water samples, coal and ash samples,mixing of various chemicals, upkeeping and maintenance of clarification plant CT ponds, chlorination, sulphuric acid dosing areas chemical stores and inside and surrounding of the building area round the clock from 01.04.2018 to 31.03.2019.
Operation of clarifier, side stream filters, chemical pump house equipment, chlorination plants, collection and preparation of the water samples, coal and ash samples. Mixing of various chemicals, upkeeping and maintenance of clarification plant CT ponds, chlorination, sulphuric acid dosing areas chemical stores and inside & surrounding of the building area round the clock from 01-04-2018 to 31-03-2019.
PROVIDING CC Drain from Medical Comapany to Krishna Nagar Pump house, from Boina Nageswa rao house(14-440/77/2) to Marthala Siva Karthik house(14-440/77/1) and from Annamaneni Durga house(14-440/77/3) to Kareem Basha house(14-308/2/4/1 in Sundaraiah colony 11th ward Tadepalli Urban of Mangalagiri Tadepalli Municipal Corporation under Special Grant.
Operation of clarifier, side stream filters, chemical pump house equipment, chlorination plants, collection and preparation of the water samples, coal and ash samples. Mixing of various chemicals, up keeping and maintenance of clarification plant CT ponds, chlorination, sulphuric acid dosing areas chemical stores and inside & surrounding of the building area round the clock from 01-04-2019 to 31-03-2020.
Replacement of badly eroded pipes and patch welding in dry fly ash and wet ash conveying pipe lines from ESP hoppers to Intermediate silos and coarse ash hoppers to Stage-I pump house and from Intermediate silos to Remote silos of Stage-II (i.e. Units 3 and 4) for a period of one year (From April 2025 to March 2026)
Detailed investigation, designs and Construction of Pump House, associated Civil, Electro Mechanical works, Electrical Sub-Station including Installation, Laying of MS Pressure mains, Manifolds, Construction of Delivery Cistern and canal /piped system by gravity for Lift Irrigation Scheme at Km 106.800 on Right Side Bank of Polavaram Irrigation Project Right Main Canal near Jagannadhapuram Village in Pedavegi (M) of West Godavari District.
Detailed investigation, designs and Construction of Pump House, associated Civil, Electro Mechanical works, Electrical Sub-Station including Installation, Laying of MS Pressure mains, Manifolds, Construction of Delivery Cistern and canal /piped system by gravity for Lift Irrigation Scheme at Km 106.800 on Right Side Bank of Polavaram Irrigation Project Right Main Canal near Jagannadhapuram Village in Pedavegi (M) of West Godavari District.
Detailed investigation, designs and Construction of Pump House, associated Civil, Electro Mechanical works, Electrical Sub-Station including Installation, Laying of MS Pressure mains, Manifolds, Construction of Delivery Cistern and canal /piped system by gravity for Lift Irrigation Scheme at Km 106.800 on Right Side Bank of Polavaram Irrigation Project Right Main Canal near Jagannadhapuram Village in Pedavegi (M) of Eluru District.
Dr.NTTPS-O&M-Civil-Clearing the light jungle in Road No. 1 &4, ABC Road, Water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220KV switch yard bays & empty bays and ... BCW Pump house Stage-III ...
PROVIDING CC Drain from Medical Comapany to Krishna Nagar Pump house, from Boina Nageswa rao house(14-440/77/2) to Marthala Siva Karthik house(14-440/77/1) and from Annamaneni Durga house(14-440/77/3) to Kareem Basha house(14-308/2/4/1 in Sundaraiah colony 11th ward Tadepalli Urban of Mangalagiri Tadepalli Municipal Corporation under Special Grant.
Construction of Valve Pits at 1. Indla Samrajyam house, 2. Indla Sambaiah house, 3. Near OHSR, 4. Near MPP School, 5. Tirumalasetti Bhaskar House, 6. Munnangi Seshi Reddy House, 7. Near Matham and 8. Near Pump House and Providing Culvert Slabs at Lamkotu Sarvaiah House in Ippatam Village Tadepalli urban Under AE-4 section in Mangalagiri Tadepalli Municipal Corporation Under Municipal General Funds
PROVIDING CC Drain from Medical Comapany to Krishna Nagar Pump house, from Boina Nageswa rao house(14-440/77/2) to Marthala Siva Karthik house(14-440/77/1) and from Annamaneni Durga house(14-440/77/3) to Kareem Basha house(14-308/2/4/1 in Sundaraiah colony 11th ward Tadepalli Urban of Mangalagiri Tadepalli Municipal Corporation under Special Grant.
Providing of 41 No's contractors workmen to assist in Trouble shooting round the clock, Upkeeping, Routine, Preventive and minor breakdown works of Common Auxiliaries equipment and equipment in WTP, ETP,STP,Raw water pump house, Cranes in above areas, ventilation system, Compressor air system of Unit-I & II of SDSTPS for the period from 01.04.2017 to 31.03.2018 including consumables (LPG,DA,O2 gas).
Fire Fighting Pump 2500 GPM capacity @150 meter head, Fire Fighting Pump 4000 GPM capacity @150 meter head, Fire Fighting Pump 4000 GPM capacity @50 meter head
Pump Bellow, 900NB, NMEJ, VRMP SWCT (Q3), Suction, 300NB, VRMP BCWCT (Q3), Discharge, 250NB, Return line, 450NB
Dosing Pump for MODU Sagar Bhushan
Supply delivery and fixing of motor pumpset,Panel Board and pipe line inter connection materials for maintenance of water supply in New Ganga Colony at 22nd division for new Borewell in chittoor Municipal Corporation.
Supply delivery and fixing of motor pumpset,Panel Board and pipe line inter connection materials for maintenance of water supply in New Ganga Colony at 22nd division for new Borewell in chittoor Municipal Corporation.