Loading…
Loading…
2,185 results • Best match
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
deepwell hand pumps as per IS 15500 (Part 2) (Q3)
NRV with flanges for Condenser Vacuum pumps, wards make
Construction of RCC dyke wall in common dyke area of line balancing tanks PL 05, 06 and 07 at BKPL Barauni Pump Station
Earth filling in low lying areas near PL-04 tank along with other associated works (e.g. leveling, compaction etc.) at BKPL, Barauni Pump Station
MOEI and fans, O/M of Pumpset, compound light, 200 kva DG set and 315 KVA transformer with substation equipment, 13 passenger capacity lift, street light, AC unit and AFA system etc at Central excise office building at Aurangabad Subwork/Packages: ... supply pump set , ...
REPAIR MAINT OF LT FP JBs POLE BOX HIGH MAST AND AREA LIGHTING LT OH LINE UG CABLE BUNCH CABLE AND CONNECTED WORKS AND PUMP HOUSE POWER HOUSE AND STORE AT EM INSTALLATION AT DANAPUR UNDER GE DANAPUR CANTT
PROCUREMENT OF DIFFERENT ASH WATER PUMPS OF STI UNDER CAPITALEXPENDITURE FOR BARH
Supply, Supervision during Installation and Commissioning Of Complete new MS Circulation Pumps at Barauni Refinery.
PROCUREMENT OF DISCHARGE BOWL OF DCW PUMP ST-I, IMPELLER FOR GANGAMAKE-UP PUMPS INSTALLED IN ST-I, BOWL OF DCW PUMP INSTALLED AT GMUPHST-II AT NTPC KAHALGAON.
Motorized Barrel Pumps for transfer of Liq Ammonia in preparation tanks
Procurement of CW Pumps for CHP ST-2 at NTPC BARH.
Procurement of mechanical seal for SAM Turbo make pumps, KBUNL Kanti.
PROCUREMENT OF ASSEMBLY AND SPARES FOR BALP, BAHP and AWRS PUMPS
Procurement of Mechanical Seals and Spares for BFP and Booster Pumps
Procurement of levcon make level Switches for CT fan CW pumps
Supply of Kosaka Make oil Pumps Spares at IOCL Barauni Refinery
IMPELLER AND IMPELLER LINER OF MAKE UP WATER PUMPS AT NSTPS
Maintenance and Inspection of PL-07 petroleum storage tank (HSD) at Barauni Pump Station of BKPL (Nominal capacity of 10,000 KL, 34M Diameter and 12M Height)
Dismantling of redundant fuel oil tank no. 1 and 2 (each 250 KL Capacity) and associated Dyke wall, Piping and equipments at BKPL Barauni Pump Station
MOEI & fans and operation of Pumpset at CPWD Residential colony and office campus, Punaichak, Patna for the year 2026-27.
Custom Bid for Services - BMC for LT motors of Main Plant and Off Site AWRS and Make up pump house Buffer Hopper Area Brick plant area etc of MTPS NTPC KANTI Similar Category Operation and Maintenance Power House/Power Plant
Operation And Maintenance Of Other Machines And Plants - Carrying out Running preventative and Breakdown maintenance job in filling shed ST plant pump house and allied area on daily basis at IOCL Banka Bottling Plant for a period of 06 Months
Supply of foundation bolts for M/s Ruhrpumpen make pumps for re-installation of BKPL Barauni
LT- Basis
Supply of Suction and Discharge Valve for Cooling Tower Pumps At Barauni Refinery
MOEI and Fans, O/M of W/S pump sets, Compound light, 200 KVA DG set and 315 KVA transformer with Sub-stastion equipment, 13 passenger capacity lift, Street light, AC unit and AFA system, etc. at Central Excise office building at Aurangabad for year 2026-27. SH: AMC and B-Check for 200 KVA DG set.
PROCUREMENT OF SPARES OF PUMPS IN SEWAGE TREATMENT PLANT AT NTPCNABINAGAR STPS
Procurement of Complete Mechanical Seal Assembly of Boiler Feed Pumps inStage 2
Supply and Supervision of Installation, Commissioning and testing of 415V, 800A and 415V, 630A indoor type LT Panels complete with all accessories for BKPL Barauni Pump Station
External painting of tanks PL-04, PL-06, tank farm piping and fire water network piping at ERPL (BKPL) Barauni Pump Station
PROCUREMENT OF HYDRAULIC JACKS, PUMPS MECH.PULLER and ITS ACCESSORIES FOREMD MAIN PLANT NTPC KAHALGAON
Procurement of Motor for Locomotive Pumps and blowers for LocomotivesWDG3A/WDM2 for NTPC Farakka
Testing of Ambient Air Quality, V.O.C. Testing of Effluent Sample of OWS, Noise Level Monitoring, Testing of Drinking Water and Pig Residue Analysis of BKPL Barauni Pump Station
Supply supervision during installation and commissioning of Complete new MS/HSD UnLoading Pumps at Barauni Refinery
deepwell hand pumps as per IS 15500 (Part 2) (Q3) (3 (3 ))
deepwell hand pumps as per IS 15500 (Part 2) (Q3) (3 (3 ))
deepwell hand pumps as per IS 15500 (Part 2) (Q3) (3 (3 ))
deepwell hand pumps as per IS 15500 (Part 2) (Q3) (3 (3 ))
deepwell hand pumps as per IS 15500 (Part 2) (Q3) (3 (3 ))
deepwell hand pumps as per IS 15500 (Part 2) (Q3) (3 (3 ))
Deepwell Hand Pumps Conforming To IS 15500 (Part 2) (Q3) (3 (3 ))
PROCUREMENT OF SHAFT FOR VACUUM PUMPS OF ASH HANDLING SYSTEM AT NTPCBARAUNI
Procurement of WPIL make Thrust Bearing Cooling Coil for CW Pumps StageII