Loading…
Loading…
13,243 results • Best match
Fabrication and supply of CI coupling for Pump
Supply of Rached for Pump Model VT-8A
Spares of CW pump, Unit-7and8,CTPS,DVC
Custom Bid for Services - Repairing of hand pump
Membrane Filter Holder with Hand-Held Vacuum Pump
Procurement of Cooling Pump and its spares CTPS
Set of Pressure gauge for Transformer oil pump
Rotary Evaporator with vacuum pump and chiller (Q3)
Repairing of Pump PV III A, 4 stage.
Procurement of Spares for Pump CHP-230-50
Spares for Pneumatic Diaphragm Pump, Model KDP-250
Hydraulic Pump for DTH KLR 12 128 Rig
Repairing of 6UP3 Kirloskar make Pump at CWS.
Procurement of Diesel Engine Water separator with Pump
THREE PLUNGER BARE PUMP; TP-80; F/TDP
Procurement of Actuators of Vacuum Pump for BTPS
Annual operation and Maintenance contract of Filter Pump
Complete Repairing of DSM II pump at KOCP
Procurement of Water Pump for Tata Hitachi Shovel
Bearings for River Pump Houser and Intake Well
Procurement of Bowl Assembly for Recovery Water Pump
Procurement of Spares of VT Pump Make WPIL
Repairing of 6UP3 Pump at Laikdih Deep Colliery.
29420179-Water Pump Assembly for wiper assembly etc.
Dual-Channel Infusion and Withdrawal Modular Syringe pump
Procurement Pump Spares Model F5826 200 150 Make
spares for Governing oil pump of 9K66 turbine
Supplying installation and commissioning of VT pump set and its allied works at raw water pumping plant Behri Farm for urban water supply pumping plant Chatra
Drilling of 2 nos. 8 dia deep borehole 180 meters depth with summersible pump set, switch room, cable at CISF barrack, sinidih (Bilbera) under Govindpur Area.
HYDRAULIC PUMP 25VQ-21A-1C-20 (Q3), HYDRAULIC PUMP 25VQ-17A-1C-20 LH (Q3), direction control valve CM-11- NO2-RO5-DDDD1L-21 (Q3)
Supply of spares for SP-5 Pump
Complete repairing, overhauling and maintenance of DSM 2 Pump Kirlosker make one set, base plate complete new making, two nos. Coupling, Coupling bolt, Motor, Pump setting and matching for water supply at Hill Top Colony of Bokaro Colliery,
Complete repairing and fitting of 2No. pump of Make Kirloskar 6UP3 Sl.No. KH/pump/6up3/01 and KH/pump/6Up3/02 split casing single impeller 65m head 800gpm of kharkharee colliery of govind pur Area.
Providing and Fixing of different size of H/D asbestos coated graphite lubricated packing for operation of 2000 GPM pump, 1000 GPM pump 32 No. Sump and washing pump under Dakra Project N.K Area CCL
Supply and Fixing of 350 Watt LED Flood Fittings at OB Dump, OB face and lalghutwa pump house of Rajmahal OCP.
repairing of MLA 5 pump at 7,8 incline of Dhori khas ug colliery
Dismantling of pump,replacement of cross head,connecting link,gasket,v Ring packing
Repairing of DSM4 RM Pump Local Si. No. SND-003 for domestic water supply of Saunda D Colliery.
Day-to-day operation of two nos. pressure filter 5000 GPH pumps at 25 no. and 2 no pit under Badjna Colliery (2020-21).
Annual Operation and Comprehensive Maintenance of 3Nos TR Air Cooled Screw Chillers with Associated equipment like AHUS, Pumps Installed at Trauma Centre, Rims, Ranchi
Repairing making/fabricating and providing spares for suction and delivery of the following 1000/2000 GPM pumps installed at mine in respect of SDOCM
Repairing of 04 nos of sluice valve (300 mm) required for 08 nos. HT Pumps running in Amal.NT-ST-JG Colliery under Lodna Area.
Repairing and overhauling of 2 nos. 3.3KV grade, VCBs starters attached with 1000GPM different type of pumps are installed at 3P Quarry of SDOCM.
Repairing and overhauling of 3 nos. 3.3KV grade, VCBs starters attached with 1000GPM different type of pumps are installed at different places of SDOCM.
Fabrication of hose napple of different size and making a new tyre coupling etc . for smooth running of different pumps in r/o AADOCM.
Making and fitting of new coupling for 1000 GPM and 500 GPM pumps and motor in operation at D. D. mines under Bokaro Colliery
Fabrication and installation of nipple matching, moving flange, welding in bend for dewatering from mine with running pumps of Topa Project under Kuju Area
Day to day operation two nos of pressure filer 5000 GPH pumps at 25 no and 2 no pit under Badjna Colliery (2019-20).
Shifting of cable power supply of two pumps by O/H line (conductor) from Pootkee main Sub-Station to Pootkee Chanak under Pootkee Colliery.
Repairing of 60 HP pumps and threading of GI pipes for water supply Kusum Vihar and Koyla Nagar under Civil Engineering Department, BCCL HQ