Loading…
Loading…
13,259 results • Best match
Repairing of two nos. of PM-70 pump at Pure Benidih underground AMP Colliery, Barora Area.
Construction of 3nos. pump foundation in Lower Bachra seam at Churi Ug Colliery, N K Area
Custom Bid for Services - PROCUREMENT OF STATOR ROTORS STARTER FOR VERTICAL TURBINE PUMP AT GRSE DEPRANCHI
Repairing and replacement of spares of V.T pump installed in 4216 pond under CHP-CPP, Piparwar.
Installation of Hand Pump in Ravidas Tola Asanatand Barai Panchayat under CSR Scheme of BnK Area
Completerepairing/overhauling ofMake-MAMC Pump, 600G.P.M. 4 stage, Sl. No.BH(S)/MAMC/04 ofBhowra South Colliery
Repairing of Kirloskar make 100GPM, 100mtr head Pump, SI no. P3, Installed at Sayal-D OCP.
Lifting and lowering of 250HP VT pump no 1 at Dam site of Block-II Area
Complete repairing of 10UPH8 4000gpm 150mtr head Kirloskar make HT pump No4 of Muraidih AMP Colliery
Repairing of 6U18,100 mtr. Head 1000GPM MAXFLOW make pump of ABOCP Mine of Block-2 area
Repairing and rewinding of pump and motor 7HP Sl. No 010 Kandra Coal Board Colony Ropeway.
Running part repairing of 2000GPM pump and other miscellaneous work under Muraidih AMP Colliery, Barora Area.
Complete repairing and overhauling of 6 stage pump Kirloslar make 200kW 1000 GPM of ADI Colliery
Day-to-day operation one no pressure filter (5000 GPH) pump at Kalimati under Chapapur Colliery.
Installation of Hand Pump near Atal Bridge IWSP Kargali side under CSR Scheme of BnK Area
Erection of 3.3 KV OH Line in West Quarry to supply power to pump for dewatering.
Repairing of 6 stage , Kirloskar make ,50Meter Head, 400GPM Pump at Maheshpur Colliery under Govindpur Area
Drilling and commissioning of 05 nos. Hand pump at OB Dump rehab site under Rajmahal Area.
dismounting ,dismantling and repair of Hydraulic brake cooling pump of dumper D-90019 of Purnadih project
Procurement of bearings for Coal mill vacuum pump motors pertaining to 2X500MW units of DVC, KTPS.
Procurement of different spare parts of pump, model-10UPH8 for ABOCP mines under Block-II Area
Repairing and re-conditioning of bearing assembly for PSP pump unit no. 274B of main plant.
Complete repairing of PL II A 6 stage M and P make Pump of ADI Colliery
Complete repairing of 2000gpm centrifugal M and P make EST model pump of Muraidih AMP Colliery
Repairing of flowmore make split casing pump 125x40 , 600 gpm double impeller at east bassuria colliery
Repairing of PV 3 stage M and P make pump at CWS Kustore under PB Area.
Repairing of air compressor, lubrication pump applicable for tyres and lubrication of HEMMs at Ashoka OCP.
Repairing of damaged boundary wall around excavation workshop and diesel pump under AADOCM of Dhori Area.
Part repairing of 2000 GPM pump installed at coal face under Konar Exp. OCP, BnK Area.
Complete repairing of 120mtr.head, 6stage, 600GPM KIRLOSKAR make pump to Muraidih Filter Plant of Barora Area
Repairing and fabrication of transformer shed at Makoli pump Sub-station under Tarmi OCP, Dhori Area
Complete Repairing/ Overhauling of FI Pump of Hywa JH 10AF 5308 at Area Auto Garage, W.J.A.
Repairing and overhauling of pump no. 01 and 02 at BOCM filter plant under Piparwar Project.
Repairing of 01 no Bed plate of 2000 GPM pump installed at karma project Kuju Area.
Repairing and maintenance of pump room and boundary wall at Regional hospital Loyabad under Sijua area
Complete repairing of 4000GPM, 10UPH8, Kirloskar make pump running at ABOCP Mines of Block-II Area
Repair and Maintenance of pump room of Pit water and drinking water Kustore under PB Area
Complete repairing of PL II A 5 stage pump M and P make of ADI Colliery
For Repairing of Pilot (charging) pump of BE1000 Sl. No. G10124 at AKWMOCP, KATRAS AREA, BCCL
Complete repairing and rewinding of Washing pump and Motor set of Area Auto Workshop, Kusunda Area
Repair of 02 nos damaged pump foundation of Raw water pumping section under Govindpur UG Project
Drilling and commissioning of 05 nos. Hand pump at Bara Simra rehab site, under Rajmahal Area.
Repairing of coal face pump, Make DME 8/8, 1000GPM running under Dakra Project, NK Area.
Repair and Maintenance of 291 nos. Hand Pump in ward no. 01 to 36, under GMC
Overhauling / Repairing 06 Stage Maxflow Make 180 Meter Head Pump of Chandmari Section of Bastacolla Colliery.
Complete repairing of 2000GPM RKB Pump make Kirlosker Type RKB/250/46K, 4 stage Jarangdih Colliery.
Complete repairing of Make MAMC pump, 500G.P.M. S.L. n.oBH(S)/MAMC/051of riverside, Bhowra (South colliery).
Repairing of complete rotating assembly of KIRLOSKAR make 10UPH-8, 4000GPM, pump of Muraidih, AMP Colliery.
Shifting of dia.legnth-240 MTRpipe line for1000GPM pump at 4A patch of at Bhowra South Colliery
Repairing of MLA-3 Pump installed at Sayal-D Water filter plant under Sayal-D Project.