Loading…
Loading…
13,263 results • Best match
Repairing of double stage DSM-5 pump and rotating unit complete set of Harina boosting under Block-II Area
Repairing and reconditioning of 1000GPM Pump,4MP/P-118T-150/200 IPB 3CHR of Karma Project under Kuju Area.
Repair work of PTO Pump works of Fire Tender vehicle Reg. No-JH10Y-7838 of Ena Colliery, Kusunda Area
Repairing of M and P 150/200 Sl.No. MND/M and P/150-200/01 Pump of Kapatghat, Moonidih
Full maintenance of MN6 Pump installed at Bhatta Colony for domestic water supply purpose in AMP Colliery Barora Area.
Repairing of 4 stage ,150x125 mm,type MN,Kirloskar HP-129 GPM-400 code No-03 Pump for Jogidih
Repairing works of DST Pump, 1000 GPM, 150 x 200, make M and P of GVP Phase II OCP
Complete repairing and overhauling of Kirloskar pump 1000 GPM Sl. No BH S by 91109640by3 of Bhowra South Colliery
CASTING AND MACHINING OF C.I HOUSING WITH COVER FOR PV III MODEL PUMP AT AREA WORKSHOP UNDER KATRAS AREA
Shifting of 3.3KV 3 phase overhead line from coal depot dispatch point to quarry pump of Bhowra South Colliery.
Repairing of 315 Kv, PV 2 A , GPM 800, Head -350 mtrs. Pump of Kharkharee Colliery, under, Govindpur Area.
Repairing of coal face pump, Make - Kirloskar type - SH 80/40, Head - 45Mtr. running under Dakra Project, NK Area
Repairing of Pump device unit of Tata Hitachi ZX650H, Exc-2961 shovel of Govindpur Ph-II OCP, Kathara Area
Construction of watch-tower and boundary-wall at Aam-dangaal Pump site to prevent cable-theft under lakhimata colliery.
Installation of drinking water facility with Solar pump at village Kumhar Tola Narayanpur and Barai under CSR, DVC ,BTPS.
Construction of PCC Road from Patrol Pump to Chhath Ghat in Pachayat Hosir East under Block Gomia District Bokaro
Repairing of complete rotating assembly of KIRLOSKAR, Make- 10UPH-8, 4000 GPM, pump of Muraidih, AMP Colliery, Barora Area.
Repairing of Slip rings of 460KW/1250KW,6.6 KV motor of main Pump (Sl.No. 11-S5, 11-S4,12-S1)
Repairing of DSM-3 Pump Sl.No.RHB02 for supplying domestic water to Hospital Colony and Regional Hosptial under Barora Area.
Maintenance of 3point3KV overhead line providing power to main patch pump from 1K pit substation at Phularitand AMP Colliery
Complete repairing of 2000gpm centrifugal M and P make EST model pump No 01 of Phularitand under AMP Colliery
Complete repairing of D10D Roto Pump Sl. No BH N by 03 of Bhowra North UG mine 23.8 Incline
Repairing and reconditioning of 1000 GPM, 3CHR, 150m head, IPB type MnP make pump of PEOCP under Hazaribagh Area.
Repairing of shaft for 8 gay pump of unit no. 651 in the Fine Coal Section at Kathara Washery
Erection of 6.6 KV Benidih feeder supply 8 seam DM-31/521, 4000GPM pump DECO patch of ABOCP Mine
Repairing of 2000GPM, 150mtr. Head pump, type 10/12 make MnP Sl No 81316960/20/06 of Rajrappa Project.
Making water supply arrangement from fixed water sprinkler pump to tanker filling point at Amrapali OCP, A-C Area
Complete repairing and over hauling of 75HP 4 Stage Rotodyne pump of 23.8 Incline UG Mine Bhowra North Colliery.
Casting and machining of 12inch dia CI coupling for 3.3KV 2000GPM and 1000GPM pump and motor at Damoda Colliery.
Repairing of SPLI Casing 6/80 GME Double Impeller 2000 GPM/150 m Head Pump at Chandmari Work Shop
Complete repairing of 200A ACB, MINELINE make, CTR-200/5, sl. no.- MHP/ACB-11, controlling of 150HP pump.
Overhauling fabrication and fitting of spares (with material) of 10UPH8, kirloskar pump of ABOCP Mine under Block-II Area
Repairing of double stage DSM-5 Pump and rotating unit complete set of Harina Boosting under Block-II Area
Repairing of dala body and reconditioning of transmission mounting and pump assy of BH60 Dumper D3625 of Rohini Project
Repairing of 04 nos. CI Coupling of 2000 GPM, 200 mtr. Head Make-Kirlosker RKB Pump at Kathara Colliery
REPAIRING AND SERVICING OF THE AIR CONDITIONER REFRIGENATOR, 5 KVA STABLIZER, TULLU PUMP AND CEILING FAN OF KATRAS AREA
Repairing and fabrication of damaged parts or spare parts of the DSM 3 pump as per sample i.r.o. KOCP
Repairing/overhauling of 5UPIM KIRLOSKAR make pump used for water sprinkling in feeder breaker premises of Muraidih, AMP Colliery.
Repairing of 2.5 m 3 /min, main pump by Moulding, casting and machining of spares of Moonidih Project, W.J.Area
Complete repairing of 3 stage, 500 GPM, make MnP pump Sl. No BHS/MnP/02 of Bhowra North Colliery.
Complete repairing of 1000 GPM pump 150 MTR head make-max flow of water treatment of Bhowra (S) Colliery.
Fabrication and erection of reducer with bend pipe and flange of 241 pump in HMS section at Kathara Wahsery
Repairing and reconditioning of MnP make Pluro-III pump, 150 mtr head of Tapin South OCP under Hazaribagh area.
Complete Repairing of 4UP3 pump Kirloskar make of Filter Plant, WJ Area Sl. No.-MND/Filter Plant/4UP3/02
Repairing of VCB Starter 400 HP 3.3 KV Sl. No HS20120 Mine Line Make for BGR HT Pump KOCP.
Rewinding of 180HP 440V GEC make Sl. No 8251744by98 motor 135KW stator of 180HP pump of ASP Patherdih Colliery.
Complete repairing of 2000GPM, 180 Mtr Head Pump of GRW Make, installed at Bhowra South Colliery under E.J. Area
Partial repairing of 2000 GPM pump, Make Flowmore Model-2 stage, Head 150 Mtr under Dakra OCP, NK Area
Complete repairing of 10UPH-8, 4000GPM 150 mtr. Head KIRLOSKAR make pump of ABOCCP mine under Block-2 area
REPAIRING AND RECONDITIONING OF 01 NOS WASH PUMP SL NO NA FOR WASHING CENTRE AT WORKSHOP OF KDH PROJECT.