Loading…
Loading…
13,203 results • Best match
Lifting and lowering of 3 nos. 7.5 HP submersible pump-motor set and repairing of one no. submersible pump at new karmic Nagar colony under Kusunda Area
Complete repairing and rewinding of 120 HP, 550V, 05 Stage submersible pump motor set, Make Pullen (Asset no BCCL/BGH/Submersible pump/03) Breakdown of Burragarh colliery.
Special repair and maintenance of pump house and providing a WC room in side of pump house at Ashok Vihar Colony under GM Unit Piparwar Area.
150 and 200 MM Dia Deep bore Well and Installation of 3HP submersible Motor Pump set with pipe at 5 Different places at BAU and KVK and ZRS under BAU, Kanke Ranchi
Construction of deep bore well with solar power operated submersible pump set, pump house, recharge pit etc. for drinking water at chaingara village under CSR programme 2020-21 of CRS Barkakana
Construction of deep bore well with solar power operated submersible pump set, pump house, recharge pit etc. for drinking water at Ghutuwa village under CSR programme 2020-21 of CRS Barkakana
Lifting and lowering of submersible pump motor sets of Dugda Coal Washery during FY 2022-23
Provision of new submersible pump motor set in proposed new borewell at Koderma PO premises, Jharkhand.
Repairing and Re-winding of 12 numbers 7.5 HP 3 phase, 415V submersible pump Motor sets.
Lifting and lowering of submersible pump motor sets of Dugda Coal Washery during FY 2023-24.
Repair and Maintenance of Hand pump along with 1 H.P Submersible pump motor at Urjanagar colony under Rajmahal Area.
Mulfunction Pump set by other pump set and matching of suction discharge pipe at DG Set pump house and installation of 02 nos. pump set at New Proposed Pump House at Saphi River near Ray Colliery of Bachra Township under GM unit, Piparwar
Shed for protection of Motor - Pump near River side Damodar Pump house, Under Kathara Colliery.
Self Priming Centrifugal Pump
procurement of centrifugal pump
Construction of 03 Nos deep borewell with submersible pump set for water supply at Central Store CETI and AFM office under CRS Barkakana
Annual Maintenance for repairing of submersible pump-motor sets, its lowering and lifting in boreholes and associated works related to the maintenance and repair of submersible pump motor sets installed under water supply dept. CHD for 01 year.
Hoisting of burnt 6stage submersible pump motor set and lowering of repaired submersible pump motor set with cable (three times) at Birajpur bore hole for smooth domestic water supply to nearby villages and colony under Phularitand, AMP Colliery.
BREAKDOWN SUBMERSIBLE PUMP MOTOR SET WITHFLAT CABLE FOR LIGHTING OF 6INC M.S. PIPES 24 NOS FROM BORE HOLE AT NEAR NATIONAL ANGARPATHRA 12 NO. NEAR RAILWAY LINE AND OTHER SUBMERSIBLE PUMP MOTOR SET AND 6INCH PIPES, CABLE, LOWERING
Lifting, repairing ,lowering and installation of 2 Nos. 7.5 HP Submersible Pump Motor set with Starter at new Karmik NagarColony
6inch Dia Deep Bore Well and Installation of 3 HP New Submersible Motor Pump Set with Pipes at 16 Different Place under the Project Rashtriya Krishi Vikas Yojana RKVY under BAU, Kanke Ranchi
Providing water supply in Central School Sugasar with 1 No 2HP Submersible MOTOR pump set Rising Pipe line and 1 No HYDT Etc complete job under Drinking Water and Sanitation Division-02 Giridih
Construction of deep bore well with solar power operated submersible pump set, pump house, recharge pit etc. for drinking water at Ghutuwa (Ward-24) under CSR programme 2021-22 of CRS, Barkakana
Construction of deep bore well with solar power operated submersible pump set, pump house, recharge pit etc. for drinking water at Ghutuwa (Ward-20) under CSR programme 2021-22 of CRS, Barkakana
Supplying installation commissioning and testing of HSC Centrifugal pump set and associated works at Gumo boosting water supply pumping plant Reorganization for urban water supply Gumo area Jhumari tilaiya
Making temporary sand bag check wall across river bed for water storage including cleaning of intake wells at 01 no. and 04 no. pump house at Ray colliery pump house under GM Unit Piparwar Area.
Centrifugal Pump without Motor, 65M
Dewatering pump for RLS MCC
LIFTING AND LOWERING 175 HP SUBMERSIBLE PUMP MOTOR SET ITS ACCESSORIES FROM 2 PIT K.C.C. , KATRAS AREA.
work for Lifting and lowering of burnt 2 nos of submersible pump motor set Dharmabandh 2 pit
Lifting of submersible pump motor sl no PP38628 from 6 no pit alkusa colliery under NGK Colliery
Repair and Rewinding of 20 HP and 30 HP monoblock pump, motor, panel, starter in different places at Urjanagar colony under Rajmahal Area.
Lifting of 180HP submersible pump motor cable and pipe and lowering of 210HP submersible pump, motor, cable and pipe Murulidih 20/21 Pits Colliery under WJ Area
Part A) Changing of Malfunction Pump set by other Pump Set and matching of suction discharge Pipe line at 4 no. Booster pump house, 64 Colony pump house and 03 no. pump near Ray Colliery gate, Part B) 02 no Pump House near Shiv Mandir
COMPLETE REPAIRING/REWINDING OF WPIL MAKE 90 HP, 550V, 2900 RPM SUBMERSIBLE MOTOR AND OVERHAULING OF WPIL MAKE 500 GPM, 2 STAGE, 70 MTR HEAD SUBMERSIBLE PUMP AT BHUTGARIA PUMP HOUSE OF HURRILADIH COLLIERY, PB AREA.
Repairing and rewinding of 10HP 440V 1400 rpm Submersible pump motor set installed at Gandhonia Basti for drinking water supply under Urimari OCP.
Detailed survey designing and drawing Construction of UGR, GSR, Supplying and laying Clear Water rising main and Distribution Main Compound wall Pump House Installation of Centrifugal pump motor with allied works etc under DW and S Division Ramgarh
Lifting and lowering submersible pump set with pipe,cable at Dudha township under Block II Area
Change of malfunction pump set by other pump set and matching of suction discharge pipeline at CISF Colony and Camp pump house and Ashok Vihar Colony pump house under Township(Bachra), GM Unit, Piparwar Area.
A) 3 Pit shaft mouth covering (half part) and making platform for submersible pump-motor set installation. B) Power winch dismantling, transportation and installation from kustore colliery to 3 Pit. C) Lowering of 1 nos 300 HP submersible pump- motor
Repairing /rewinding of two nos. of 7.5 KW/10HP 415 volt submersible motor pump set, fitting of UPVC column pipe, changing of safety glass etc at JRD siding PF 1 of AKKOCP, BnK Area
Construction of deep borewell with solar power operated submersible pump set , pump house, Recharge pit etc. for drinking water at Hazari of Kathara area under CSR scheme 21-22 of CCL, Kathara area.
Construction of deep borewell with solar power operated submersible pump set , pump house, Recharge pit etc. for drinking water at Asnapani of Kathara area under CSR scheme 21-22 of CCL, Kathara area.
Construction of 02 Nos. deep bore well solar operated submersible pump set, pump house and recharge pit etc. for drinking water in different village under CSR Scheme 2020-21 of A-C Area
Repairing of Submersible motor pump at Ambedkar Bhawan and Kali Mandir Filter Plant Sayal-D under Sayal-D Project.
Repairing of 7.5HP, 12 Stage 01 No Bore Well Submersible Motor Pump and Accessories at Murli Nagar Town Ship.
Installation of Existing Pump Motor at New Pump house, Sanction and Delivery Pipe line, N.RSluice Valve, Common Header for Bhooli Pump House Under JMADA Dhanbad
Onsite repair, maintenance of pump sets 1) 6UP4 pump set, 500 GPM, 2) 8/8 pump set 3) Flowmore 1200 GPM pump including dismantling of pump set from its base plate, its overhauling, repairing and refitting, re-connecting of the pump with suction and d
SELF PRIMING MONOBLOCK CENTRIFUGAL PUMP