Loading…
Loading…
13,239 results • Best match
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-13)
(SVS-07) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-20)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-29)
Construction of Block Kuchai Panchayat Rugudih, Village Rugudih, tola chetan tala tola, Rural water supply Scheme with 1.0 HP DC Solar motor pump complete set Deep T W of 125 115mm Dia,90mtrs deep Drilled Tube Well for Tolas Village Areas.
Dismantling and diversion cum erection of the 3.3 kV OH Line including sag adjustment and replacement of low insulation value insulators and jumpering for feeding power to the new proposed location of the 2000 G.P.M. Pump Motor set in Mine, w.r.t.
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-15)
Construction of water supply Scheme with 3.0 HP 30 STAGE motor pump complete set and 300mtrs deep Drilled of 200/165 mm At Vill- KARI PAHRI SANTHAL TOLA and GANDU PARTHA SANTHAL TOLA , Panchyat- SURAJBERA Under Construction of water supply Sch
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-23)
(SVS-03) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS.
(SVS-04) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS
Retrofitting of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Birhortanda of Kalapather Village under Sariya Block under D.W S Div-2, Giridih
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-24)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-16)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-6)
(SVS-06) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS
Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set for Block-Kuchai, Panchayat-Gomiadih and Baruhatu, Village-Karerango and Baruhatu which is not included in MVS and has no electricity or less electricity to suppl
Construction of 10 nos water supply scheme with 1 HP DC solar motor pump with existing source of water 2000 LPH steel sturcture HDPE water tank through the head of 15th finance zila parishad chaibasa under DWS Mech Div Chaibasa
Transporting assembling and installation of one set of pontoon 4small box and 1big box on 3rd patch sump and assembling transporting and installation of 4000 GPM pump motor set on the pontoon and jointing its delivery with the existing range transpor
Cutting, jointing and laying 8 inch dia G.I. Pipeline required for lowering of the 2000 G.P.M. Pump Motor Set involved in supplying water to the Village Pond, two times in a period of one month, w.r.t. Karo OCP, BnK Area
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-5)
Transporting, installation of 2000GPM pump Motor set at Old Ghutway Partch-3 main sump and erection of its 8inch dia Pipeline for dewatering of mine water and other miscellaneous pumping and pipeline works at old Ghutway patch-3 at Damoda Colliery.
150 H.P. PUMP MOTOR SET COMPLETE WITH ELECTRICALS AND MECHANICALS SHIFTING FROM 2 SEAM U/G 38 LEVEL TO 37 LEVEL DIP PUMPING SIDE AND ONE 150 H.P.MOTOR TAKING OUT FROM 37 LEVEL TO SURFACE CHP BY MANUALLY WITH OUT
Const of Solar Motor Pump based MWSS in PVTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No 2 Dumka for the year 2024-25 (JJM) Group No PVTG-9
Construction of water supply Scheme with 2.00 HP DC Solar motor pump complete set 300 mtrs deep drilled of 200mmX165mm at GP- Babupur Vill- Daldali Near Babudhan Marandi House vill-Daldali near Amin Mariya house GP-Murgadanga Vill-Talpahari Lan
A Providing and commissioning of a DOL Starter inclusive the work repairing and modification in starter to use at 50HP sprinkler pump motor at JRD Siding. B Providing and commissioning of a DOL Starter inclusive the work repairing and modificatio
Replacing of damaged 2nd drum pontoon of Jarlahi patch sump and installation and commissioning of 2nd 4000GPM pump motor set on the pontoon and diversion and erection of its pipe line for fast dewatering of mine water of Phularitand, AMP Colliery.
Shifting of two set of pontoon along with 600gpm and 4000gpm pump motor set from east side sump to south east side sump Jarlahi patch along with diversion of its pipe line at main patch of Phularitand under AMP Colliery
Shifting of HT 2000 GPM Pump Motor set in another side of the sump along with diversion of its 8 inch Dia M.S pipe line due to advancement of mining activities at old Ghutway patch-3 of Damoda Colliery, Barora Area.
(A) Repairing of one no 3.3 KV 400 Amps, YASKAWA make starter and (B) repairing of one no 3.3 kv 400 amps Andrew Yule make starter for control of 1000 GPM pump motor set installed at IWSP under BnK Area.
Shifting of HT 2000GPM Pump Motor set in the safe side of the sump due to gradual decreasing/increase of water level at N D patch main sump along with erection of its 8inch dia M.S. Pipe line at Damoda Colliery.
Const. of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set and Deep T/W of 125_115mm Dia, 90mtrs deep Drilled Tube Well for Tola-Kharia Village -Kulamara Panchayat-Matigora Block-Musabani in the Dist.-- East Singhbhum
Dismantling and withdrawal of HT2000GPM Pump, motor set with their baseplate, starter and its pipe line and transporting to safe place due to give free space to the HEMM for OB removal at Old Ghutway Patch-3 of Damoda Colliery.
Consttruction of 08 nos Rural Water Supply Scheme with 1.0 HP DC solar motor pump complete set and 10 house connection with existing source of water, steel structure, HDPE water Tank through the head of 15th finance ZPDP West Singhbhum, Chaibasa
Maint of 300mm 12 inch dia C I pipe line from Lagoon pump house to fresh water pond for Industrial water supply at Madhuban coal Washery under Block II Area BCCL
Brazing of Transformers radiator, cleaning and painting of 02 nos. 11 KV/ 550 V AND 11KV/ 440 V, 1 MVA Transformer in Intake pump house konar river bed under Kathara Colliery
Complete repairing and rewinding of 90HP,415V induction motor ,Make Kirlosker, name plate missing, punch no M08 installed at dam side pump house , in respect of Konar Exp OCP, BnK Area
Construction of Pump House in breeding seed production plot near Rice Section (W Section) and Renovation of Millet Godown near previous Dairy Unit at Faculty of Agriculture under BAU, Kanke, Ranchi
Re-organization of 3.3 KV OH Power line from NTS Barkakana High School to Filter Plant Pump house sub-station and near Gate No 1 and 2 at NTS Colony Barkakana
REPAIRS TO WATER SUPPLY DISTRIBUTION NETWORK FROM PUMP HOUSE TO BLDG NO.P-41,BLDG NO.P-42,BLDG NO.P-45,BLDG NO P-13,BLDG NO. P- 14 AT ARMY CAMP JAMSHEDPUR
Drilling and commissioning of 01 nos bore well all complete fitting along with pump house and laying pipeline near M road marked in plan at Dakaita rehab site under Rajmahal Area.
Drilling and commissioning of 01 nos bore well all complete fitting along with pump house and laying pipeline for connection near plot no.741 at Lohandia rehab site, under Rajmahal Area
Changing and laying of damaged 2 inch and 3 inch dia pipeline of water supply to the crusher from khasmahal colony pump house in respect of konar Exp OCP, BnK Area
Repair/ maintenance of 01 MVA oil cooled transformer 11 KV/ 550 Volts Sl. No. nil WNP, unit no. KTC/1MVA/11KV/550V/01 installed at Konar river pump house Kathara Colliery
Making temporary sand bag check wall across river bed for storage of water including deeping of sump for water supply purpose at ray colliery pump house under Gm Unit Piparwar Area.
DISMANTLING OF 30 NOS 6INCH DIA M.S. PIPE , REMOVING AND TRANSPOROTING FROM GASLITAND KALI MANDIR TO OLD PUMP HOUSE AFTER CUTTING 2.5FIT X 180 MTR TO SALANPUR COLLIERY UNDER KATRA AREA
Construction of 02 nos. Trasformer base (01 no. Mahuatand and 01 no. infront of Aganwadi Kendra) and 01 no. Pump house infront of Badi Pokhar at Basdiha village under Rajmahal Area.
Work of providing and fixing of LED light fittings for better illumination at 48 colony, and pump house, Ashok Vihar, Pratiksha campus and streets in colony under Ashok project, PPR Area.
Repairing and maintenance of quarter no 16/190, Replacement of GI sheet in 35 HP pump house ,providing and fixing of slab in intake well at MTS under Block-II Area
Dismantling /erection of pole with changing of damage stay, pin insulator and conductor of 440 V O/H line from Garhi filter pump house to Intake well under CHP-CPP/PPR.