Loading…
Loading…
13,239 results • Best match
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-18)
Repairing of 6nos of air breaker switch and repair and maintenance of 6point6 KV overhead line to uninterrupted power supply to domestic water supply pump motor set of Jharna face sump and other miscellaneous electrical works of Muraidih section of A
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-27)
Dismantling and diversion cum laying of 8 inch dia M.S. Pipeline of the two nos. of 2000 G.P.M. Pump Motor Sets, in the A Patch in Mine, suppplying water to the Water Tanker Point, w.r.t. Karo OCP, under BnK Area
Construction of 200mm/165mm dia, 290 Mtrs. av. deep HYDT with Soak Pit and Installation of 2PH Electric Motor Pump etc.on turn key basis At Pakur Polytechnic, Pakur for the 2024-25under D.W. and S. Division Pakur. GROUP NO. 01
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-3)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-28)
Dismantling and Re-laying (From diverted root/path). Providing hindrance free dumping area to the outsourcing company B.K.B of 3 rangex850 of 8 diameter pipeline used for dewatering of quarry no.03 and shifting of pump-Motor set with electrical of
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-1)
A)repairing of 3.3KV,400Amps GEC make OCB switch Sl.No.M/541 for controlling of Muraidih CISF Camp (B)complete rewinding and repairing of 11KV,110V PT, 3Phase GEC make for controlling of 4000GPM motor pump at Sadbhavna face of Muraidih, AMPC.
Complete repairing/overhauling of star delta starter 200 HP 550 Volt 150 KW Volga make 3 phase Si. No-FLP 7450 Local Id-Jeal/STR/11 at 2 pit Jealgora surface pump motor controlling at Jealgora Colliery under Lodna Area.
Minor repairing of induction motor of 180KW, 3.3kv , 1485 RPM make Marathon, Sl. no.-F331235-1 and painting of 02 nos. of transformer, 02 nos. of pump-motor with base frame and 04 nos. of breaker of TSOCP under Hazaribagh Area
Retrofitting of rural water supply Scheme with HP DC Solar motor pump complete set and with new Source,Existing Source for PVTG Tola at different blocks,Village of Lohardaga Dist. under Drinking Water and Sanitation Division, Lohardaga (Gr.3 Retro)
Const of Water Supply Scheme with 1 HP DC Solar motor pump complete set and sanitary well for Panchayat- Forest Block, Village- Forest Block Tola- Kolabariya Maredih School tola and Karam Tola Block Gurabandha in the District East Singhbhum GUR_Dr_03
(SVS-01) BConstruction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS.
Transporting a new pontoon set from feeder breaker and installation at main patch sump along with dismantling and transporting of volcan pump motor set from Jarlahi sump to main patch sump and installation on the new pontoon in Phularitand section un
(SVS-08) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-8)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-14)
Assembling, transporting and installation of one 4000GPM Pump motor set in main coal face sump and erection of its delivery from the sump to the SOCP filter plant nalla near CISF check-post for dewatering of mine at Muraidih, AMP Colliery.
Repairing miscellaneous work related to shifting of pump motor set 2000GPM (MnP)/6000GPM (10UPH6) with diversion and extension of delivery range 10in/8in dia MS pipe as per new position at 9 seam patch ABOCP mine under Block-II Area
(SVS-05) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS.
Different type of pumping related work like shifting of pump motor, shifting of box pontoon, its pipeline shifting diversion and extension, fitting of tunker post, replacement of bearing etc. at 1T Deco coal face of ABOCP Mine under Block-2 area
Erection and reorganization of steel tubular poles for a) Lighting purpose in the coal transport road at various location in Tarmi siding b) Platform lighting beside BKB office of Tarmi siding c) Earthing point for 3 Nos water sprinkling pump motor
New making and providing of different size of coupling bolts with lock nuts and washers, SRC bushes and RKB Cooling system complete set for both side bearing housing of 2000, 1000 and 500 GPM pump motor set under AKKOCP, BnK Area
Making of Outdoor type Cable Gland of Motor and Starter and Making of terminal box of 1000 GPM Pump Motor with filling of compound and proper earthing of motors and starters of F-Patch of Amal. NT-ST-JG Colliery
Day to day shifting relocation of pump-motor set and accessories to be installed at different location of mines and repairing of different dia delivery ranges running at patch A area and dismantling of 8 dia pipe from 5 MVA substation
Providing and fixing of 01 (One ) No.Potential Transformer (PT) 3.3kV/110V in HT DOL NFLP Starter 3.3kV, Sl.No. HT 0097 installed with 1000 GPM Pump Motor set installed at Sarna Patch mines for dewatering purpose under Purnadih Project NK Area
Erection/Extension of 01 no. pole at quarry no.04, 02 nos. poles at quarry no.03(north) for feeding power to HT pump motor set and dismantling of 05 nos. poles from old feeder of quarry no.03(south).
Different type of pumping related works like shifting of 04 nos pump motor sets along with diversion and extension of delivery range as per new position, suxtion extension and fitting of tanker post etc at Jamunia patch of ABOPC Mine
Different type of pumping related works like shifting of 03 Nos pump motor set along with diversion and extension of delivery range as per new position, suction extension and fitting of tanker post etc at Jamunia patch of ABOCP Mines
Making of coupling bolt , SRC bush and RKB colleen system complete set and for both side bearing housing and repairing of damaged base platform for 02 nos of 2000 GPM pump motor set in respect of AKK OCP, BnK Area
(SVS-02) Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set AND Deep T/W of 125/115mm Dia,60mtrs deep Drilled Tube Well for Tolas/Village/Areas which is not included in MVS.
Construction of 13 nos water supply scheme with 1 HP DC solar motor pump with existing source of water 2000 LPH steel structure HDPE water tank through the head of 15th finance Zila Parishad chaibasa under DWS Mechanical Division Chaibasa
Shifting of 1000GPM Pump motor set in upper side of Albion OCP sump and 6 inch dia. M.S. Pipe range repairing from Albion OCP to Albion filter plant by replacing of damaged flange and damaged portion of pipes at Damoda Colliery.
(A)Repairing of 6.6KV, 400Amps VCB DOL starter Volga make, Sl.No.HT-145 for controlling of Sadbhawana pump motor of Muraidih,(B) repairing of Battery Bank with charger for two switches of 11KV in Shatabdi sub-station at Muraidih, AMP Colliery
Complete Repairing and Rewinding of Emergency Steering Pump Motor DC 24V, Circuit Wiring and Replacement of LED type Head Light and Back light for BEML Make Dumper BH 50M-I 3506 and BH35-II Water Tanker 1119 at DOCP Kusunda Area
A)REPAIRING AND MODIFICATION OF BED PLATE WITH INSTALLATION OF PUMP MOTOR SET AT KHUDIA RIVER AND 6 INCDIA M.S PIPE LINE INSTALLED FOR WATER SUPPLY OF KUMBHAKAR VILLAGE AND DAHIBARI MAHATO (B) MECHANICAL REPAIRING AND MODIFICATION OF DAMAGED BED PLAT
Supplying and fixing of 01 (One) No.Potential Transformer (PT) 6.6kV/110V in HT DOL NFLP Starter 6.6kV, Sl.No. HT 596 installed with 2000 GPM Pump Motor set installed in Quarry No.-01 mines for dewatering purposeunder Purnadih Project NK Area
Reorientation and diversion cum laying of 8 inch dia M.S. Pipeline of the two nos. of 2000 G.P.M. Pump Motor Sets, in the A Patch in Mine, supplying water to the Water Tanker Point, w.r.t. Karo OCP, under BnK Area.
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-31)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-19)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-17)
Construction of HYDT 200mm X 165mm Dia x 250.00 Mtrs deep bore well with 1.0 HP DC Solar motor pump complete set and Square Tube Steel Structure and HDPE Water Tank 6.00 mtr Staging Capacity-2000 Ltr. for Tola Lukayatand
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-25)
Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set for Block-Kuchai, Panchayat-Gomiadih and Baruhatu, Village-Karerango and Baruhatu which is not included in MVS and has no electricity or less electricity to suppl
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-22)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-26)
Const. of Solar Motor Pump Based MWSS in PvTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No. 2 Dumka for the year 2024-25. (JJM) (Group No. PVTG-4)
Const of Solar Motor Pump based MWSS in PVTG village having no drinking water facilities in Dumka District under PM-JANMAN Yojna under D.W and S. Division No 2 Dumka for the year 2024-25 JJM Group No PVTG-10