Loading…
Loading…
5,349 results • Best match
Providing Irrigation Facility by Drilling Borewell , Supplying and Errection of Pumps, Motars to Land of 1) Nagesh.C.K s/o Late Kempaiah of Chinaga village Kora Hobli Tumkur Taluk 2) Ramakrishnaiah s/o siddappa of Allalasandra village, Kolala Hobli, Koratagere Taluk 3) Lakshmamma w/o Anjinappa of Devalapura village,Kora Hobli Tumkur Taluk 4) Hanumakka w/o Late Mudlappa of Sunkadahalli village, Kolala Hobli, Koratagere Taluk 5) Bharathi w/o Paramesh of Chikkatotlukere village, Kora hobli, 6. Nagarajaiah s/o Siddalingaiah, Alalasandra village, Kolala hobli, of Koratagere Taluk
Volleyballs, Football, Volleyball Net, Measuring Tape, Air pump, Handball
GA31072-COMPLETE CARTRIDGE ASSY., GA31072A/B BARE SHAFT PUMP
Set of Items Consisting of 09 Items for forklift trucks : 1) Radiator Cradle Type - MH02525585 - Qty - 04 Numbers 2) Radiator Cap - 02011965 - Qty - 20 Numbers 3) Fan belt - MH02361828 - Qty - 15 Numbers 4) Hose Engine to Radiator - MH02006899 - Qty ... to Pump - ... Water pump Assembly ...
1000023420, 1000046619, 1000046700, 1000046701, 1000184109, 1000184110, 1000184111, 1000184112, 1000184113, 1000184114, 1000184115, 1000184116
1000116965, 1000092931, 1000073586, 1000073590, 1000073592
Supply, installation, testing, commissioning, replacement and retrofitting of 10 Nos. 150HP/110 kW, 415 V, 3 phase, 50Hz fully automatic soft starter units for cooling water pump with over current, short circuit, phase loss, phase reversal, locked ... water pump soft ... water pump motors ...
REPAIRS REPLACEMENT MAINTENANCE TO DI GI CI PIPE LINES FITTINGS SERVICING OF WATER LEVEL INDICATORS GAUGES PUMP AND MOTOR SERVICING UG OH TANK SERVICING CLEANING AND CONNECTED WORKS AT PHASE II PHASE III CASDIC AND RTC UNDER GE I RD EAST BANGALOR
C/o 100 bedded ESIC hospital 32nos. residential quarters (type-II 16nos. Type-III 8 nos, Type-IV 2nos.) & Ancillary structure (canteen building... wet riser pump room) SH: Pdg labour service for office assistant at O/o The AE(E), CPWD, Shivamogga
Drilling of new Borewell and Installation Pawer Pump and Moter for water supply at ward no-16 Laxmi nagar 1 st Cross near Balikai Teacher home and ward -20 Basaveshwar nagar New bus stand back side (IMA Hall) in Laxmeshwar Town Limit
Work to repair the cubicle structure in the yard of the electrical transformers located in Marigadde, Addalli, Amanagudda, KHB Colony and Kendre Pump Houses of the Water Supply Department and construct sheds for the protection of the said electrical transformers from rainwater.
Providing Sewer network to Ashraya colony and construction of wetwell & rising main to pump sewage from wetwell to rising main infront of temple in ward No.31 Basthipura & ward no 10 in Kollegala city under TSP 2025-26. (Lumpsum Tender- No variation).
Providing and installation of Change over switch at Jack well and NR Valve for 350HP pump at WTP and Improvement of water supply line by removing old DI pipes and install MS pipes in Virupapura Thanda Sewalal Circle in CMC limits Gangavathi
Manning Operation and Maintenance of Substations, Pump houses, Jack wells in Stage-1 Halasabalu, Stage-2 Mallashettihalli & Haluvarthi and Monitoring of Raising / Gravity Pipelines up to Terminal Tanks in Rajanahalli Lift Irrigation Scheme in Davanagere Dist. under KNNL for the year 2024-25.
Improvement work of installing of dredging pump, Multi raked coarse bar screen, installation of Macerators and Solar panels and implementation of CMSS software at 20 MLD Doddabele UWTP under JHA funds coming under AEE(WWM-STP)V.V-1 sub Division(3rd Call)
Manning Operation and Maintenance of Substations, Pump houses, Jack wells in Stage-1 Halasabalu, Stage-2 Mallashettihalli & Haluvarthi and Monitoring of Raising / Gravity Pipelines up to Terminal Tanks in Rajanahalli Lift Irrigation Scheme in Davanagere Dist. under KNNL for the year 2025-26
Replacement of 300 mm & 200 mm MS Pipes in the Filter Bed Pipe Gallery of the Phase-II Water Treatment Plant and Repair of the 60 HP Clarifier Motor (No. 1) and 75 HP Pump at the Phase-I Water Treatment Plant
Oil Pump with Motor for Converter for WAP-7 & WAG-9 (3-Phase) Class of Locomotives. As per CLW's Specn No. CLW/ES/3/0107 Alt. G and RDSO Specn. No. RDSO/SPEC/E-10/3/09 (motor) with Amendment No. 1, 2,
Oil Pump with Motor for converter for WAP-7 & WAG-9 (3-Phase) class of Locomotives. As per CLW's Specn No. CLW/ES/3/0107 Alt. G and RDSO Spec. No. RDSO/SPEC/E-10/3/09 (Motor) with amendment No. 1,
OIL PUMP WITH MOTOR FOR TRANSFORMER FOR WAP-7 & WAG-9 (3-PHASE) CLASS OF LOCOMOTIVES. AS PER CLW'S SPECN. CLW/ES/3/0106 ALT.- F AND RDSO SPECN. RDSO/SPEC/E-10/3/09 ( MOTOR ) WITH AMENDMENT NO. 1, 2, 3
OIL PUMP WITH MOTOR FOR CONVERTER FOR WAP-7 & WAG-9 (3-PHASE) CLASS OF LOCOMOTIVES. AS PER CLW's SPECN. No. CLW/ES/3/0107 ALT.-G and RDSO Spec. No. RDSO/SPEC/E-10/3/09 (Motor) with amendment No. 1, 2,
Oil pump with Motor (MPH) to CLW Specn. No. CLW/ES/0-1/L and to CLW Drg No. CLW/ES/SK-1/0-L. Note; 1.Item is reserved for IREPS Vendor directory sources. Pl Follow IREPS Vendor Directory CLW Item I
HYDRAULIC PISTON PUMP TO M/s DANFOSS PART No. PVB5-RSY-21-CC-11-IN 154 (EARLIER VICKERS PART NO:PVB5-RSY-21-CC-11-IN 154 ) OF MAKE: DANFOSS ONLY FOR STATION-1/CNC 'B' SHOP AND SEMA MACHINE A SHOP USE
Supply of type-A & type-B Fan Cover for 0.5 HP Self Priming Mono Block Pump for Water Raising Purpose in LHB Non-AC Coaches. Detail of the quantity to be supplied for type-A & type-B fan cover is as p
Oil Pump with Motor for Transformer for WAP-7 & WAG-9(3 Phase) class of locomotives. As per CLW's Specn. CLW/ES/3/0106/E Alt.-F and RDSO Specn. RDSO/SPEC/E-10/3/09 (Motor) with Amendment No. 1, 2, 3,
Custom Bid for Services - MRPL tender No 3900000850 ARC for Supply of driver cum Pump Operator for Fire Tenders Gully Sucker as per BOQ and in GEM overall lump sum rate to be quoted considering 1 service item excluding GST as per BOQ
Engine mounting front, Engine mounting rear, Old mounting removing and new mounting fitting and testing labour charge, Rotary pump repair and service with parts, Nozzle, Cam plate, TD Piston, Service kit, Tappet roller, Pump stripping service above ... and pump assembled ... Rotary pump removing ... and pump and ... Tensioner, Pump removing ... service pump fitting ... Fuel pump motor , ... Oil pump assembling ... Front pump assembly, ...
Wiper motor pipe, Steering horse pipe, Door lock, Gear box top repair and service with shaft and packing with lathe machine work, Above metioned parts removing the vehcile and after service fitting the veh and veh testing labour charge, Dor lock, ... lifting pump repair ... Rotary pump problem ... Rotary pump removing ... the pump house and ... parts., Pump full ... and pump assembled ... rotary pump removing ... Lifting Pump Repair ... Rotary Pump not ... rotary pump removing ... and pump stripping, ... Positioner, Pump repair ... Lifting Pump , ... rotary pump removing. ... rotary pump
Rotary vane, oil sealed direct driven vacuum pump of airflow 750-1000 lpm, Rotary vane, oil sealed direct driven vacuum pump of airflow 300-500 lpm
PRE FILTER CANDLE, PRE FILTER ASSEMBLY (20 INCH), RO PUMP
44524555-WATER CIRCULATING PUMPKDS1040+ +, WATER CIRCULATING PUMP MODEL KDS 844+ +
OPEN SPACE USED FOR SHOPPING COMPLEX, GODOWN, SUPERMARKET, HOSPITAL, CHARGING STATION, PETROL/DIESEL PUMP, SHOWROOM, BANK, OFFICES, GARAGE, SOLAR PANEL AND OTHER LEGAL BUSINESSES FOR A PERIOD OF TEN YEARS AT NARAGUND BUS STATION SPACE(1000 Sq Ft OPEN SPACE) ELF RS.47,000-00
Sinking of borewell at ward no 03 and 05 Insttalation of pumping machinary of kakkera tmc limitSinking of borewell and fixing of hand pump at ward no 01 and Drilling of borewell at ward no 08 and Insttalation of pumping machinary of kakkera tmc limit .
OPEN SPACE USED FOR SHOPPING COMPLEX, GODOWN, SUPERMARKET, HOSPITAL, CHARGING STATION, PETROL/DIESEL PUMP, SHOWROOM, BANK, OFFICES, GARAGE, SOLAR PANEL AND OTHER LEGAL BUSINESSES FOR A PERIOD OF TEN YEARS AT NAREGAL BUS STATION SPACE(1000 Sq Ft OPEN SPACE) ELF RS.34,500-00
OPEN SPACE USED FOR SHOPPING COMPLEX, GODOWN, SUPERMARKET, HOSPITAL, CHARGING STATION, PETROL/DIESEL PUMP, SHOWROOM, BANK, OFFICES, GARAGE, SOLAR PANEL AND OTHER LEGAL BUSINESSES FOR A PERIOD OF TEN YEARS AT GAJENDRAGAD BUS STATION SPACE(1000 Sq Ft OPEN SPACE) ELF RS.45,300-00
SET OF 'O' RING KIT FOR FLOW WELL BRAND OIL PUMP SUITABLE FOR MODEL NO.115,1.5 HP SINGLE PHASE CONSISTING OF 3 ITEMS. (1) `O' RING SIZE ID 195mm x 5mm DIA -1 NO.,(2) 'O' RING SIZE ID 38mm x 3mm DIA-1
Oil Pump with Motor for converter for WAP-7 & WAG-9 (3-Phase) class of Locomotives. As p er CLW's Specn No. CLW/ES/3/0107 Alt. G and RDSO Spec. No. RDSO/SPEC/E-10/3/09 (Motor) with amendment No. 1, 2,
Set of Gasket and O ring for M/s Flow well make transformer oil pump model 1575 for 3 phase locomotives. Set consist of 1) Teflon Gasket of size OD: 233 mm x ID: 224 mm x 4mm - 02 Nos. 2) Nitrile O ri
SET OF 'O' RING FOR M/S.FLOWTECH MAKE CONVERTER OIL PUMP OF MODEL NO.-1575 OF 3 PHASE LOCO, SET CONSISTS OF 2 ITEMS AS GIVEN BELOW: 1) TEFLON 'O' RING OF OD 233 x ID 224 x 4 MM - 02 NOS/SET 2) NITRILE
SET OF 'O' RING FOR M/S.FLOWTECH MAKE CONVERTER OIL PUMP OF MODEL NO.-1575 OF 3 - PHASE LOCO,SET CONSISTS OF 2 ITEMS (i) TEFLON 'O' RING OF OD 233 x ID 224 x 4 MM= 02 NOS.(ii) NITRITE 'O' RING OF O
Set of "O" Ring for M/s Flowtech make Transformer Oil pump of model no. 1575 of 3 phase loco. One set consists of 2 items (i) Teflon "O" ring of OD 233 x ID 224 x 4 mm = 02 Nos. (ii) Nitrile "O" ring
Set of 'O' Ring for M/s. Flowtech make Converter Oil Pump of Model No.- 1575 of 3-phase Loco, set consists of 2 items--- (i) Teflon 'O' Ring of OD 233 x ID 224 x 4mm= 02 Nos. (ii) Nitrite 'O' Ring of
Set of 'O' Ring for Flowtech Make Oil Pump (MPH). Each Set consists of 04 items: - (1) 'O' Ring Size ID 195 mm x 5 mm dia, Part No. - 210227U = 01 No. (2) 'O' Ring Size ID 38 mm x 3 mm dia, Part No. -
SET OF 'O'RING KIT FOR FLOW WELL BRAND OIL PUMP SUITABLE FOR MODEL NO.115,1.5 HP SINGLE PHASE CONSISTING OF 3 ITEMS. (1) `O' RING SIZE ID 195mm x 5mm DIA -I NO.,(2) 'O' RING SIZE ID 38mm x 3mm DIA-1 N
SET OF 'O' RING FOR M/S.FLOWTECH MAKE CONVERTER OIL PUMP OF MODEL NO.-1575 OF 3 PHASE LOCO, SET CONSISTS OF 2 ITEMS AS GIVEN BELOW: 1) TEFLON 'O' RING OF OD 233 x ID 224 x 4 MM - 02 NOS/SET 2) NITR
SET OF 'O'RING KIT FOR FLOW WELL BRAND OIL PUMP SUITABLE FOR MODEL NO.115,1.5 HP SINGLE PHASE CONSISTING OF 3 ITEMS. (1) `O' RING SIZE ID 195mm x 5mm DIA -1 NO.,(2) 'O' RING SIZE ID 38mm x 3mm DIA-1 N
SET OF 'O' RING FOR M/S.FLOWTECH MAKE CONVERTER OIL PUMP OF MODEL NO.-1575 OF 3 PHASE LOCO, SET CONSISTS OF 2 ITEMS AS GIVEN BELOW: 1) TEFLON 'O' RING OF OD 233 x ID 224 x 4 MM -02 NOS/SET 2) NITRIL
SET OF 'O'RING KIT FOR FLOW WELL BRAND OIL PUMP SUITABLE FOR MODEL NO.115,1.5 HP SINGLE PHASE CONSISTING OF 3 ITEMS. (1) `O' RING SIZE ID 195mm x 5mm DIA -I NO.,(2) 'O' RING SIZE ID 38mm x 3mm DIA-1 N
Set of "O" Ring for M/s Flowtech make Transformer Oil pump of model no. 1575 of 3 phase loco. One set consists of 2 items (i) Teflon "O" ring of OD 233 x ID 224 x 4 mm = 02 Nos. (ii) Nitrile "O" ring
SELF PRIMING MONO BLOCK PUMP, 0.5 HP/0.37 KW, 415 V AC, 50 HZ, 3 PHASE WITH T.O.P. (C1 & C2), SUITABLE FOR WATER RAISING IN LHB COACHES AS PER RCF SPEC NO: EDTS-186 REV-A,AM-2,CORR-2 OR LATEST AND RDS