Loading…
Loading…
14,279 results • Best match
Waterproofing on the Roof Top and coloring, Painting work at Banganga sewage pump house Bhopal
Agriculture college murjhad Farm me Pump House and Store Room ka nirman karya Block Waraseoni
Rigid pavement work at Idgah filter Plant Sultaniya Infinity Pump house Under Zone No.02
MOEI and FANs i/c street light and RMO Pump set for residential colony for GOAW Neemuch SH: SITC of Cassate AC, Street Light, Flood Light, bollard light, replacement of existing fans and fittings, laying of cable, replacement of MCCB of Existing pane etc in GOEW campus Neemuch Subwork/Packages: SITC of Cassate AC Street light flood light bollard light replacement of existing fans and fittings laying of cables replacement of MCCB of existing panel etc
Providing and Installation of Hydraulic pumps, jacks etc. for operation of hydraulic gates of Katni river barrage as per estimate
10-M3100990225-PUMP, ESP: SUB D/W P/P, 10HP, 78 M3/HR, 22M (Q3), 20-M3100990228-PUMP, 15HP, 50M3/HR, 50M (Q3), 40-M3100990227-PUMP, 25HP, 50M3/HR (Q3)
Hand Pump Maintenance in Block Amarpatan
Backpullout Asm. Screw Pump ANBP 12.2, Backpullout Asm. Screw Pump ANBP 6.2, Backpullout Asm. Screw Pump AEB 1E 50
Job contract for maintenance of TG Aux. Area Pumps, TDBFP Drive Turbine,CEP, PHE, centrifuges, etc of Stage-II, III, IV,V units(7x500MW) of NTPC Vindhyachal
Unbranded FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, Unbranded FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
Unbranded FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, Unbranded FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
Unbranded FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, Unbranded FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
SUDERSHAN FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, SUDERSHAN FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
Unbranded FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, Unbranded FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Hanumana(B) Distt. Rewa (M.P.)
As per the requirement of council time to time repair of motors, pumps, starters with necessary material/parts
Running Maintenance of TG and its Auxiliaries for Turbine Side Pumps Unit 10 and 11 STPS, MPPGCL, SARNI.
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Teonthar-A, Distt. Rewa (M.P.)
Unbranded FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, Unbranded FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
Unbranded FIG. 3.6 VALVE ASSEMBLIES - SDWP Deepwell Hand, Unbranded FIG. 3.6 VALVE ASSEMBLIES — SDWP Deepwell Hand Pumps Components
As per the requirement of council time to time repair of motors, pumps, starters with necessary material/parts
Maintenance of pumps and repairing of pipe lines installed at Amlohri Mine for the period of 01 year.
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Teonthar(A) Distt. Rewa (M.P.)
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Hanumana-A, Distt. Rewa (M.P.)
Day to day installation and shifting of HT/LT pumps and their related accessories of Block-B Project
Pulling of dropped lines of Power pumps, Hand Pums and cleaning of bores Ward No 01 to 45
OPERATION AND CONTROLLING OF VALVES/PUMPS AT THREE PLACES FOR 24 HOURS AT NIGAHI PROJECT FOR 730 DAYS.
Drilling of tubewell and Providing and installing of single phase motor pumps at Ward No 4 Dev Nagar.
SHIFTING OF HT PUMPS and LAYING OF PIPE LINE IN RESPECT OF RAJENDRA UG MINE OF SOHAGPUR AREA
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Naigarhi (B), Distt. Rewa (M.P.)
procurement of spares for dust suppersion ,spray water pumps Make Kirloskar installed at CHP-210 MW, ATPS, Chachai.
Procurement of Coal Mill Lube Oil Pumps (Make - Allweiler) for Boiler Maintennce Department -II 2x660MW, SSTPP,MPPGCL, Dongalia
Procurement of Spares for Tushaco make Lube Oil Pumps for TDBFPs of 2X600 MW at SSTPP, MPPGCL, Dongalia
Conclusion of Rate Contract for Supply of Spares of Wilo Mather and Platt make Pumps for 02 years
Procurement of Spares for Dump Ash System Ash Disposal Pumps Model 4HD404 40HP for AHP I SGTPS Birsinghpur
Pulling of dropped lines of Power pumps, Hand pums and cleaning of bores Ward No 01 to 45
O and M of Recycling Pumps installed nearby discharge of 111 Hect. Ash dam(Triple storey) STPS, Sarni
Operation and Maintenance ( Dewatering Gallery Motor Pumps ) Staff For Lower Goi Project (Shaheed Bhima Nayak Sagar Priyojna) Barwani
Repairing of 02 Nos. Hydraulic variable flow Pumps of Plough Feeders of Phase-I CHP at NIGAHI PROJECT.
Pulling of dropped lines of Power pumps, Hand pums and cleaning of bores Ward No 01 to 45
Pulling of dropped lines of Power pumps, Hand Pums and cleaning of bores Ward No 01 to 45
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Teonthar(B) Distt. Rewa (M.P.)
Pulling of dropped lines of hand pumps and cleaning of bores Ward No 01 to 45 (Vth Call)
Repairing of 03Nos. Main Hydraulic pumps (Part No-Z5421) for 05Nos. REL-650D model Drills of Amlohri Project
Repairing and Maintenance of Pumps used for water supply in Nigahi Colony for 2 years at Nigahi Township
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Naigarhi (A), Distt. Rewa (M.P.)
As per the requirement of council time to time repair of motors, pumps, starters with necessary material/parts
Repairing and Maintenance and chlorination as per Hand pumps installed villages in block Mauganj (B), Distt. Rewa (M.P.)
Assistance for repairing of different pumps in EandM workshop at Nigahi Project during monsoon 2022 for 180 days
Lowering, lifting and Repair of pumps as and when required during breakdowns under G.M. unit of Kanhan Area