Loading…
Loading…
14,281 results • Best match
Lowering, lifting and Repair of pumps as and when required during breakdowns under G.M. unit of Kanhan Area
Pulling of dropped lines of Power pumps, Hand pums and cleaning of bores Ward No 01 to 45
Installation of 15 Nos. hand pumps in different village of singrauli distt. Under CSR scheme of Jayant Project
ISI MARKED HAND PUMPS AS PER IS 15500 2021 (Part 1 to 8) (with up to date amendment)
Pulling of dropped lines of Power pumps, Hand Pums and cleaning of bores Ward No 01 to 45
Procurement of spare parts of SAM make Sump Pumps for 2x600 MW, PH 1,CHP, SSTPP, MPPGCL, Dongalia
Procurement of Thordon Bearing for WPIL make RWIS and CW Pumps at 2x600 MW at SSTPP, MPPGCL, Dongalia
Procurement of spares for Del Pd rotary Pumps Model RDRN150 of AHP of 1X500 Unit, SGTPS, MPPGCL, Birsinghpur
Procurement of spares of HFO Unloading Pumps Make Roto Make for PHI and II at SGTPS, MPPGCL, Birsinghpur.
Custom Bid for Services - ANNUAL MAINTENANCE CONTRACT FOR DIESEL ENGINES OF FIRE WATER PUMPS AT BPCL BINA REFINERY
Horizontal Single Stage Centrifugal Pump (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6798611 Dated : 16-10-2025 Bid Document 1/11 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
PUMP ASSY, SAM TURBO, 3MD 80/205 D
crompton Centrifugal Self Priming Mono block Pump, crompton Centrifugal Self Priming Mono block Pump
kIRLOSKER Centrifugal Self Priming Mono block Pump, kIRLOSKER Centrifugal Self Priming Mono block Pump
Unbranded Centrifugal Self Priming Mono block Pump, Unbranded Centrifugal Self Priming Mono block Pump
crompton Centrifugal Self Priming Mono block Pump, crompton Centrifugal Self Priming Mono block Pump
Avichal Centrifugal Self Priming Mono block Pump, Avichal Centrifugal Self Priming Mono block Pump
Unbranded Centrifugal Self Priming Mono block Pump, Unbranded Centrifugal Self Priming Mono block Pump
crompton Centrifugal Self Priming Mono block Pump, crompton Centrifugal Self Priming Mono block Pump
Avichal Centrifugal Self Priming Mono block Pump, Avichal Centrifugal Self Priming Mono block Pump
Unbranded Centrifugal Self Priming Mono block Pump, Unbranded Centrifugal Self Priming Mono block Pump
crompton Centrifugal Self Priming Mono block Pump, crompton Centrifugal Self Priming Mono block Pump
Unbranded Centrifugal Self Priming Mono block Pump, Unbranded Centrifugal Self Priming Mono block Pump
Supply of Hand pump Essentials and Repairing of hand pump for FY 2020-21
SUPPLY OF HAND PUMP SPARE AND T and P FOR MAINTANANCE OF HAND PUMP
Procurement of Pump parts for Kirloskar make SCT150 48 2 Pump at Nigahi Project.
SUPPLY & INSTALLATION OF AW - 35 PUMP, AIR DRIVEN LIQUID PUMP, RATIO - 35:1, MAX.
Estimate for 11 KV line interconnection Rai S/s to Ramrai Pump feeder under Kolaras R D/c under OnM Dn. II Shivpuri.(249158) (NIT-22)
AXIAL PISTON PUMP, MODEL: PVM074ER09GS02AAC28110000A0A, MAKE: VICKERS BY DANFOSS, VANE PUMP, MODEL: 20V14 A 1A 22R, MAKE: VICKERS BY DANFOSS, VANE PUMP, MODEL: V10 1 B4B 1A 20, MAKE: VICKERS BY DANFOSS, VANE PUMP, MODEL: V210 8W 1C 12 S214 INB, MAKE: VICKERS BY DANFOSS
Providing 3 HP / 5 HP solar water pumps (05 Nos.), including all the materials required for installation in 05 Nos. Villages (Piproli, Devari (Lawan), Kamanpura, Shri ka pura, Gyanendra ka pura) in Block Mehgaon in District Bhind with providing maint
Providing 3 HP / 5 HP solar water pumps (04 Nos.), including all the materials required for installation in 04 Nos. Villages (Kaakran ka pura, Surajpura, Arjunpura, Jawai) in Block Ater and Bhind in District Bhind with providing maintenance for five
Providing 3 HP / 5 HP solar water pumps (07 Nos.), including all the materials required for installation in 07 Nos. Villages (Andhiyari No. 1, Jaswantpura, Katghara mafi, Sijaripura, Larsa, Sijroli, Tighra khurd) in Block Raun and Lahar in District B
11 KV line 11 KV DP
Item Rate Supply Solar pump
Retrofitting Preparation of Piped Water Supply Scheme under Jal Jeevan Mission at Village JALALGARGH Block SABALGARGH Distt MORENA construction of 100 KL RCC Sump well cum Pump House laying jointing Pump House of rising main and distribution
Tender for Replacement of Existing pipeline with DI pipeline by Providing Laying Jointing and testing commissioning of DI Pipes between Chittora Pump House and Barthuma Pump House of MES and Depositing Old Pipes at Stores of MES
Procurement of Spares of Ash Pump, Recovery Water Pump and bottom ash overflow pump of ash handling system of 210 MW ATPS, MPPGCL, Chachai.
Procurement of spares for fire Hydrant Booster Pump and Pump shaft of hydrant pump of TMD Off site at 2x660 MW, SSTPP,MPPGCL,Dongalia.
Repair work of 75 HP vertical turbine pump set, NRV valves, Sluice gate of bardha lift irrigation scheme in Kesla
Providing Assistance for Routine operation activities, related work and Round the clock/Daily cleaning of Conveyor No. 12, Secondary Coal Crusher A, B, C and Tail end area of Conveyor No. 6A/B, 13 and Dewatering pumps, Cooling Water Pumps A, B, C
Custom Bid for Services - Assistance required for operation of pumps and minor repairing Maintenance of pumps in the back shifts IInd and IIIrd shifts of Kanchan OCM Nowroza bad Sub Area for 313 working days Similar Category Facility Management Services - LumpSum Based
Installation of 100 Nos Single Phase Submersible Pumpset including Transportation , Lowering , Electric connection complete in all respect onTubewells at different villages of block Mauganj and Hanumana District Rewa (M.P.)
Installation of 100 Nos Single Phase Submersible Pumpset including Transportation , Lowering , Electric connection complete in all respect onTubewells at different villages of block Teonthar and Naigarhi District-Rewa (M.P.)
PURCHASE OF SOLAR WATER PUMP SOLER WATER PUMP SYSTEM AS PER SPECIFICATION. (2 nos-)
For Supply and Installation of 3 HP 3 Phase Mono block Pump/Submersible Pump in H Block Girls Hostel, G Block Girls Hostel, SBI ATM, A Block Hostel at GMC Bhopal.
Proposal of interconnection of 11 KV Sarkheda pump feeder and 11 kv Panbihar pump feeder with 11 KV Rawankheda pump feeder under SSTD Scheme to reduce the peak load of 11 kv Sarkheda pump feeder and 11 kv Panbihar pump under shyampur D/c
100273748 10 M3100990308 PUMP, ESP: SLRY, 10HP, 1450RPM, 50M3H@10MWC, 100273748 20 M3100040116 PUMP, ESP: SLURRY, 155M3/HR, 35M, 100272617 10 M3100990284 PUMP, ESP: SUBMERSIBLE SLURRY, 15HP, 1
Custom Bid for Services - Supply installation commissioning testing of 2 Tonne split Air Conditioner 5 star Make LG Voltas Samsung, Custom Bid for Services - Supply installation commissioning testing of RO Water Purifier Wall mountable RO UV UF ... HP Submersible motor pump ISI ... for submersible motor pump of ...
moter pump reparing work
Hand Pump MaintenenceSper Parts