Loading…
Loading…
7,038 results • Best match
HAND PUMP CABIN LIFTING PUMP, FUEL FEED PUMP, HYDRAULIC AGGREGATE, VOLTAGE REGULATOR, ELECTRIC VALVE, HYDRAULIC CYLINDER
Construction of Pump Chamber Installation of Pumping Machinery CI Fitting inside Pump Chamber Disinfection Unit etc complete in all respect for Water Supply Scheme Makran, Block Kharar, Distt. SAS Nagar
Construction of Pump Chamber Installation of Pumping Machinery CI Fitting inside Pump Chamber Disinfection Unit etc complete in all respect for Water Supply Scheme Rangian, Block Kharar, Distt. SAS Nagar
Construction of Pump Chamber Installation of Pumping Machinery CI Fitting inside Pump Chamber Disinfection Unit etc complete in all respect for Water Supply Scheme Pandwala, Block Derabassi, Distt. SAS Nagar
Construction of Pump Chamber Installation of Pumping Machinery CI Fitting inside Pump Chamber Disinfection Unit etc complete in all respect for Water Supply Scheme Tripri, Block Kharar, Distt. SAS Nagar
Replacement of Existing HSDMSWGHSD Loading Pumps, Addition of MS Loading Pump 1 No, Replacement of MS Loading Header to TLF, Pipe Culverts, Supports and Allied Jobs at IOCL Sangrur Terminal, Sangrur, Punjab Under IOCL Punjab St
Main Shaft, Fuel Pump Motor, Oil Pressure Pipe, Nozzle, Pressure plate, Thermostat Valve, Protection Valve Assy
HANDLE DOOR OUTSIDE LH, TANK ASSY FUEL, WEATHER STRIP WIND SHIELD, DRIVE ASSY, FUEL PUMP MOTOR
Tender for repair 3 no motor pumpset twell janauri3,Kaillo and Neela Naloya of Block Bhunga Dist Hoshiarpur Under LF Division Hoshiarpur
Repair to diesel engine 32 BHP installed at Pump House No 1 Karelunalah (Stage No 1), Pump House No 2 Lakermandi (Stage No 2) and Pump House No 3 Choutha Mod (Stage No 3) Held with AGE (AF) Dalhousie under GE (AF) Pathankot
Providing and laying of 100 mm sewer line from pump house no. 02 to STP Maintenance of existing sewer pump house)at GC CRPF JALANDHAR PUNJAB.
BARE PUMP ASSEMBLY FOR FIRE WATER PUMP
PVC Insulated Cables for Submersible Pumps - as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6784519 Dated : 14-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 22050 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/NR/FZR EMD shall be in favor of “Sr.DFM NR FZR DRM office Firozpur 152001.” and to be deposited only in the office of “Sr. DMM, Stores Department, Northern Railways, DRM Office, Firozpur 152001”. EMD to be deposited before due date and time of the closing of bid, failing which offer shall be summarily rejected. (Sr.dfm/nr/fzr)
REPAIR/REPLACEMENT OF WATER SUPPLY PUMPS AND CONNECTED ITEMS AT OLD AMRITSAR CANTT
Supply of submersible motors and cables for water supply pumps of MC Kapurthala
Const. of Chambers for water supply pumps in ward no 9,13,17,37 and 38 .
EXTRACTION AND LOWERING OF MOTOR PUMPS UNDER GURDASPUR AND MADHOPUR PWRMDC DIVISION PATHANKOT
Construction of Pump Chamber, Installation of Pumping Machinery, C.I. fitting inside Pump Chamber, Disinfection Unit, Chlorination Plant, Rising Main etc. complete in all respect for Water Supply Scheme at Village Pandwala
Const of SandS Tank, Clear Water Suction Well, Raw Water Suction Well, P/L DI D/F Pipe, Const of Boundary wall, P/F Pumping Machinery, Repair of Clear Water Tank, P/L of Interlocking Tiles and Const of Toilet Block at Gidderbaha. ( AS PER DNIT)
UPGARDATION OF COOK HOUSE AT BLDG NO. P-335 OF 121 FD WKSP COY,PROVN OF GREEN FIBRE SHEET AROUND BALCONY OF MD ACCM BLDG NO. P-536,528,520,519, 518,517, 516,515,514 AND PROVN OF PIPELINE FROM PUMP HOUSE NO.2 TO FILTERATION PLANT AT MIL STNFAZILKA
Self Priming Centrifugal Pump as per IS 5120 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6482068 Dated : 23-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 26 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : N.A. Semiconductor Laboratory, Ministry of Electronics and Information Technology Sector 72, S.A.S Nagar Punjab 160071. (N.a.) Splitting
Construction of Pump Chamber, Installation of Pumping Machinery, C.I. fitting inside Pump Chamber, Disinfection Unit, Chlorination Plant, Rising Main, etc. for Water Supply Scheme at Village Behra, Block Derabassi, District SAS Nagar
CONVERSION OF TANK NO-11 ( 28 M DIA, 15 M HEIGHT) FROM MS SERVICE TO ETHANOL SERVICE, PIPING MODIFICATION, CONSTRUCTION OF ETHANOL LOADING FACILITIES INCLUDING PUMP HOUSE, PUMPS, PUMP MANIFOLD, PIPING JOBS AND ALLIED WORKS AT SANGRUR TERMINAL, SANGRU
Tubewell, OHSR, Pumping Machinery, Pipeline and all other works as per DNIT
Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12, Title13, Title14, Title15, Title16, Title17
Diaphragms for pump, Sandwich sheet pump
PUMP CARTRIDGE 1, PUMP CARTRIDGE 2
Supply and fixing of hand pumps in different parts of the city (3rd invitation)
Providing and fixing of 13 Dozer sets for Water Supply Pumps of MC Kapurthala
Purchase Of submersible Motors And Accessories For Water Supply Pumps Of Municipal Council Kartarpur.
REPAIR /MAINTENANCE OF NON CLOG SUBMERSSIBLE PUMPS AND CONNECTED ITEMS AT OLD AMRITSAR CANTT
REPAIR / MAINTENANCE OF NON CLOG SUBMERSSIBLE PUMPS AND CONNECTED ITEMS UNDER GE AMRITSAR CANTT
of Boiler Feed pumps, Condensate Extraction Pumps, CW Pumps, Vacuum Pumps, Turbine Aux. Cooling Water Pumps, BACW Pumps, Boiler fill Pumps, Hotwell Make Up Pumps, Stator water make up pump of GHTP lehra mohabbat stage 1 and 2 on lump sum basis
Augmentation of Water Supply Scheme for Village Behlolpur Block Majri, Distt. SAS Nagar. Construction of Pump Chamber , Installation of Pumping Machinery, C.I. Fitting inside Pump Chamber, Disinfection Unit, Chlorination Plant, Rising Main etc.
Augmentation of Water Supply Scheme for Village Malikpur Block Derabassi, Distt. SAS Nagar. Repair of existing Pump Chamber, Installation of Pumping Machinery, C.I. Fitting inside Pump Chamber, Disinfection Unit, Chlorination Plant, Rising Main,
Construction of Pump Chamber, Installation of Pumping Machinery, C.I. fitting inside Pump Chamber, Disinfection Unit, Chlorination Plant, Rising Main, Development of WWs site Distribution System complete in all respect for WSS Jujhar Nagar
Augmentation of Water Supply Scheme for Village Guhra Block Majri, Distt. SAS Nagar. Construction of Pump Chamber Installation of Pumping Machinery CI Fitting inside Pump Chamber Disinfection Unit etc complete in all respect
Pump Strg ZF, Assy Tapper Roll Brg, Pump Element, Nozzle, Cab Tilt pump
Construction of Pump Chamber Pump No. 2,3,11 MC Kapurthala.
op Shaft with key for Ammonia Transfer Pumps, Centering sleeve with locking nut, Silicon Rubber O-Ring 32 MM, Silicon Rubber O-Ring 47 MM
Fuel Pump Motor, Mounting Engine FRT, Drive Assy, Brake Booster Kit, Bush Carrier Assy, Alternator Pulley, Fan Belt
Borewell, Submersible Pump, PVC Pipe Casing, Throw Pipe, Starter Switch, Electric Wire, Panel, Power Supply BOQ Title BOQ BOQ1
Prov. and Fixing SS 200mm, 350mm NRV Incl. Class 150,300 Flanges, Champ Rubber Join, Etc. Compt. In All Respt, Rep. of Air vessel Chamber, Provid. NP2 Pipe Drain In Nard Massewal Pump House For Commis Lift Irrig. Sch RD 32300/L Of ASHC Shri APS Block
Prov and supply laying cutting testing comm of W S DI K 7 K 9 pipe line with H C install of T W Const of Inspection Chamber Pump House Sluice Valve Fire Hydrant Haudies including Dismantling and Reconditioning of roads in Gurdaspur UNDER UIDF Scheme
P/F OF SUBMERSIBLE MOTOR IN MC OFFICE
PUMP COOLER
Metering pump
SYRINGE PUMP