Loading…
Loading…
13,294 results • Best match
AHP Unit III O H Works 2023 24 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of Ash water tank Ash slurry Sump etc in Ash Handling pump House
Hiring of technical staffs for operating 02 nos of 50 HP capacity dewatering pumps and 04 Nos of 25 HP capacity dewatering pumps total 6 pumps at Zone I and II Lorry Station for a period of 60 days
Providing Borewell Erection of submersible Pumpset Laying of at ward no 01 Sangamam Nagar in Chettipalayam Town Panchayat.
Providing Borewell and Erection of Submersible Pumpset at ward No.1,Avarankodi Thoppu Area in Pallapalayam Town Panchayat.
Providing 200mm Dia Borewell With 15 HP Submersible Pumpset Arrangements At Poondi Garden OHT In Koradachery Town Panchayat.
Providing Borewell and Erection of Submersible Pumpset at ward no.12 Siva Sakthi Nagar in Irugur Town Panchayat.
Providing Borewell and Erection of Submersible Pumpset at ward No.18 , Noyal Street Area in Irugur Town Panchayat
Providing Borewell and Erection of Submersible pumpset at ward no 11 Pattalamman kovil street in Pooluvapatti town panchayat
Provinding Borewell and Erection of power pumpset Arrangements at ward no 14 Mettutheru mariammapuram In Perur Town panchayat
Rectificatin of repairs to 10HP Motor in Kanyakumari RR park and 12.5HP submersible pumpset in Poojapuravilai Open well
Providing 150mm Dia Borewell and Supply Erection of Submersible Pumpset at Ward No.15 in Narasimmanaickenpalayam Town Panchayat.
Providing Borewell and Supply and Erection of submersible Pumpset at ward no 15 Andipalayam in Vedapatti Town Panchayat.
Providing Borewell and Erection of Submersible Pumpset at ward No.15 , Near Mariamman koil in Pallapalayam Town Panchayat
SUPPLY AND ERECTION OF SUBMERSIBLE PUMPSET AND PIPE LINE ARRANGEMENT AT WARD NO.7 OHT IN DEVAKOTTAI MUNICIPALITY
Providing New Borewell with Pumpset (Ward No. 1 to 5) 5 Nos in S.Kannanur Town Panchayat, Tiruchirappalli District.
Providing New Borewell with Pumpset (Ward No. 6 to 10) 5 Nos in S.KANNANUR Town Panchayat, Tiruchirappalli District.
Providing New Borewell with Pumpset (Ward No. 11 to 15) 5 Nos in S.KANNANUR Town Panchayat, Tiruchirappalli District.
Providing New Borewell and Erection of Pumpset and Pipe line to 100000 OHT at Thethampatti, H/O Paralipudur
Bearing RTD for pump and motors, Size 8mm, specifications as per Item 1 in Annexure A, B, Bearing RTD for pump and motors, Size 5mm, specifications as per Item 2 in Annexure A, B, Process RTD, Size 8mm, connection M20 x 1.5, specifications as per Item No 3 in Annexure A, B, Process RTD, Size 6mm, connection M20 x 1.5, specifications as per Item No 4 in Annexure A, B, Process RTD, Size 3mm, connection M10 x 1, specifications as per Item No 5 in Annexure A, B, Lumpsum Testing charges for the RTDs. Minimum 1 No of RTD unless specified separately in Annexure A from each of the 5 types of RTDs mentioned in Annexure A shall be tested as per the specifications
Supply and Erection of 7.5 H.P Submersible motor into Existing Openwell and Extension of pipe line for water supply arrangements at Ward No.06, Near Marriamman Kovil in Nallampatti Town Panchayat
PROVIDING EXISTING BOREWELL WITH MINI POWER PUMP AT WARD NO.14, NEAR PIDARIYAMMAN KOVIL
MOEI and Fans i/c RMO of HT LT Substation 3 x 80 TR Air cooled type AC plant DG sets split type AC units passenger and Goods lifts water supply pumpsets street lights fire fighting system etc for office building of commisioner of Customs Airport Air cargo Complex Meenambakkam Chennai-27 for the Financial year 2024-25 Subwork/Packages: Providing Services for Day to day operation and maintenance
MOEI and Fans i/c RMO of HT/LT substation 3 x 80 TR Air cooled type Ac plant DG Sets Split type AC units Passenger and goods lift water supply pumpsets street lights fire fighting system etc for building of commissioner of customs airport air cargo complex Meenambakkam Chennai-27 for the financial year 2024-25 Subwork/Packages: Repairs to APFC Panel battery DG Set and Fittings
Operation of pump and valves for supply of construction water to ESEZ STPP site from E SEZ STPP pump room located in the NCTPS II premises for the period of six month from the date of commencement including attending leakages damages in the pipe line
MTPS I TM Unit II Overhauling of OLCTC System Pump LHS and RHS 200mm condenser air release cum vacuum Breaking valve and its isolation gate valves and gear mechanism condenser cooling water box drain valves CW box air vent valves etc
Providing Deep Borewell and Construction of Pump Room at Indira Nagar in Thirubuvanam Town Panchayat
TTPS Mech II TM I Unit I II III Breakdown works in Turbine lub oil system seal oil system such as MOT Lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026
Providing operation and maintenance of transformer Sub station, Engine Alternator sets PAC units and Pumps at TE Building, Sai Baba Colony Coimbatore (for 12 months) (SW Comprehensive maintenance of (12X7 TR) HPAC UNITS working at 2G and 4G and 3G PA
NCTPS II Civil Maintenance Circle Maintenance of water supply including operation of pumps and valves in all type of Residential quarters at Vallur camp for the period of One year from 01.04.2024 to 31.03.2025 or from the date of commencement
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator GB Overhauling checking and renewal of Nitril rubber seal and Painting of Intake Screen of Cooling water Pumps 1A 1B 1C in Unit I during AOH 2024 2025
TTPS Operation Circle CAD Unit IV Annual overhauling work overhauling of 1200mm butterfly valve gear boxes and air release valves of Cooling water pumps 4A, 4B, 4C 4D Replacement of wornout body seal ring Disc seal ring in 1200mm Butterfly etc.,
NCTPS II Civil Maintenance Circle Civil Maintenance Division Operation of Water supply valves Water supply pumps at various buildings of NCTPS II Operation of Potable water and TTRO water valves from Stage I to Stage II and from TTRO main tappin
TTPS Operation Circle CAD CWPH I Upkeepement and attending minor repair works for ensuring uninterrupted and smooth running of cooling water pumps and TWS in unit I II III for the period from the date of entrusting the work upto 31.03.2022
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines, column pipes and accessories of cooling water pumps, discharge butterfly valves, 25 5 Ton EOT crane and chlorination plant available in CWPH II for the period
Supply of 10 nosof 20HP Electrical Operated Submersible Sewage Water Pumps along with suitable star delta starters 10mtr cable 15 mtr delivery hose pipe and all other necessary accessories for deployment in flood prone areas in Zone I to XV t
TTPS Operation Circle CAD Laying of new power cables and providing new power supply sources along with panels in CWPH II O mtr walk way for providing power supply for lighting and dewatering pumps in CWPH II and its froebay channel
Supply of 5 nos. of 10HP 7.5KW Electrical Operated Submersible Sewage Water Pumps along with suitable star delta DOL starters 10mtr cable 15 mtr delivery hose pipe and all other necessary accessories for dewatering purposes in Zones 6 to 10
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator GB Overhauling checking and renewal of Nitril rubber seal and Painting of Intake Screen of Cooling water Pumps 1A 1B and 1C in Unit I during AOH 2023 2024
Supply of 5 nos. of 10HP 7.5KW Electrical Operated Submersible Sewage Water Pumps along with suitable star delta DOL starters 10mtr cable 15 mtr delivery hose pipe and all other necessary accessories for dewatering purposes in Zones 1 to 5 N
MTPS I Mill Plant AC Plant Unit III AOH 2023 24 Air Washer System Epoxy painting of blowers discharge duct and spray system new air filter renewal Overhauling the AWCW Pumps and gate valve Spray nozzles cleaning Flushing the spray syste
NCTPS II Civil Maintenance Circle Civil Maintenance Division Operation of Water supply valves Water supply pumps at various buildings of NCTPS II Operation of Potable water and TTRO water valves from Stage I to Stage II and from TTRO main tappin
NCTPS I Operation Circle O and E Division Fire Fighting Carrying out periodical preventive maintenance works in fire protection pumps Sluice valves of Hydrant and HVWS system for a period of one year from the date of handing over of site
NCTPS II Civil Maintenance Circle Civil Maintenance Division Operation of Water supply valves Water supply pumps at various buildings of NCTPS-II Operation of Potable water and TTRO water valves from Stage I to Stage II and from TTRO main tapping
Supply of 2 nos of 10HP 7.5KW 2 nos of 22 HP 17 KW and 2 nos of 30 HP 22KW Electrical operated submersible sewage water pumps along with all other necessary accessories for dewatering purposes in Zones 14 and 15
MTPS I Mill Plant AC Plant Unit I AOH 2025 26 Air Washer System Epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows W type eliminator chemical cleaning Overhauling the AWCW Pumps
TTPS Mech II TM I Unit I II III Breakdown works in Turbine lub oil system seal oil system such as MOT Lub oil seal oil pumps coolers etc for the period from 01 04 2026 to 31 03 2027
Special repairs to conversion of convention lights into LED lights at CG Family Accommodation Royapuram and special repairs to replacement of BER motor/pumps and cooling appliances at RHQ(E) CGRA Royapuram and Provision of LED Name Board for BMU(CHN)
TTPS Operation Circle CAD CWPH I Upkeepement and attending minor repair works for ensuring uninterrupted and smooth running of cooling water pumps and TWS in unit I II III for the period from 08 10 2022 to 31 03 2023
NCTPS II Civil Maintenance Circle Civil Project Division Maintenance of water supply including operation of pumps valves in all type of Residential quarters at Vallur camp for the period of One year from 01.04.2025 to 31.03.2026 or from the date
TTPS Mech II TM I Unit I II III Breakdown works in Turbine lub oil system seal oil system such as MOT Lub oil seal oil pumps coolers etc for the period from 01 04 2024 to 31 03 2025