Loading…
Loading…
1,065 live381 closing this weekmost from Indian Railways and Northern Railway
1,065 results • Best match
Goods Transport Service – Per KM Based Service - Railway materials (CASNUB Bogie); Platform Truck; 40 FT Length, 25 MT
L030-FROM PWD ROAD AT BHELUKDABRI TO RAILWAY LINE AT MADHYA SALSALABARI under Alipurduar-II Block, PKG WB21127
Monitoring of Construction Projects of West Central Railway byusing Arial videography with RTK/PPK enabled UAV/Drone
Supply of Insulation Monitoring Device with fault locator kit for Railway signaling and telecommunication (S&T)systems.
Ward sankhya 5 adalpur Mein railway crossing Kari road se Sefu plant Tak covered Nala ka Karya
Const. of toilet near railway flyover at entry gate of old thesil bawal in Municipal Committee Bawal.
Contract for Development and Operation of Cargo Related Facility (CRF) on Railway Land at Turbhe Site A
Contract for Development and Operation of Cargo Related Facility (CRF) on Railway Land at Turbhe Site B
Contract for Development and Operation of Cargo Related Facility (CRF) on Railway Land at Turbhe Site C
Construction Of Pre-Fab Police Check Post for Public Safety at Balbir Basti Near Fatak (Railway Gate)
DPR, DE and PMC for Railway Siding Works including OHE and ST for NABINAGAR STPP StageII 3x800MW
Outsourcing Phased Array Ultrasonic Testing (PAUT) of Flash Butt welded joints in Pune Division of Central Railway.
Construction of road Culvert from Sankarma railway fatak to Jayanagar road,ward no-28 under SMC Sambalpur
Tab./Cap. Methadone 5 mg. (Product should be available in the approved product list of railway board.)
TAB./CAP. ARIPIPRAZOLE 5 MG. (Product should be available in the approved product list of railway board.)
TAB./CAP. BETHANECOL 25 MG. (Product should be available in the approved product list of railway board.)
Request for Proposal (RFP) for providing Project General Management Services - Design for CAO-CON North Western Railway
Provision of 96 fiber OPGW AEC conductor in Daund-Wadi section of Solapur Division of Central Railway.
1. S&T work in connection with provision of Track Renewal Jabalpur division of West Central Railway (Signalling Work). 2. S&T work in connections with turnout renewal in JBP-KTE Section of Jabalpur Division on West Central Railway (Signalling work).
Repairs to Type-IV & Type-V Railway Staff Quarters at Vaisakhi and Hill View Rail Colonies, under the section of SSE/W/South/VSKP, under Sr. ADEN/Estate/VSKP, in the jurisdiction of Sr. DEN/HQ/VSKP, South Coast Railway.
Providing Project General Management Services (PGMS) for the office of CAO/CON and allied offices for a period of next 5 years in connection with New BG Railway line/Gauge Conversion/ Multitracking/ Doubling projects of Construction Organization, ... Eastern Railway .
Grant of Lease for 2.5 acres or 10,117 sqm approx of Railway Land for Commercial Development at Aynavaram plot A for a period of 60 years along with redevelopment of 17 Type II quarters situated along Konnur High road, Chennai, TN
Work of Repair including cost of incidental spares/material for "Coil Spring Scragging and Load Deflection Testing Machine, (HP-53), Make-Marwaha Manufacturing Co., New Delhi", SR. No. ASTM-125 of wagon shop of JUDW/N. Rly.
Construction of Brick Paved Road at Namkhana Railway Station to Paribesh guest house PR road Connector for a length of 270 M. at Namkhana point at Mouza-Narayanpur, Block-Namkahan under Kakdwip Irrigation Division I.C. with G.S.Mela-2027
GPS TRACKER Personnel Tracking Device (PTD) including SIM card with 03 years warranty for regular use of Patrolmen and USFD operators under Division having specification as per Rly Board L. No. 2017/Track-1/29/8 Dated 16.01.2018 including cost per ... per Rly . ...
Carriage of Finished Wheels from Rail Wheel Factory, Yelahanka, Bengaluru, Karnataka-560064 to various Railway Consignees located under the distance slab of above 500 km and up to 1000 km, by Road. LOADING AND UNLOADING BY RAILWAYS AT FREE OF COST. NOTE: Mandatory documents should be submitted in compliance with bid security condition, Power of Attorney, IBA Certification, Annexure-XVIII. Non-submission of necessary documents/Annexures in support of the above may result in the REJECTION OF BIDS. Quantity: 3700 MT(Approx).
Supplying including loading, transportation, unloading of 2,00,000 cum machine crushed track ballast (Pakur/Sahibganj area) as per Railway/RDSO's specification of track ballast IRS: GE-1, June'2004 with up-to-date correction slips and stacking the ... B.G. Railway Track ... of railway wagons ...
Triennial Work for Maintenance of Railway Tracks in Mumbai Port Authority jurisdiction extendable by one year on Two Occasions. Parts I and II
Laying of 2Nos 33KV XLPE UG cable at Railway crossing Km No131/7-9 and 8-10 for 33KV Armenipadu feeder emanating from 132/33KV Gudur to Naidupeta to avoid Railway crossing at sankaragirijana colony in Chillakur (M)pertains to Gudur Division in Nellore Circle
Goods Transportation service - Monthly Based Service - Outside state; Railway Materials; MUV Pickup van, Goods Transport Service – Per KM Based Service - Railway Materials; Non-AC base Model MUV (Pick up Van) of loading capacity one MT with sitting capacity of 4/6 persons; Non-AC base Model MUV (Pick up Van) of loading capacity one MT with sitting capac..
Custom Bid for Services - MAINTENANCE OF RAILWAY TRACK, Custom Bid for Services - PROVIDE TECHNICAL SERVICES, Custom Bid for Services - LIASIONING JOB Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments Repair, Maintenance and Installation of Plant Systems/Equipments
Road improvement work from R-08/23 to Railway Ring Road via Mahavir School in Ward-67 Rajnagar.
Shifting of HT/LT Line at ward no 9,10,12,13,14 subhash tiraha to amlai railway Gate NP Dhanpuri Area.
Outsourcing of various machining works of wheel-shop at Pratapnagar workshop, Western Railway as per scope of work.
6TH SFC Construction of Drain at Ward no 24 Tholampalayam Main Road Near Railway Gate in Karamadai Muncipality
Project General Management Service (PGMS-1) for Projects in Construction Organization under CAO/Const of West Central Railway.
CONSTRUCTION OF CC STRET FROM ELECTRICITY BOARD TOCHUNNA BHATTI ALONGSIDE RAILWAY LINE IN WARD NO 15 MC HISAR
Excavation of foundations for marking the shop sites near the railway booth of the Talwandi Bhai Municipal Council
Replacement of cabin in Railway Truck No. HR69E9122 model TATA 1918C RCNK, Sonipat (As per Scope of Work)
Supply of prestressed concrete sleeper for day to day maintenance of MPPGCLs private railway siding at ATPS Chachai.
Request for Proposal (RFP) for Appointment of PROOF CHECK CONSULTANT for Construction Organization in North Eastern Railway, Gorakhpur.
PROCUREMENT OF NAVIGATED DRILL SYSTEM FOR SPINE SURGERIES OF ORTHOPEADIC DEPARTMENT OF DR. BAM HOSPITAL BYCULLA CENTRAL RAILWAY
Tab./ Cap. Clomipramine HCl 25 mg. (Product should be available in the approved product list of railway board.)
Empanelment for Service Providers for provision of catering, housekeeping facility management at Non-Railway Catering Services under IRCTC
Repairing of Pot Holes of Road from CHP Gate to Bankola Railway Gate No.1 under Shyamsundarpur Colliery.
Appointment of PGMS Agency for providing Project General Management Services for CAO construction unit South Central Railway, Secunderabad
Signalling Works in Connection with "Extension of Loop Lines at Hirenanduru Yard in Solapur Division of Central Railway".
Provision of CCTV based Video Surveillance System in GLO building at Churchgate station of Mumbai Division, Western Railway.
EMPANELMENT FOR SERVICE PROVIDERS FOR PROVISION OF CATERING HOUSEKEEPING FACILITY MANAGEMENT AT NON RAILWAY CATERING SERVICES UNDER IRCTC