Loading…
Loading…
4,204 results • Best match
Rerouting of existing of 400mm dia Coramandal bulk water supply pipe line with MS Carrier pipes and 800mm dia Casing Pipe (Thatipudi source) at Railway crossing Portion through Horizontal Direction Drilling Technique Method near railway Bridge no.1655 pole No. 872/21/1 to 872/23 at NAD fly over of GVMC under Deposit Contribution Work
"Construction of Road Over Bridge at Km 1/2 of Guntur - Amaravati Road in Guntur District Municipal Corporation Limits in Lieu of LC.No.497A of Railway Km 0/5-6 in between Guntur Nallapadu Section in Guntur District. SubWork:- "Construction of Sheet ... existing railway building ...
Consultancy services for preparation of Designs and Drawings of Railway proper and getting them proof checked from IIT and preparation of detailed estimate of Railway proper for the work " Construction of ROB in lieu of LC No.64 of Rly.Km.73/0-1 of Bellamkonda-Piduguralla and km.10/340 of Julakallu-Piduguralla road in Guntur District."
Removal of Silt at Nandivelugu Road South and North Side From Rajaka Kailasa Sathram to Railway Mondi Gate via Sridevi Bhudevi Sametha Venkateswara Swamy Temple and Balaji Nagar Main Road East and West Sides From Mani Hotel Center to Krishnudi ... to Railway Mondi ...
Custom Bid for Services - Providing housekeeping and maintenance services for ORH Subordinate Rest Houses Track Machine Rest Houses at various stations in DENWestGTL jurisdiction for a period of 24 Months Schedule A bed sheetsetc, Custom Bid for ... for Railways On-Board ... for Railways On-Board ... for Railways On-Board ... for Railways
upgradation of existing MCHV railway track up to silo i e from CH1200M to 1479m 280m and laying of Locomotive reversal line for length 1480m at East side of R5 line to suit EOL operations
Washable Pillow, size: 600 (+/-10 )mm length(L) x 400 (+/-10) mm width(W) x 120 (+15/-0) mm thickness(H) to Drawing / Specification As per construction details: 1) Material of Pillow-Polyester Staple Fibre, 2) Fibre content-100% white virgin hollow ... " Indian Railways " ...
Construction of RCC Drain (Precast units) including P.Way works (Lifting and Packing of existing railway track portion) from EQ-7 gate to BG loco approach road
Construction of Diversion road in Km 2/2 to 3/9 of Koilakuntla - Banaganapally road in Kurnool district in view of new (Nandyal - Yerraguntla) railway line.
Removal of Silt from Vaddera colony to Kotturu Railway gate & Mugguroad Baptist Church to IOC back side & Prabunagar to Nulkapeta via Krishnanagar Pumphouse in Tadepalli Municipality
Desiltation of major drain Gundlakamma chanel from Ramalingapuram railway under bridge to Mini bypass via Karnalamitta high school including connected medium drain in Division no. 45
Construction of Diversion road in Km 2/6 to 3/4 of Koilakuntla - Banaganapalli road in Kurnool district in view of new (Nandyal - Yerraguntla) railway line
Engaging Labour for maintenance of Central Dividers along GNT Road, Darga Road, Subedarpet Road, Railway Feeders Road and Traffic islands from May 2021 to June 2021
Providing BT Road at BRTS Road from Misala Rajeswara Rao Bridge to Railway DRM Office road Junction.(Development works for improvement of Civic Amenities-100Crs Grant)
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
(General Fund : 2023-24) Construction of CC Drain and CC Road at SC Colony Besides Railway Track Colony in Div. No. 27 Under AE-3 Section.
Providing BT Roads from D1/SS/296/B1 to Railway Track at YSR Nagar in Ward No. 01 Under General Funds 2018-19 Est Cost:34.00Lakhs
Construction of CC Outfall Drain at Nehru Nagar main Road from Sajeevaiah Nagar Railway Track to Ayyappa Swamy Temple in Div.No.50 under AE-8 Section
Removal of Silt from Vaddera colony to Kotturu Railway gate & Mugguroad Baptist Church to IOC back side & Prabunagar to Nulkapeta via Krishnanagar Pumphouse in Tadepalli Municipality
Improvements by widening and Reconstruction of existing R&B Road at 835/4 of N.H.16 Bendapudi to Ravikampadu Railway ward (1.2 K.M Length) (2nd Call)
Engaging of PC-100 Max Proclainer for removal of Silt at Suddhapalli Donka from Thirupathamma Thalli Temple to Railway Track south side in AE-VII Section
Supply, delivery , laying, jointing and testing of 250mm dia DI K9 Pumping main from Machilipatnam railway cabin to Head Water Works of Pedana Municipality - 3rd Call
Removal of Silt at Nandivelugu Road from Rajaka Kailasa Sathram to NH-16 via Sridevi Bhudevi Sametha Venkateswara Swamy Temple & Railway Track in AE-VII Section
Execution of Formation, Civil Works and P-Way works in connection with Second Railway line for loading of Caustic wagon at Port facilities NALCO,Visakhapatnam, AP.
Supply, Erection, Installation, Testing and commissioning including O and M of RDE Radiological Detection Equipment at new RFID gates and Railway wagon screening points in VPA
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
Shifting and Re-Construction of RCC Drain and RCC Culverts From Railway hospital to Satram in Div No.06 under AE-10 section LLR (2nd call)
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
Formation of BT road surface cutting and wet mix macadam in bans hotel top ambedhkar bhavan side and railway gate entrance curve to 3rd gate side
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
DESILTATION OF MAJOR DRAINS OF CHEEDILAPPORA DRAINS FROM MAYOR X ROAD TO RAILWAY TRACK, MUTHAGOPALA KRISHNA FLYOVER JUNCTION CULVERTS IN 44,45,46 DIVISIONS OF KAKINADA MUNICIPAL CORPORATION.
Removal of Silt from Mew Palnadu RTC Bus Stand to Railway Mondi Gate via Vinobha Nagar in Div. No.04 under AE-VII Section.(2nd call)
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
Construction of CC drains and culverts to connect to disposal drain beside Railway line opp. Vijaya Dairy in Division no. 53. Under 15th FCG 2nd Installment
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
(General Fund : 2023-24) Construction of CC Drain and CC Road at SC Colony Besides Railway Track Colony in Div. No. 27 Under AE-3 Section.
(General Fund : 2023-24) Construction of CC Drain and CC Road at SC Colony Besides Railway Track Colony in Div. No. 27 Under AE-3 Section.
Construction of CC drains and culverts to connect to disposal drain beside Railway line opp. Vijaya Dairy in Division no. 53. Under 15th FCG 2nd Installment
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
Construction of Outfall Storm Water Drain with RR Stone Revetment from Kadakatla Railway Gate to Uppakapadu Drain under 13th Finance Commission Grants 2014-15 - (3rd Call)
Providing BT Road at BRTS Road from Meesala Raja Rao Bridge to Railway DRM Office road Junction.(Development works for improvement of Civic Amenities-100Crs Grant)
Providing RCC drain along the road from Sri Surya Junction to Railway new colony circle at Srikanya main road (South side drain) in Ward No. 31
Raising of CC road and Construction of CC drain from Vemula Uday house to Railway compound wall at Janthipeta in ward No-32 in Chirala Municipality
Replacement of damaged sewer pumping main with 600mm Dia pipe line (Seetharampuram) running through Railway Track Box Culvert from Ramakrishna Puram Connected to Singh Nagar STP
Laying of CC Road from D.No.6-9-20A (Beside Ramakrishna Dental) to D.No.6-9- 47A, Railway Track Road at N.R.Peta in Division No.20.