Loading…
Loading…
1,986 results • Best match
Rajkot Division- Proposal for Provision of Outsourcing of the part supply, installation, testing and commissioning in connection with work for repair and maintenance of outdoor signaling gears in the ADSTE/RJT Section of RJT division in Year 2026-67 ... Western Railway .
: Book of 250 leaves ruled Size:20.5 x 33 cm. printed East Central Railway in Hindi and English [1]Paperto be used white printing of 60 GSM as per IS No.1848/2007. [2]Cover Straw of 68 DKG, 1350 GSM a
Electronic LED Driver to Operate on 90 V to 140 V AC/DC Suitable for 9 W Light Fitting used in Railway Coaches as per RDSO Specification No: RDSO/PE/SPEC/TL/0091-2016 (Rev-1) or latest. Sample to be g
End Door Locking arrangement. Drawing No. : S.E. Railway Drawing No. KGP- 2031, Alt. c, Item Nos. 1, 2, 3 & 4 in assembled condition and Item Nos. 5, 6, 7 & 8 are in loose in a set. Material and Specification : As per Drawing.
Custom Bid for Services - Hiring of 32 Ft Trailer Truck having minimum carrying capacity of 18 Metric Ton along with fuel consumables etc for round the clock at ICD Pratapnagar for transportation of Bogies wheels and Railway materials up to 4000 Kms ..
NDRF COAT COMBAT/2 IN 1 JACKET
Climbing Helmet (Q3)
CSSR Boot (Hard Toe Steel Shank Boot)
Steel Folding Cot (V2) (Q3)
AMC/CMC of Fire Extinguishers - Institutional; ABC, AMC CMC of Fire Extinguishers - Institutional; DCP, AMC/CMC of Fire Extinguishers - Institutional; Carbon Dioxide Fire Extinguisher, AMC/CMC of Fire Extinguishers - Institutional; Foam Based Fire Extinguisher
BOQ
Small Angle Grinders (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6813275 Dated : 24-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Residual Current operated Circuit Breaker (RCCB) 32 Ampere rated current (2 pole), with a 30 mA residual operating current protection device(Details description and specifications are attached in Annexure-I)., AC/DC Leakage Current Clamp Meter (as per Specn.) High Sensitivity, Miniature type Clamp, resolution of 1 mA for AC/DC Current. Maximum range of 100A AC/DC. True-RMS display. Make: Metravi or Similar., Electric Ceiling Fan, BLDC type( Details description of specification as per annexure-I of document section)
thermal imager (Q2)
Custom Bid for Services - Filling of sand in ElectricDiesel Locomotives including maintenance of defective sand gears cleaning of Nozzles Hosepipes etc for ensuring proper functioning of sand gears and keeping additional sand bag 10kg in each bag in .. Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Custom Bid for Services - Engagement of Ex Servicemen as Gatemen on contract Basis for the period of 24 months in Dhasa to Jetalsar to Wansjaliya Section Against the work of Engagement of Ex Servicemen as Gateman on Contract Basis for the period of 2.. Similar Category Manpower Outsourcing Services - Fixed Remuneration
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Custom Bid for Services - 1 NS Hiring of 1 Nos road heavy motor vehicle trucks of 9 tonne capacity for the section of SSE P Way BIY for a period of 2 years, Custom Bid for Services - 2 NS Hiring of 1 Nos road heavy motor vehicle trucks of 9 tonne capacity for the section of SSE P Way VYA for a period of 2 years Similar Category Goods Transportation service - Monthly Based Service Goods Transportation service - Monthly Based Service
Goods Transportation service - Monthly Based Service - Outside city within state; Construction Material, Household/Office, Machinery & Equipment; Open Body LCV Truck
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor, Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; Deep Cleaning; Indoor, Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Outdoor
Goods Transportation service - Monthly Based Service - Outside city within state; Construction Material, Machinery & Equipment; Open Body LCV Truck
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 km x 320 hours; Outstation 24*7
Static HF Transceiver as per MHA QR (V3) (Q2) (3 (3 ))
Custom Bid for Services - AMOC of Bio-toilet System of Primary/Secondary & STR/RBPC/Terminating/Platform Return Maintenance Trains and Associated Activities at Surat, Udhna, Valsad, Nandurbar, Vasai-Road/Virar & Dahanu-Road Stations for a Period of ... for Railways (New ... for Railways Public ...
Safety Footwear as per IS 15298 (Q2) MSE Exemption for Years of Experience and Turnover
Induction Heater (Q3) MSE Exemption for Years of Experience and Turnover
Domestic Pressure Cookers (V2) as per IS 2347 (Q3) MSE Exemption for Years of Experience and Turnover
Contract work for supply and pasting of digitally printed vinyl coated laminated stickers for Destination boards, Belly (Panel) boards and Coach indication/Triangular number plates as per railway drawings for Primary trains of Coaching Depots Kankaria and ADI BG for a period of two years
Comprehensive Annual Maintenance Contract (CAMC) for Cummins Engines installed 140T Diesel Engines break down crane of ART of Vadodara Division, Western Railway for a period of three years through authorized dealer of OEM M/s Deccan Sales & Service Pvt. Ltd through single tender basis.
Shifting of Temporarily Extended D/E of line No. 5 near RRI (S) at BRCP and UDL-8 near Hump at BRCY with associated ancillary works for clearing Construction working space in ROW of MAHSR as per approved Railway Drawings in connection with MAHSR Pro.
Contract work for supply and pasting of digitally printed vinyl coated laminated stickers for Destination boards, Belly (Panel) boards and Coach indication/Triangular number plates as per railway drawings for Primary trains of Coaching Depots Kankaria and ADI BG for a period of two years.
Supply, Installation, Testing, commissioning of S&T items in connection with Provision of (i) Cable replacement/shifting work in Jetalsar - Wansjaliya and Lalpur Jam - Kanalus section (ii) Insulation improvement in various block section & Earth ... Western Railway .
Construction of various Major bridges including misc. works like pitching, toe wall, floor protection and other misc. works required for successful completion of work between Naliya to Jakhau in connection with New BG Line between Naliya - Jakhau ... Western Railway .
Construction of various Major bridges including misc. works like pitching, toe wall, floor protection and other misc. works required for successful completion of work between Naliya to Jakhau in connection with New BG Line between Naliya - Jakhau ... Western Railway .
Calibration Services - Medical; Medical device calibration; Central Drug Testing Laboratory, Research Designs and Standards Organisation, Ministry of Railways, DRDO Facilities, ARAI Labs, National Testing House, International Centre for Automotive Te..
Calibration Services - CALIBRATION OF COUNTER PARTICLE READONT; CALIBRATION OF COUNTER PARTICLE READONT; NABL Labs, CSIR Labs, Research Designs and Standards Organisation, Ministry of Railways, DRDO Facilities, International Centre for Automotive T..
Calibration Services - Mechanical, Electrical; Frequency, Power Factor, Phase Angle, Resistance, Temperature, Voltage, Current, Power (AC/DC); NABL Labs, Research Designs and Standards Organisation, Ministry of Railways; Hybrid (detailed in scope of ..
All in One PC (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5747185 Dated : 31-12-2024 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MSE Purchase Preference MSE Purchase Preference No MII Purchase Preference MII Purchase Preference No 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Supply of FortiGate-200F Firewall or higher, Supply of 5 year Unified Threat Protection-UTP and 24x7 Forticare for Firewall, Supply of IP OFFICE R10plus 3RD PARTY IP ENDPOINT 1 LIC, Installation of all the above items, Testing and commissioning of all the above items
PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6784219 Dated : 13-10-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6677003 Dated : 12-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6333160 Dated : 11-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Office Chair (V3) (Q2) MSE Exemption for Years of Experience and Turnover
Solar Micro Pumping Systems as per MNRE Specification (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6627278 Dated : 04-09-2025 Bid Document 1/16, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 14850000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 445500 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 62 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/16 Accounts Officer Directorate of Employment & Training, Block-1, 3rd Floor, Dr. Jivraj Maheta Bhavan, Gandhinagar, Gujarat. 382010 (Accounts Officer) Splitting
Tent Extendable Frame Supported 4M and 2M Complete with Accessories (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6544807 Dated : 26-08-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
AC EV Charging Station (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6657883 Dated : 10-09-2025 Bid Document 1/15, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 6490000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 194700 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/15 Accounts Officer Directorate of Employment & Training, Block-1, 3rd Floor, Dr.Jivraj Maheta Bhavan, Gandhinagar, Gujarat, 382010 (Accounts Officer) Splitting
PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6760975 Dated : 07-10-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Computer Printers (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5746977 Dated : 24-12-2024 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MSE Purchase Preference MSE Purchase Preference No MII Purchase Preference MII Purchase Preference No 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "