Loading…
Loading…
2,291 results • Best match
Annual Plan-109/2024-25 Peringavu Thodu Cleaning near Guruvayur-Shornur Railway Line in Div 2-Annual Plan 2024-25-General Civil Work
KHRWS- Rectification work on Back Portion of KHRWS Deluxe Pay ward due to Railway Development Purpose at Thycaud W and C Hospital, Thiruvananthapuram
LRRP-24-25 Azhikkode LAC Sl.No.529-Railway Gate Bappikkan Thodu Road in Pappinisseri GP Kannur District -.-General Civil Work -.-General Civil Work
Deposit work Southern Railway Shifting and relaying of water pipe line for the reconstruction work of road over bridge at Manjoor Manjoor panchayath
GENERAL-KRE1-6567800/25-26 Desilting Railway lane - Navami Garden thodu in div 45 (Old 49)-Vyttila Zonal, Kochi Corporation-General Civil Work
Annual Plan-Road Renovation- Mayyanad GP P.No 123/25-26 Vellunthara Mukku North Railway Line reconcreting ward 12 (Second Reach)-General Civil Work
KRE1-6572785/25-26 Punchathodu desilting - Aisha Road to Railway Culvert in div 45 (Old 48)-Vyttila Zonal, Kochi Corporation-General Civil Work
Retender GENERAL Budget Work 2024 2025 Improvements of Village Roads Gurumandiram Railway line road Ward 1 in Cheriyanad Grama panchayath General Civil Work
Annual Plan-Thrissur Corporation KKY Zonal Dn 43-WMMTARRING at Panamuku Herbert nagar road(Railway side)-PROJECT NO.1768/24-General Civil Work
Haritha keralam Class II -Construction of a SWECB across Vattakulam thodu at the U/S of Railway bridge in Payyannur Municipality Ward - 22
WARD 5 -Road maintenance from the TTI school to Bypass, the front side to the Alan Pala and the Railway Line Road Maintenance
LAC-ADS-Tirur LAC-Project No. LAC23360- Construction of Transformer Muttikkal Road, Indira Nagar Railway Link Road Concrete in Thalakkad GP, Malappuram District
Pro No 143/24 Olappedika Choyees smaraka Road Railway Chambra Road Concreting in Div 3 of Tanur Municipality under Annual plan 2023-24
Pro No 573/24-25 VELLARIPPARAMBU RAILWAY LINE ROAD CONCRETING, DIV 34-2024-2025 in of Tanur Municipality under Annual plan 2024-25
Deposit- Railway- Emergency Utility shifting of existing 100 mm water authority pipeline to new alignment in connection with construction of Chelari - Chettipadi ROB
Annual Plan-Maintenance of Vettikkattu Temple Railway line road in ward 16 of Mynagappally GP-SO 76/24-25/MNPY-General Civil Work
Doubling of railway track between Trivandrum and Kanyakumari Replacing and relocation of KWA water pipes between Nemom and Killippalam Phase 3 Pipeline Work
TRANSPORTATION OF BAGGED FERTILIZER PRODUCTS BY TRUCKS/ LORRIES FROM FACT UC TO FACT CD AND FROM FACT CD TO KALAMASSERY RAILWAY SIDING (KRS)
ARK GP-255/23 - Drainage from Chemboda to railway crossing in Ward No. 04 of Aryankavu Grama Panchayat under Annual Plan 2023-24
Pro No 1739 25 Pro no 1739 25 26 Construction of CC drain to infront of Urban wood Railway in division no 49
Retender Annual Plan Project No 726 25 26 Sippayi Colony Railway link road renovation in division 22 of Parappanangadi Municipality General Civil Work
Issuance of Smart Cards/ID Cards - Dual-interface Cards; RAILWAY EMPLOYEES IN PALAKKAD DIVISION; Scanning and Digitization, Verification of documents submitted by applicants, Lamination, Packaging, Dispatch/Delivery, Re- issue, MIS/Application module..
MOE6/17051/18-Providing LED Street lights in Navel Base Road (Vathuruthi Railway Gate to Venduruthi Bridge)Division 30 Kochi Municipal Corporation-General Electrical Work
AMRUT-Laying 500 mm pipe from Thammanam to Kadavanthra - Railway crossing at Km 4/300-400 near Ponnurunni by Push through method- Pipeline Work
PROJECT NO.184/23 THODU CLEANING-THRISUR CORPORATION 2023-24 WEST ZONAL PERINGAVU THODU CLEANING INBETWEEN GURUVAYUR SHORNUR RAILWAY LINE REACH 2 DIVISION 2
Annual Plan-2022-23-Pallithodu Railway Track Road Concrete of Mogral Puthur Grama panchayath in Ward No.XIII-MPGP 160/22-23-General Civil Work
JJM WSS to Wandoor Panchayath Providing FHTC in the Distribution System at Western side of Railway track in Wandoor Grama Panchayath of Malappuram District
Annual Plan-PROJECT 61/2025-THRISSUR CORPORATION EAST ZONE DIV 3 THODU CLEANING GIRIJA THEATRE RAILWAY LANE VARIYAM LANESOORYA GARDEN THODU-General Civil Work
Annual Plan- Kunhimangalam GP Project No. 104/2025-26-Thamban Vaidyar Smaraka Vayanasala Thekkevayal Harijan Colony Kovvappuram Railway Gate Road Maintenance-General Civil Work
LAC-ADS -2023-24 Pattambi LAC-Construction of Villathupadi-Eduthara road, Kulukkalur Centre Eravatra Railway road, Vellanchery Colony road in Kulukkallur GP, Palakkad District
THRISSUR CORPORATION PRO. NO.110/20 KKY DN. 40 RAILWAY GATE TO KADAVARAM, THRITHANI VAZHI TO VISWAN KADA, PANANCHERI BILANE, PLASTIC ROAD ETC RETARING.
State Plan 2021 - 22 - TSS - Pettah Flyover Service Line from Thoppil lane Junction to Railway Line on Anayara byroad under Sewerage Section II, Kuriathy
Interlinking Thaikkattussery Transformer with Pulari Nagar by 300m OH and UG (2RUNS OF 185m) for replacing existing OH Railway Crossing under Electrical Section Ollur
Shifting of raw materials like Coal, Petcoke and Sweetener grade lime stone from Railway siding to respective stock yards at Malabar Cements Walayar Plant
Reconstruction and providing covering slab for drain from Sheeth Junction to the infront of Noushath Mansil Railway Border and Concreting Footpath In ward 12
MLA ADS ETTUMANOOR-Providing pipe line extension to Railway line Kalarimattom road Manakappadam roadAnganwadi Mother Theresa Nellippally road Thomason road WardVI of Athirampuzha Panchayath
Mavelikara BP - Annual Plan 2024-25 Improvement Works To Vilayilshethram Mukku To Railway Gurumandiram Road - Chettikulangara Grama Panchayath (Ward-13) Proj-61/24-25
NCFRW 2021 20 Pattanakkad BP Construction of road from Peringottu Railway cross to Peringottu Temple in ward 13 of Kodamthuruth GP General Civil Work
Annual Plan PKZ 1508/25 Branch roads Tarring Concrete starting from P K Raghavan road K P Road towards Railway Boundary in Div 3
Rotational Moulded Polyethylene Water Storage Tanks (V2) conforming to IS 12701 (Q3) (3 (3 ))
Second Hand Empty Gunny Bags (Q3)
Sanitary Napkins Incinetator Machine with Smoke Control Unit (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5762608 Dated : 30-12-2024 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MSE Purchase Preference MSE Purchase Preference No MII Purchase Preference MII Purchase Preference No 1. If the bidder is a Startup, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to their meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
The Multilayered Cross Laminated Sheets/Tarpaulins Covers/Agricultural Films as per IS 14611 (Q3)
Entry and Mid Level Laptop - Notebook (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6684593 Dated : 15-09-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) (3 (3 ))
Rotational Moulded Polyethylene Water Storage Tanks (V2) conforming to IS 12701 (Q3) (3 (3 ))
Second Hand Empty Gunny Bags(V2) (Q4)
Second Hand Empty Gunny Bags(V2) (Q4)
Country Jute Twine (V2) as per IS 1912 (Q3)
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, HTC at GS/FSD ANGADIPURAM