Loading…
Loading…
3,088 results • Best match
2. Construction of Building for Building Less School (Primary) GPS RAILWAY ST. MANGLIVAYAS Block Pisangan Ajmer
Construction of RCC Nala from Railway Boundary to existing cross at J.K. Circle (Nagar Parishad Rajsamand)
Plantation Work in Green /Plantation Belt Southern Side of Railway Line on UIT Land Sawai Madhopur
PERAPHERI KSHETRA RAILWAY LINE PASCHIMI KSHETRA ME CHOUKO ME TUBULAR POLE LED LIGHT LAGANE KA KARYA
Nigam kshetra me railway line ke paschimi kshetra me sthit parko me SOAK PIT nirman karya
PIT EXCAVATION WORK WITH BLASTING (WORK PLACE- JHALAWAR ROAD TO KHEDA JAGPURA IX BETWEEN RAILWAY LINE)
Construction of CC Road in om colony railway Fatak ward number 31 churu (Sr. No. 06)
PERAPHERI KSHETRA RAILWAY LINE PURVI KSHETRA ME CHOUKO ME TUBULAR POLE LED LIGHT LAGANE KA KARYA
Interlocking road construction work, from Tulsiram ki Chakki to Railway Line, Ward No 20 Hanumangarh Town.
PIT EXCAVATION WORK WITH BLASTING (WORK PLACE- BETWEEN JHALAWAR ROAD TO RAILWAY LINE KHEDA JAGPURA IX)
Plantation Work in Green /Plantation Belt Northen Side of Railway Line on UIT Land Sawai Madhopur
ADDN / ALTN OF EXISTING SECURITY WALL ADJOINING CIVIL AREA AND RAILWAY TRACK AT MIL STN KOTA
Construction of divider at 100 feet road (E-block parrelal of railway track) Shalimar Nagar, Alwar.
LUNKRASNAR ME SARVJANIK SHOCHALEYE KA NIRMAN KARYE RAILWAY FATAK SE KRAKSHI MANDI ROAD KALU HAIWAY PER
road construction work nagori bera near railway line road vinod kachhawaha house to kishan prajapat house
construction of BT road winding from water tank towards Renwal railway gate Ward No. 17 Ringas
Nigam kshetra me railway line ke purvi kshetra me sthit parko me SOAK PIT nirman karya
PARISHAD KSHETRA ME RAILWAY LINE KE PURV ME VIBHINN STHANO PER TREE GUARD SUPPLY KA KARYA
Construction of New Park near between NH Highway and Canal (Near Railway Gate) at Nagarpalika Srivijaynagar
Construction of CC road and drain from Railway Fatak to Home Science College Ward No 17
1. Construction of Drain from shyam vihar towards Railway Hospital in ward no 12 (Phase- 1)
CC road construction work from railway track to gas warehouse 900 feet ward no. 5 Sardarshahar
Construction of Civil foundation for Railway TSS Bay rev 6 at 132 KV GSS Rani Pali
C.C. Interlock road construction work from railway underpass towards Bajrang Bagh Nursery Jagmalpura Gram Panchayat Bhadwasi
Patch repair work of link road parallel to railway line at ind. area hanumangarh phase-I
Construction of drain work from Railway Hospital to Swami Vivekananda park behind Power House Hanumangarh Junction
Strengthening and widening of road from Savitri Mata Temple to Ganaheda Railway crossing BA 2026-27
BT Work on Nehru Nagar Railway Overbridge C-325 Km.1 (Mastic Asphalt and ROB Mtc.)
Cont of interlocking road from nohar road to railway line nehar side word no 06 bhadra
Construction of RUB at Madroop ka Par Railway Track Location 901/6-7 in District Barmer
PROVN OF STORM WATER DRAIN NEAR RAILWAY LINE UNDER GE(S) JAIPUR AT JAIPUR MIL STN
nagar nigam kota area mala phatak railway line mother teresa school behind nala cleaning work 7
CC Road and other development work from RUB to Railway LC Ward no 26 Hanumangarh Town
CO2 gas for gas welding plants,gas to be filled in Cylinder and supplied to Railway.
Const. of toilet and app. road for yard at 33 kv s/s Railway stn. Newai
Goods Transport Service – Per KM Based Service - Railway Material; Open Body LCV Truck; 19 FT LCV
Deposit work for shifting of water supply pipe line for Railway road LHS at Railway level crossing Number C-51 at Km. 562/3-4 at Bhadwasi Station under Jurisdictions of PHED Sub. Dn., Distt.I, Nagaur
Zone No 1 Ward 1 to 7 and 45 and mahwa road byepass tirahe se mandawara road pura and station road power house to railway line complete and railway line to gopal takij tak one side devider complete
Zone No 1 Ward 1 to 7 and 45 and mahwa road byepass tirahe se mandawara road pura and station road power house to railway line complete and railway line to gopal takij tak one side devider complete
Hiring of Consultants - Milestone/Deliverable Based - Provn of railway underpass from domestic to tech area at 5 FBSU; Provn of railway underpass from domestic to tech area at 5 FBSU; Yes; Hybrid(As specified in scope of work)
ADEN (HQ-I)/JP sub division: Zonal work Zone no.05-Jagatpura Railway officers colony, Rail Nikunj officers colony, New Rly Staff colony, Old staff colony, GM Bungalow at Jagatpura etc. and New HQ office building at Jawahar circle GTJT etc. for Sanitary work, all type of repair work, any type of road work etc.(except Horticulture work) as per DSR of 2023 for the period from 01.07.2026 up to 30.06.2028.(In SSE(Works) GTJT Jurisdiction) Zone- 05.
Zone 1 Ward No 1 se 10 aur mahwa road bypass tirahe se mandawara road pura, station road power house se railway line tak pura road aur railway line se gopal takij tak ak side devidar sahit work tender
Consultancy services for preparation of DPR for Construction of ROB/ RUB with approaches in lieu of Railway Level crossing No. 176 at Km 201/0-1 on Sri Ganganagar- Hanumangarh Railway section over Hanumangarh- Sri Ganganagar Road (SH-36)
Goods Transportation service - Monthly Based Service - Outside city within state; RAILWAY MATERIALS; Open Body Taurus, Goods Transportation service - Monthly Based Service - Outside city within state; RAILWAY MATERIALS; Tata Mahindra pick up van mini truck of minimum unladen weight 2025 Kg 2523 CC etc 4 seats
Providing and Fixing Street Light at 100 feet road (Railway Track Parellel) Shalimar Scheme, Alwar
Additional Work Constt of RUB at Km 103/9-10 HMGH-Dabli Rathan bhantinda Suratgarh Railway Section
Const of new Boundary Wall at Police Line, Bhilwara as per Master Plan Road along Railway Track
CONSTRUCTION OF RCC FOUNDATION FOR 2 NOS 132 KV RAILWAY BAY AT 220 KV GSS MORAK (KOTA)
Additional work of Remaining work construction of ROB (Excluding Railway Portion) for LC No. 38 at Baran
Construction of Sewer line from Chungi Chowki to Railway gate Napasar, Sub District-Bikaner (DLP 05 Years)