Loading…
Loading…
8,469 results • Best match
Open e-tender for the work of Barhawra-Maharajpur-Rehabilitation of bank/sub- bank by Cess repair or Senior Section Engineer/P.Way/Barhawra Under Assistant Engineer/New Farakka at KM (195.9-196.03DN,197.02-197.7DN,199- ... Engineer-I/Eastern Railway /Malda.
Open e-tender for the work of Different type of track activity like casual renewal of rail-sleeper-switch-SEJ-fittings, tamping of track, deep screening, assisting track machine etc with other ancillary works in Malda Town-New Farakka(EX) (UP & DN/L ... Engineer/I/Eastern Railway /Malda.
Open e-tender for the work of Different type of track activity like casual renewal of rail-sleeper-switch-SEJ, tamping of track, deep screening, assisting track machine, cleaning of drainage system etc. with other ancillary work at Jamalpur Diesel ... Engineer-III/Eastern Railway /
Supply, Installation, Commissioning and after sales service for Comprehensive (consecutive 3 years/36 months from the Date of Commissioning) for Automatic Water Logging Detection, measurement, reporting with mitigation System for vulnerable ... LHS/RUB/SUBWAYS/ Railway running ...
Open e-tender for P. Way work for 5.2 TKM plain track and 18 Nos. turnouts laying & linking including ancillary works in connection with yard remodeling of Bhagalpur station for extension of existing running lines to accommodate full- length goods ... Engineer-II/Eastern Railway /Malda.
Zonal work for General repairs and maintenance of service buildings, staff quarters and others new minor works etc at Dakshindari colony, Patipukur colony, Ultadanga colony from Dum Dum to Kolkata station in Circular Railway including Chitpur Yard, Dakshindari yard, Kolkata station area and Effluent treatment plant etc under Senior Section Engineer [Works] /Chitpur in the jurisdiction of Assistant Engineer / Ballygunge [Zone No. 32 for the period ending 30.06.2027].
Supply, Installation, Commissioning and after sales service for Comprehensive (consecutive 3 years/36 months from the Date of Commissioning) for Automatic Water Logging Detection, measurement, reporting with mitigation System for vulnerable ... LHS/RUB/SUBWAYS/ Railway running ...
AS PER NIT AND BOQ .
AS PER NIT AND BOQ.
Construction of new concrete road from office of Booth No-186 to railway line under Booth No- 186 Ward No-13 within Haldia Municipality (APAS)
DEVELOPMENT OF ROAD SURFACE INCLUDING TRENCH OF CANAL SOUTH ROAD FROM SOUTH SEALDAH B.P.S. TO RAILWAY OVER BRIDGE IN WARD NO-57 UNDER BR-VII.
Basudevpur Railway Crossing to Dakbungalow Road from 0.40 kmp to 5.20 kmp for Surfacing work under Murshidabad Highway Division No.I in the district of Murshidabad.
RENOVATION OF POND and RENOVATION OF B.T ROAD and PAVER BLOCK and DRAIN COVER SLAB AT PRAFULLANAGER RAILWAY PLOT ,ZAMINDAR PLOT at ward no 22.
PAINTING ON MEDIAN STRIPS FROM IRON ROAD RAILING FROM TOLLYGUNGE RAILWAY BRIDGE TO UTTAM KUMAR STATUE ALONG D.P.S ROAD IN WARD NO 089, BR-X
M/R to protection work on the left bank of river Mahananda at U/s of Gulma Railway Bridge in P.S. Pradhan Nagar Dist. Darjeeling.
URGENT REPAIRING WORK DUE TO LAND SLIDE OF FOOTPATH BESIDE WING WALL OF RAILWAY BRIDGE NO. 2 AT ANANDA PALIT ROAD IN WARD NO. 55
REPAIRING WORKS OF STREET LIGHTING SYSTEM AT RAILWAY LANE ROAD, DR. A.K. ROAD AND SURROUNDING AREAS IN WARD NO.138 UNDER THE KMC, BOROUGH-XV
M/R to protection work on the left bank of river Mahananda at D/s of Gulma Railway Bridge in P.S. Pradhan Nagar, Dist. Darjeeling.
Improvement of a road by paver blocks (ICBP) from BBT Road (Monginise Shop) to Railway Line and drainage grating of adjacent drain under Ward 28
SUPPLY AND DELIVERY OF LED FITTINGS AT SUBHAS PALLY, KAMDOHARI PURBA PARA, RAMKRISHNA NAGAR, RAILWAY CO-OPERATIVE, PEYARA BAGAN IN WARD NO. 111, BOROUGH-XI
Basudevpur railway crossing to Dakbungalow road from 0.00 kmp to 5.65 km surfacing work under Murshidabad Highway Division No-I in the district of Murshidabad.
Construction of pucca drain from Gunadhar Mandal house to Railway Crossing under Kusumpur GP within Contai III P S in the District of Purba Medinipur.
CONSTRUCTION OF URBAN HEALTH AND WELLNESS CENTRE AT DURGAPUR COLONY , NEW ALIPORE RAILWAY SIDING, KMC WARD OFFICE, NEW ALIPORE IN WARD NO-81, BR.-X.
Desilting of under ground drain inside Railway Track from Culvert No 3 4 5 6 to Rani Jheel Under HMC ward no 6 and 7HMC
Construction of Cement Concrete Road at K.G.R.S Bye Lane starting from K.G.R.S. Path upto Eastern Railway Line Dhar at Ward No 14 under Champdany Municipality.
Construction of Bituminous Road at at Jaffarpore Rifle Range Road starting from 17 No. Railway Gate and ending at Milan Park in Ward No. 2.
Construction of Black top road and with culvert from Fakrul Amins House to Railway culver of village Bishnudanga under Patkeldanga G.P at Sagardighi Block, Murshidabad
CONSTRUCTION OF CEMENT CONCRETE ROAD LEADING FROM RAILWAY PLATFORM NO.-II TOWARDS EAST UPTO NH 34 IN WARD NO 13 and 14 UNDER RAIGANJ MUNICIPALITY
P.C.C. WORK OF CONCRETE ROAD FROM RAMNITHARI YADAV TO RAILWAY SIDING, SRIKANTA TO ASHOKE MAHATO (ROAD RISING) UNDER HFA 2018-19 WITH IN HALISAHAR MUNICIPALITY
Improvement of road by Bituminous and allied work with drain at Laskar Para from Mohiary road to Railway pole under ward no-46. (Part-B)
Improvement of Open Surface Drain Khurigachi Road Bye Lane near Eastern Railway Line Dhar in Ward No 13 within Champdany Municipality under 15th FC fund.
Improvement of road by Bituminous and allied wqork with drain at Laskar Para from Mohiary Road to Railway pole under ward no-46 (Part-A)
Construction of vehicular underpass along with approaches below the proposed Railway line and DTPS Plant 1 x 800 MW of DVC at Durgapur West Bengal
Custom Bid for Services - Calibration Testing of Tools, Plants and Gauges at Loco Shed, Eastern Railway, Jamalpur for 03(three) years Similar Category Calibration Services
Helmet Mounted LED Light or Helmet Parts or Accessories (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7082940 Dated : 07-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Laboratory Glassware Bottles (Screw - Neck Bottles) as per IS 1388 (Part 1) (Q3) MSE Exemption for Years of Experience and Turnover
Industrial Kitchen Chimney (Q3) MSE Exemption for Years of Experience and Turnover
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local
High Pressure Portable Pump for large fire fighting as per IS 12717 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6685232 Dated : 15-09-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local
Ratchet Handle as per IS 7975 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6390258 Dated : 07-07-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 20 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Storage Type Electric Water Heaters (Geyser) (V3) ISI Marked to IS 2082 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6926572 Dated : 02-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Stationary Storage Type Electric Water Heaters (Geyser) (V3) ISI Marked to IS 2082 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reusable/Washable Cloth Face Mask (Q3)
Stationary Storage Type Electric Water Heaters (Geyser) (V3) ISI Marked to IS 2082 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7084070 Dated : 09-01-2026 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Ladder, Fire, Extension, 7.5m (Defence) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6204506 Dated : 06-05-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Estimated Bid Value 40000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Startup, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to their meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Non - Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6318045 Dated : 06-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 20 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Enamel paint remover (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6713887 Dated : 22-09-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Pneumatic Barrel Pump (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6599856 Dated : 28-08-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 20 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Aluminum Tape (Q3)
Folding Chair (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7079746 Dated : 06-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No