Loading…
Loading…
3,293 results • Best match
LT LINE AND OTHER WORK AS PER ESTIMATE IN ISLAMPURA WARD NO 03 AT JOBAT DIST. ALIRAJPUR
CONSTRUCTION FOR PROPOSED LT LINE AND DTR At SOHAGPUR TOWN FEEDER AT LOCATION RAMGHANJ UNDER SOHAGPUR TOWN
Balance work of Shifting 33 KV,11KV,LT Line DTRS from Narsinghpur to kerpani road Division Narsinghpur
Pole shifting and height raising of HT/LT Line at Khilchipura to Circuit House road Distt. Mandsaur
Pole Shifting and Height Raising Balance work of HT/LT Line at Sanjeet Naka ROB District Mandsaur.
Pole Shifting of HT/LT line From Nanded to Devli Road Tarana Distt. Ujjain. (Length - 5.00 Km.)
PROVIDING ZONAL TENDER FOR HT/LT LINE TRANSFORMER SHIFTING WORK UNDER WORK UNDER OUTER BALAGHAT DISTT. BALAGHAT.
Pole Shifting of HT/LT line From Madawada to Madawadi Road Khachrod, Distt. Ujjain. (L- 3.00 Km.)
Shifting of 11 KV and LT line at village Giltora affected by submergence of Hanota Irrigation Project.
Shifting of HT and LT line on Old National Highway Town area Mauganj Rewa Distt. Rewa (M.P.)
Pole Shifting of HT/LT line From Banjari to Meend Road Khachrod, Distt. Ujjain. (L- 4.00 Km.)
Pole Shifting of HT/LT line From Nadiyasi to Bhuwasa Road Khachrod, Distt. Ujjain. (L- 2.20 Km.)
Providing Zonal Tender for HT/LT Line Transformer Shifting and Maintenance Work Under Seoni Section Distt. Seoni..
Estimate for Rep.of LT line Cable at village Dimawar under Bhairunda D/c Under (OandM) Dn. Bhairunda
Providing of Pole Shifting work for LT line at Engineering College Section to I-type Qtrs Ujjain
Estimate for Rep.of LT line Cable at village Babri under Bhairunda D/c Under (OandM) Dn. Bhairunda
LT Line Extension and Electric Maintenance Work in Addition vegetable Yard, Behind Main Mandi Grain Yard Ratlam
Lt line cable with auto timer switch for street light of various ward under nagar parisad manpur
Repair work of 250Watt HPSV fitting and LT Line at Dam Site, Jobat Project ,Nanpur Distt- Alirajpur
Pole Shifting of HT/LT line For Kapileswhar Mahadev Approach Road, Badnagar Distt. Ujjain. (Length - 1.15 Km.)
LT Line Shifting work at Ward No. 09 near Lodhi Kuiya under municipal council chhatarpur (II CALL)
100 and 11 K.V. in front of Savarkar Bal Bihar. TRANSFARMER, LT. Line Shifting Work. (Two pieces)
LT line P.S. OF 10 NO. IRR. PUMP CONNECTION 50 HP LOAD AT VILLAGE BILJHAR RAWTALA FALIYA
Pole Shifting 33 KV/11 KV, LT line and Transformer Shivpur Road ROB Seoni Malwa Dist narmadapurm
survey, installation,testing and commissioning of 11kVline,11/0.433kV distribution transformer and LT line under different schemes
Pole Shifting of HT/LT line For Makdawan Railway Station Approach Road, Distt. Ujjain. (Length - 1.50 Km.)
MAINTENANCE OF LT LINE AND DOMESTIC POWER SUPPLY TO PAP,S IN REHAB AREAFOR THE TWO YEARS (2020-2022),NTPC Rihand
Shifting of LT/HT Line coming in the route of Patelpura Lafangaon Panchayat to Bakhad Salitanda Road Distt. Barwani.
CONSTRUCTION OF KARADIYA VIA JESLIYA TO CHAYAN ROAD LENGTH 1.60Km. WITH shifting LT/HT line UNDER SUB DIVISION BADNAWAR
Shifting of LT/HT Line coming in the route of Palsud Mall to Bhaisava Road Distt. Khandwa. (5.00 Km.)
External Electrification work for Regional Forensic Science Laboratory (RFSL) at Ratlam (1x100 KVA Transformer 11/0.433KV with HT line)
Shifting of LT/HT Line coming in the route of Bherubhalla Aashram Pana Phata Lohari Khurd Road Distt. Dhar.
Shifting of LT/HT Line coming in the route of Dabhiyakheda to Badi Tanda Via Badikheda Road Distt. Burhanpur.
SHIFTING AND DISMENTALLING OF 33/11 KV HT LINE AND POLE WORKS AT SCHEME NO. 151 SUPER CORRIDOR INDORE
Supply ,installation,testing and commissioning of 200KVA transformer and 11kv HT line etc complete at kamal kundi water wax
DISMENTALING AND SHIFTING OF 33/11 KV HT LINE WORKS AT SCHEME NO. 59 PLOT NO.114-115 INDORE
Construction of Sadalpur to Govindpura Road Length 3.60 K.m Including LT/HT Line Pole Shifting Under Sub Division Badnawar
DISMENTALLING AND SHIFTING OF 33/11 KV HT LINE WORKS AT ISBT SCHEME NO. 139 MR-10 IDA INDORE
Shifting of LT/HT Line coming in the route of Panchderiya to Imlikheda (Bhawani Mata Mandir) Road Distt. Indore.
Construction of Beganda to Gardawad Bakurli Road length 8.25 km I/c LT/HT Line Pole Shifting. (Second Called)
SHIFTING AND INSTALLATION OF 33/11 KV HT LINE IN SCHEME NO. 172 NEAR SUPER CORRIDOR AIRPORT CHOURAHA INDORE
External Electrification work for 20 G.O. Qrts., DRP Line Ujjain (11/0.433 KV, 1x200 KVA Transformer with HT line)
For shifting of 11 KV and LT line due to construction of Bridge on Nevaj river in Village Jawar Tehsil Ashta District Sehore
Estimate for providing 12 No. 200 Kg. 9.00 Mtr. long Mid Span pole for 11 KV line at various locations under Ambada D/c under (O and M) Betul North Division in Betul Circle
Bifurcation of 11 KV Kawdiya feeder from 33 by 11 KV Sub Station Nawapur in Bhainsdehi Dc 11 KV Line 7 Km, 11 KV DP 08 No, 11 KV BAY with VCB 01 No
Estimate for public experiment of 1x25 KVA DTR and 11 KV Line At Village Hiwerkhedi (Mangal Dhurve Ke Khet ke Pass ) Under Khedi Dc in O and M Dn Betul (S) in Betul Circle.
Estimate for 01 No. New 33/11 KV S/s Mehdwa with 33 KV and 11 KV line for the bifurcation of load existing Gorai S/s under Ron D/c under Lahar Division.
Estimate for extention 11 KV line on H-Beam with 63 KVA DTR to Provide PS of Existing 12 no. conn. at Village Girgaon (Shishupal Singh ka pura ) under Morar Dc (OnM) Division Gwalior
Revised Estimate for shifting of 11 KV Line and New 25 KVA DTR Installation for Gaushala Parishar, Magardha under full Deposit scheme at Magardha under Sirali D/c under O and M Division Harda
Estimate For Extension Of 11 KV Line and 63 KVA DTR For 24 Hours Railway Station Power Supply Under Full Deposit Scheme At Village Barangi Railway Staion Under Masangaon D/c OandM Dn Harda.