Loading…
Loading…
271 results • Best match
Removal of Water Stagnation by Laying of CC Road from Pochamma Temple to HT Line Road in Ward No 249 Kukatpally of Kukatpally circle-52,KPZ,CMC
Erection of 9.785KM new 33KV line from 132/33 KV Choutuppal EHT SS to Aepur cross road, Gundrampally (V), Chityala (M) for bifurcation of loads on 33KV Veliminedu feeder in Nalgonda Division in Nalgonda Circle
(i). Erection of 3.30 KM 33KV interlinking line with erection of 3no. M+6 GI Towers between 33KV Bhupalapally Town tapping to 33/11KV SS Jangeedu of Bhupalapally Town Section in Bhupalapally Division, (ii).Erection of 10.10 KM 33KV interlinking line ... KM 33KV line from ...
Bifurcation of 33KV Thogarrai feeder emanating from 132/33KV Ramapuram EHT SS by erection of 9.51KM new 33KV line from 132/33KV Ramapuram EHT SS in Kodad Rural section of Kodad sub-division in Huzurnagar Division of Suryapet Circle.
Bifurcation of 33KV B.N.Thanda feeder emanating from 132/33KV Mattampally EHT SS by erection of 8.6KM new 33KV line from 220/132/33KV Mutyalanagar EHT SS in Huzurnagar section of Huzurnagar sub-division of Huzurnagar Division of Suryapet Circle.
Erection of 11.93 KM new 33KV Interlinking line & 0.83KM restringing of 11KV line from PR Cements (33KV Mellacheruvu- Dondapad feeder) to 33/11KV Kistapuram SS to divert 1No. 5MVA PTR load from 33/11KV Malkapuram SS Sub-Station emanating from 33KV Dondapad feeder of 132/33KV Ramapuram Sub-Station to 33KV Raghunathapalem feeder emanating from 132/33KV Mattampally Sub-Station for bifurcation of load on 33KV Dondapad feeder and as well for providing alternate source to 33/11KV Kistapuram SS in Mellacheruvu Section in Huzurnagar Division of Suryapet Circle.
Bifurcation of existing 11KV Dyna Tech feeder emanating from 33/11KV Cherlapally I SS by erecting 0.950 KM of new 11KV line which includes stringing of 11KV SCOH line with 55Sq.mm AAA conductor for a distance of 0.6KM and laying of 350Mtrs of 11KV 3X185 Sq.mm XLPE UG Cable D/R and along with bay extension and erection of 1No. 11 KV feeder VCB at 33/11KV Cherlapally I SS in Cherlapally IDA-II Section of Cherlapally Sub-Division of Sainikpuri Division in Habsiguda Circle under T and D Improvements to original works under Summer Action plan-2024-2025
Construction of Storm water drain from Chatrapathi Shivaji Nagar to Great gods temple church HT line road, Shamshiguda in Allwyn colony in ward no. 124 of GHMC, Kukatpally Circle-24 (New Circle-51) 1st Re-call
Supply and Erection of 2 Nos of 11KV Double Pole Structures with 9.1 M PSCC Pole for cut of the HT Line one at Common Mess, KU and an additional one at back side of Sericulture Department, KU Campus, Warangal
Erection of an interlinking line between 33KV Rebarthy feeder emanating from 132/33KV SS Musthyala at 33/11KV SS Rebarthy in Maddur section and 33KV Dhoolmitta feeder emanating from 132/33KV SS Musthyala at 33/11KV SS Bairanpally in Dhoolmitta ... of 33 KV line with ...
Providing of 4th alternate source to 33/11kV Asifnagar SS from 132KV Seetarambagh SS by laying of 2.37KM of 3X400Sq.mm. XLPE UG Cable (Single Run) from the EHT SS and extending upt the now proposed 4-pole structure at near Gowtham Model School duly ... existing 33KV line of ...
Recall Tender for Bifurcation of 33KV Kodair feeder emanating from 220/33KV Singotam SS which involves stringing of 12.7KM of new 33KV line 100sqmm conductor over now proposed 11mtrs and 9.1mtrs poles and existing 185Nos. 9.1mtrs poles in operation section Kodair of Kollapur Operation Sub-Division of Nagarkurnool Division and Circle. WBS No: T-2530-35-06-01-01-002
Erection of an interlinking line between 33KV Gurujakunta feeder emanating from 132/33KV SS Musthyala EHT SS (at 33/11KV SS Arjunpatla) in Dhoolmitta section and 33KV Narmetta feeder emanating from 132/33KV SS Palamakula (at 33/11KV Ankshapur) in ... of 33 KV line with ...
Bifurcation of 33KV Madanpally feeder emanating from 132/33KV Vikarabad EHT SS by erection of 3.915KM new 33KV line from 132/33KV Vikarabad EHT SS to Indian Dhaba (Kothagadi) which involves by stringing of 3.655KM 33KV SCOH line with 100sq.mm AAA conductor and Laying of 0.26KM 33KV 3X400sq.mm XLPE UG cable in Vikarabad Town Section of Vikarabad Sub-division in Vikarabad Division of Vikarabad Circle
Construction of missing links/ slip roads in Hyderabad City for Package A2 on a) Corridor No. 50: Hitech Citi Phase 2 to Gachibowli- Inorbit road (length 0.56 km) b) Corridor No. 66: New Allahpur to 100 ft road adjacent to Sunnam cheruvu (length 0.84 ... under HT line (length ...
Bifurcation of loads from 33KV Mannapur feeder emanating from 132/33KV Zaheerabad EHT SS by erection of 12.25KM 33KV line from 132/33KV Zaheerabad EHT SS to 33/11KV Mannapur SS which involves laying of 0.25KM 33KV 3X400sq.mm XLPE UG cable (Double Run) and stringing of 12KM 33KV SCOH line with 100sq.mm AAA conductor over now proposed 12.5Mtrs/11Mtrs Poles in Mannapur Section of Zaheerabad Town Sub-Division of Zaheerabad Division in Sangareddy Circle under T and D Improvements to original works (Summer Action Plan-2026)
Construction of missing links/ slip roads in Hyderabad City for Package B1 on a) Corridor No. 3: Miyapur Metro depot to Kondapur Masjid Jn. (via IDPI Employees colony, Srila Park Pride road) (length 1.80 km), b) Corridor No. 8: Shaikpet Dargah Jn. ... under HT line (length ...
Construction of missing links/ slip roads in Hyderabad for Pkg-A1 on a) Corridor No.1: Nizampet X roads to Hitex Jn.(via Vasanth nagar and NAC) and Link road(2.20 km), b) Corridor No. 2: Link road from HT line to Miyapur road(1.00 km), c) Corridor No. 6: Bharat nagar ROB to Hitex Road(via Mothinagar, Borabanda Aurobindo LuLu mall, Ghousia Masjid) (0.70 km), d) Corridor No. 13: Madhavi Hills to Narnie Road via Came-lot (0.16 km), e) Corridor No. 16: GHMC Serlingampally Zonal Office to NH 65 @ GSM mall (Via Manjeera pipe line road) (2.70 km), f) Corridor No. 18: Botanical Garden Road (Kondapur) to Hafeez Railway track via JV Hills(0.73 km),g) Corridor No. 24: Link road near Bio Diversity(0.13 km), h) Corridor No.26: Old Bombay Highway to Delhi Public School via Engineering Staff College(2.30 km), i) Corridor No. (Part of 29&32): Old Bombay Highway to Khajaguda road via Malkam Cheruvu & Chitrapuri Colony(0.78 km), j) Corridor No. 42:Link road from NAC to KPHB Road(0.90 km)(2nd call)
PACKAGE NO.2 : (1) Strengthening and Laying of BT roads at Baghameeri & at Vishal towers in ward no 122 of GHMC, Kukatpally Circle-24, (2) Re-carpeting of BT road from Vivekananda Nagar colony main road in Ward no. 122 of GHMC, Kukatpally Circle-24, ... ( HT line road) ...
PVC Aluminium Cable 1 Core and Multi Core Circular Sheathed Cable with Rigid Conductor as per IS 694 (Q3), LED Tube Light (Retrofit Type) (Q2), Cable Joint Kit (V2) (Q3), Contactor ML2, ML3 with Auxillary Contact, Steel Wool, Lead Wool, Contactor ... for HT Line , ... for LT Line , ...
Cable Joint Kit (V2) (Q3), LED Tube Light (Retrofit Type) (Q2), Porcelain Pin Insulator for HT Line 11000Volts, Porcelain Pin Insulator for LT Line 1100Volts, Single Phase Preventer Relay, 3P Neutral Switch fuse unit 32 Amps, 3P Neutral Switch fuse unit 100 Amps, 3P Neutral Switch fuse unit 200 Amps, Metal Clad Socket 230 V 10 Amps, Metal Clad Socket 230 V 20 Amps, Metal Clad Plug Top 230 V 10 Amps, Metal Clad Plug Top 230 V 20 Amps, Cable Heat Termination kit Outdoor Heat Shrinkable 120 Sqmm, Contactor ML2 with Auxillary Contact, ML3 with Auxillary Contact, Contactor with Auxillary Contact 3P, Gang Box, Casing and Caping, Anglar Lamp Holder, Pendent Lamp Holder, Aluminum Lugs 2.5 Sqmm, Cable Heat Termination kit Outdoor Heat Shrinkable 95 Sqmm, Three Core 04 Sqmm Flat Submersible Cable, Three Core 06 Sqmm Flat Submersible Cable, Three Core 10 Sqmm Flat Submersible Cable, Three Core 16 Sqmm Flat Submersible Cable, UV stabilized pure polyester coating LED Garden Light Pole Base, Foot Light 03W, 25W LED Spike Light, 10W Bollard Garden Light Sturdy IP67, dome 92mm spitog dia with height 140mm, Spot light with power 6W, Spot light with power 3W, LT Tape 15m, LT Tape 20m, LT Tape 25m, Single Door CRCA MCCB Metal Powder coated Box FP size 75X75X50mm, CRCA MCCB Metal Powder coated Box, FP 100 Amp, CRCA MCCB Metal Powder coated Box, FP 125 Amp, CRCA MCCB Metal Powder coated Box, FP 160 Amp, CRCA MCCB Metal Powder coated Box, FP 200 Amp, CRCA Juction box size 240x180x15mm, Main Switch, On-Load Changeover Switch with Four Pole 100A, On-Load Changeover Switch with Four Pole 200A, Galvanised mild steel step pole for Post top lantern, 60W Pole Top, Flush Mouting Modular PVC AC Box, Stailnessteel Water Geyser Steel Tank, Non-Modular Type Gang Box, MCB FP 100Amp, Bipin Holder, Transformer Oil, Steel Woo, Lead Wool Bid Details 2/51