Loading…
Loading…
5,870 results • Best match
Proposed work of Construction HT/LT Line and double pole and other work due to Releasing Connection to various Payjal Nalkoop under Deposit Scheme at various places in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
CONSTRUCTION OF HT LT LINE ALONG WITH DP OF 100 250 400 KVA TF FOR GIVING ELECTRICAL CONNECTION TO VARIOUS CONSUMERS LOAD ENHANCEMENT SHIFTING OF LINE AND NEW INFRA DEVOLEPMENT UNDER THE DEPOSIT SCHEME
Resagging of loose HT/LT line conductor, strenthening of loose and tilted stay and repairing and grouting of damaged/rusted S.T. Pole of EDSD Ayodhya Related Mela Area Under Electricity Distribution Division-Ist, Ayodhya
work of LT Line jarjar tar etc work Business Plan Scheme 2024-25 Part-2 in the Area of EE, EUDD-V and EUDD-IX Ghaziabad. Under the jurisdiction of SE, EUDC-I, Ghaziabad.
For 11 KV LT Line Pole shifting from Richaula to Gajraula baya mala colony and Pilibhit Puranpur road to Kanja Sarriya baya Ajitpur Sahrai under EDD Pilibhit in fully deposit scheme for road widening.
work of Repair/Maintenance /Replacement of HT/LT line/distribution Transformers for safety during proposed kanwad yatra 2025-26 in the area of EUDD-X, Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
work of Repair/Maintenance /Replacement of HT/LT line/distribution Transformers for safety during proposed kanwad yatra 2025-26 in the area of EUDD-VII, Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
Work of repair and replacement HT/LT line for safety during proposed kanwad yatra 2024-25 Under SDO-I, in the area of EUDD-IV Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
work of Repair/Maintenance /Replacement of HT/LT line/distribution Transformers for safety during proposed kanwad yatra 2025-26 in the area of EUDD-IV Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
Proposed work of Construction HT/LT Line and double pole and other work at various places in the area of EDSD-Govindpur/Goverdhan, Mathura under Business Plan in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Work of repair and replacement HT/LT line for safety during proposed kanwad yatra 2024-25 Under SDO-I, in the area of EUDD-VII Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
work of Repair/Maintenance /Replacement of HT/LT line/distribution Transformers for safety during proposed kanwad yatra 2025-26 in the area of EUDD-Khoda, Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
Quantum of work involved in replacement of damaged pole and HT/LT line in the area of Safipur and Bangarmau Tehsil, Unnao due to heavy storm (Daiviya Apda) occurred from dated 13.05.2018 to 12.06.2018.
Quantum of work involved in replacement of damaged pole and HT/LT line in the area of Bhighapur and Purwa Tehsil, Unnao due to heavy storm (Daiviya Apda) occurred from dated 13.05.2018 to 28.06.2018.
Proposed work of Construction HT/LT Line and double pole and other work at various places in the area of EDSD-Govindpur/Goverdhan, Mathura under Deposit Scheme in jurisdiction of E.D.D.-IV,Goverdhan, Mathura
Proposed work for Maintenance of Damaged 33KV, 11KV, LT Line due to (Brunt Cable, Theft and M and R Work) at various place under EDSD-Govindpur in the jurisdiction of E.D.D. IV, Goverdhan, Mathura
Proposed work of Construction HT, LT Line and double pole and other work at various places in the area of EDSD-Govindpur/Goverdhan, Mathura under Business Plan in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Proposed work for Maintenance of Damaged 33KV, 11KV, LT Line due to (Brunt Cable, Theft and M and R Work) at various place under EDSD-Goverdhan in the jurisdiction of E.D.D.-IV, Goverdhan, Mathura
For Cutting of the Tree branches of 33/11 KV/LT Line in the area of Electricity Urban Distribution Sub-Division-II, Krishna Nagar, Mathura Under Executive Engineer, Electricity Urban Distribution Division-I, Mathura.
11 KV LT AND HT LINE SHIFTING FROM LUCKNOW-DELHI-MURADABAD RAIL LINE BETWEEN NIGOHI AND TILHAR ON RAILWAY SAMPAR NUMBER 334 B, 2 LANE BRIDGE, IN FULL DEPOSITE HEAD UNDER EDD-TILHAR UNDER EDC SHAHJAHANPUR (MVVNL
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) ( ( 3 3 ))
Annual Maintenance Service - Desktops, Laptops and Peripherals - Desktop PC; hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - All In One PC; hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer ( Ink Jet, Mono and Colour, Lower Range ); hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer (Monochrome, Laser, Composite Cartridge ); hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer ( Ink Jet, Mono and Colour, Mid Range ); hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Printer ( Ink Jet, Mono and Colour, High Range ); hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - Scanner; hp, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Online 2 KVA); Microtek, Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS( Offline 1 KVA); Microtek
Shifting of HT/LT Line and other Electric System for making of Service Road around Goverdhan Parikrma Marg by Prantiya Khand Lok Nirman Vihag, Mathura under Deposit Scheme in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
The work of Construction HT/LT Line and Double Pole and other work for releasing new connection at various places under Deposit Scheme at the area of EDSD-Baldev in jurisdiction of E.D.D.-Ist, Mathura
For Replacement of damage 33 KV, 11 KV and LT line pole in Exposer and straightening of tilted pole in the area of Substation Mahanagar ITI Nirala Nagar and Kapurthala EUDD Mahanagar Transgomti LESA Lucknow
For Construction of HT LT line and substation Shifting of line and pole in the area of EUDD University against Deposit head FY 2024 25 under the jurisdiction of SE EUDC MAHANAGAR Transgotmi LESA Lucknow
Supply Erection testing and commissioning of 03 Nos 16 Mtr LED High Mast Lighting system with 08 Nos LED fitting and cabling work Shifting of damage pole Repairng of LT line etc at NMY Duddhi
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to (Brunt Cable, Theft and M and R Work) at various place under EDSD-Barsana/Goverdhan in the jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Resagging of loose HT/LT line conductor, strenthening of loose and tilted stay and repairing and grouting of damaged/rusted S.T. Pole of EDSD Ayodhya and Different type work Under Electricity Distribution Division-Ist, Ayodhya
Supply Erection testing and commissioning of 03 Nos 16 Mtr LED High Mast Lighting system with 08 Nos LED fitting and cabling work Shifting of damage pole Repairng of LT line etc at NMY Duddhi
For construction of 11 KV and LT line for Jhalas from the region of Makrandapur Choraha Makrandapur Jaisahi Nagar Madhwapur, Baesahi Nagar Basae on 11 KV Madhwapur feeder at Dueria SS Pilibhit under EDD Bisalpur.
Proposed work of Construction HT/LT Line and double pole and other work at various places in the area of EDSD-Kosi/Chatta/Choumuha, Mathura under Business Plan in jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
Maintenance work of 11 and LT Line and replacement of damage 11 KV or 33 KV Cable jointing kit and other work in the area of EDSD-Deoband I and Deoabnd IInd under EDD Deoband
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Additional 11 KV DTR Installation, extension of LT Lines and LT Line Augmentation works under Business Plan 2026-27 agains..
Quantum of work involved in replacement of damaged pole and HT/LT line in the area of Electricity Distribution Division-I, Unnao and Electricity Distribution Division-II, Unnao due to heavy storm (Daiviya Apda) occurred
Replacement of bare conducter by New AB Cable of LT Line of 400 KVA T/F No-20 Vinod Aata Chaki and 25 KVA T/F No-1 in Yamunapuram colony, Uner EDD-II, Bulandshahr
Schedule of rates and quantum of work for providing amn power (gang) for maintenance of HT/LT line at 33/11 KV S/S, Maurawan and operation of 33/11 KV S/S Sonik, Unnao
Shifting of 11 KV/LT Line due to construction of overbridge at Lal Phatak fed from 11 KV Lal Phatak Feeder of 33/11 KV S/s Kandharpur under EDD-II, Bareilly (Full Deposit Scheme)
Installation of New 63 KVA Transformer at Zila Panchyat Parisar Ayodhya and 11 KV HT line over head with 63 KVA Transformer to ITMS System Control room in Appar Nagar Aayukt Ayodhya Under Electricity Distribution Division Ist, Ayodhya
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in EDSD Bisalpur under EDD-Bisalpur
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in EDSD Bilsanda under EDD-Bisalpur.
For the work of giving various types of new connections (EV charging, Jaljeevan mission etc.) to consumers and 33/11 KV LT/HT line shifting related and other work through running contract in EDSD- Madhotanda under EDD Puranpur.