Loading…
Loading…
5,870 results • Best match
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in EDSD- Ghunchai under EDD-Puranpur
For the work of giving various types of new connections (EV charging, Jaljeevan mission etc.) to consumers and 33/11 KV LT/HT line shifting related and other work through running contract in EDSD Barkhera under EDD-Bisalpur
Construction HT line and Double Pole for giving connection to M/s Bhagwati C/o Sri Jai Prakash Agrawal Vaidayhe Nagar Sahab Ganj, Ayodhya, Giving New Connection of 40 KVA to Pariyojana Prabandhak U.P. Jal Nigam Ayodhya etc.
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Refer to Tender Description
Proposed work of Construction HT/LT Line and double pole and other work at various places in the area of EDSD-Chatta, Mathura under Business Plan/Vyapar Vikas Nidhi in jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
Resagging of loose HT/LT line conductor, strenthening of loose and tilted stay and repairing and grouting of damaged/rusted S.T. Pole at area of Sub-Division -Gosaiganj under Jurisdiction of Electricity Distribution Division-IInd, Ayodhya
Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2023-24 Under SDO-I, Rajendra nagar in the area of EUDD-IV Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
For Construction of HT and LT line and substation, Shifting of line and pole in the area of EUDD University against Deposit head F.Y.2024-25 under the jurisdiction of S.E. EUDC Mahanagar, Jankipuram zone, Lucknow
Work of repair and replacement HT/LT line for safety during proposed kanwad yatra 2024-25 Under SDO-II and III in the area of EUDD-IV Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
Shifting of 33 KV, 11 KV and LT Line by underground double circuit cable at Panch Kosi Parikarma Marg from Prahalad Ghat to K.B. Institute at 33/11 Substation Amaniganj Under Electricity Distribution Division-Ist, Ayodhya
CONSTRUCTION AND OF 11 KV HT LT LINE OF EO NAGAR PALIKA RAEBARELI SEWAGE PUMPING STATION ZONE-2 AND EO NAGAR PALIKA RBL SEWAGE PUMPING STATION ZONE-4 AWAS VIKAS INDIRA NAGAR RAEBARELI UNDER EDD RAEBARELI.
Shifting of 33 KV, 11 KV and LT Line by underground double circuit cable for Panch Kosi Parikarma Marg Prahlad Ghat to Ram Ghat from 33/11 substation Nirmochan Ghat Under Electricity Distribution Division-Ist, Ayodhya
Proposed work of Construction HT/LT Line and double pole and other work at various places in the area of EDSD-Choumuha, Mathura under Business Plan/Vyapar Vikas Nidhi in jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
Proposed work of Construction HT/LT Line and double pole and other work at various places in the area of EDSD-Aurangabad/Farah, Mathura under Business Plan/Vyapar Vikas Nidhi in jurisdiction of E.D.D.-Ist, Mathura
Work of Sifthing of 11 kv lines, plinthing, fencing and earting of 160 KVA Transformer, change LT line To Cable and stablish the transformer in different places in area of EDC Kannauj in Bussiness plan scheme
Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2023-24 Under SDO-I, Patel Nagar in the area of EUDD-VII Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
The Work for Construction HT/LT Line and double pole and other work at various places against Various Sanction Packages Under Business Plan at the area of EDSD-Baldev in the jurisdiction of E.D.D.-Ist, Mathura
Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2023-24 Under SDO-II, Rajnagar extension in the area of EUDD-VII Ghaziabad. under the Jurisdiction of SE, EUDC-III, Ghaziabad.
FOR EXECUTION OF VARIOUS WORK FOR MAKING LT LINE WITH NEW POLE WITH LYING OF XLPE/AB CABLE REPLACING OPEN AND JURJAR LINE BY AB CABLE AT DIFFERENT PLACES IN EDD 2 SHAHJAHANPUR UNDER EDC SHAHJAHANPUR.
Resagging of loose HT/LT line conductor, strenthening of loose and tilted stay and repairing and grouting of damaged/rusted S.T. Pole of 33/11 KV Sub-Station Mumtaj Nagar Under Electricity Distribution Division-Ist, Ayodhya
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in fully deposit scheme under EDD-Pilibhit
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related works through running contract in fully deposit scheme under Electricity Distribution Division Pilibhit
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related works through running contract in fully deposit scheme under Electricity Distribution Division-Bisalpur
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related works through running contract in fully deposit scheme under Electricity Distribution Division-Puranpur
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in fully deposit scheme under EDD-Bisalpur
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in fully deposit scheme under EDD-Puranpur
Work for attending and rectification of faulty 33/11/LT Line and pole to resume supply interrupted due to natural calamities ( Cyclone, heavy rain etc) in coming summer in the area of SDO-1, EDD-IV, Jaunpur.
Work for attending and rectification of faulty 33/11/LT Line and pole to resume supply interrupted due to natural calamities ( Cyclone, heavy rain etc) in coming summer in the area of SDO-II, EDD-1, Jaunpur.
Various type Repairing and Maintenance work of HT LT line and substation and other associated Running work in the work area of Assistant Engineer 11KV and LT GPRA of 33 11 KV SS SRISHTI and INTEGRAL UNIVERSITY
Resagging of loose HT/LT line conductor, strenthening of loose and tilted stay and repairing and grouting of damaged/rusted S.T. Pole at area of Sub-Division -IIIrd Bikapur under Jurisdiction of Electricity Distribution Division-IInd, Ayodhya
Work for attending and rectification of faulty 33/11/LT Line and pole to resume supply interrupted due to natural calamities ( Cyclone, heavy rain etc) in coming summer in the area of SDO-II, EDD-IV, Jaunpur
For Construction of HT LT line and substation Shifting of line and pole in the area of sub division Mahanagar against Deposit head FY2023 24 under EUDD Mahanagar in the jurisdiction of SE EUDCVI Transgomti LESA Lucknow
The Work of Construction HT/LT Line and Double Pole and Other Work at the area of EDSD-Baldev at the area of S/s Madora/Baldev Under Deposit Scheme in the jurisdiction of E.D.D.-Mathura Rural
Resagging of loose HT/LT line conductor, strenthening of loose and tilted stay and repairing and grouting of damaged/rusted S.T. Pole at EDSD Ayodhya at Related Samrasta Kumbh in Ayodhya Under Electricity Distribution Division-Ist, Faizabad
Resagging of loose HT/LT line conductor, strenthening of loose and tilted Pole and Binding and grouting of loose stay EDSD Fesu-2 at 33/11 KV Sub-Station Mumtaj Nagar Under Electricity Distribution Division-Ist, Faizabad
for the shifting of 11 KV/LT line from yodha chowk to roman catholic church due to widening of road in the full deposit scheme in the area of Executive Engineer, Electricity Urban Distribution Division-I, Mathura
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Guarding, Earthing at Goverdhan Town due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2019 Under E.D.D.-IV, Goverdhan, Mathura
Shifting of 11 KV HT line over head under ground Double Circuit as Per request of Executive Engineer, Nirman Khand PWD Ayodhya and as Instruction of Executive Engineer EDD-Ist, Ayodhya in NH-24 Bypass Mohbara Bazar to Near Langarveer Chauraha
Shifting of 11 KV HT Line overhead by Underground double Circuit as per request of Executive Engineer, Nirman Khand PWD Ayodhya as per instruction of Executive Engineer, EDD-Ist, Ayodhya at NH 24 bypass Mohbara Bazar to Near Langarveer Chauraha
For the work of giving various types of new connections EV charging, Jaljeevan mission etc. to consumers and 33 11 KV LT HT line shifting related and other work through running contract in Electricity Distribution Sub-Division, PPN under EDD-PPN
New Under ground 33 KV Single Circuit Niyawan HT line with 33 KV 3x300 Sqmm XLPE Cable in (Near Ranopali Railway Crossing Near Booth No. 04) at 132/33 KV Sub-Station Darshan Nagar Ayodhya Under Electricity Distribution Division Ist, Ayodhya
Refer to Tender Description
Refer to Tender Description