Loading…
Loading…
5,870 results • Best match
Construction of 33 KV line for the seperation of 33/11 KV Sub-Station KAIRANA DEHAT (Distt. Shamli) from 132 KV Sub-Station KAIRANA.
Various work of 33 KV line and installation of new distribution transformers under Business Plan 2024-25 (Part-2) on Semi Turn Key Basis.
BUSINESS PLAN 2026-27 WORK OF 33 KV line STRENTHING IN THE AREA OF EUDD 33 KV GHAZIABAD -1 UNDER THE EUDC-1 GHAZIABAB
For the work of 33 kv line strengthening under the head Business Plane-2026-2027 under Distribution Division-Shahjahanpur, Tilhar and Chinor. District Shahjahanpur
Replacement of Damage LT Line and Conductor
HT and LT Line Tree Chopping Work
HT and LT Line Tree Chopping Work
Deposite work in 11kv and LT Line
Deposite work in 11kv and LT Line
Shifting of 33KV Line in deposit scheme in area of EDD-II Hapur
Underground/Shifting work of 33KV Line near village Karuraiya under EDD-III, Mainpuri.
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD KAILASHPUR
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD KAILASHPUR
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD ITI.
Work of 11 KV line for WTP Agarhunda IBPS Ramnagar, Karaundikala, Raipura gunta dam Agarhunda (Full Deposit Scheme) Under EDD-RAJAPUR
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD KAILASHPUR
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD KAILASHPUR
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD Kailashpur.
For Shifting of LT and 11 KV Line at Hafijganj-Senthal-Jadaupur Road due to Road Widening under EDD-I, Bareilly
VARIOUS ELECTRICAL WORK DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT DISTRIBUTION TRANSFORMER INSTALLMENT STRENGTHENING OF 11 KV LINE NEW AND RAPAIRING OF LT LINES
Work in BP 2024 25 for construction of 11 KV line and Strengthening work under EE EDD I and II Orai
work of the full deposit sceem to Street Light for New 11 KV line to be constructed town of EDSD ITI.
For Construction of New/Bifurcation of 11 KV Line etc at Various Places under B.P 2026-27 under EDD-Baheri, Bareilly
WORK OF THE INSTALLATION OF LT S/S AND ASSOCIATED 11 KV LINE IN THE JURISDICTION OF THE EDD-I LONI
Maintenance and Repairing of 11 KV Line of Nandpur Feeder emanating from 33/11 KV S/S Raipur Under EDD-Behat
Replacement of dilapidated ABC cable dilapidated wire installed on LT line under work plan of Rs.20.00 cr. allocated for system strengthening work under Additional BP 2023-24 in EDD-II, MGS. on Semi-Turn-Key Basis.
Various electric works on Turn key Basis for shifting of LT line, Transformer, Panel and other associated infra due to Road Widening Between Shri Krishna Janm Sthan Gate No 03 to Thana Govind Nagar (Under Full Deposit)
Proposed work for Maintenance and Replacement of Damaged 33KV, 11KV, LT Line and other associated infra due to Daviya Aapda at various place in the area of EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
For Maintenance Work of HT/LT Line before Kanwar Yatra 2023 to Avoid any Electrical Accident in the Area of EUDSD-VII, Kankarkhera, Meerut (From Modipuram To Shobhapur Village Crossing By Pass Road) Under EUDD-IV, Meerut.
For the Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2022-23 Under SDO-II Rajnagar extension in the area of EUDD-VII Ghaziabad. under the Jurisdiction of EUDC-III GZB.
For Maint. of LT Lines with Re-Sagging of Loose LT Lines, Providing, Fixing LT Line Bamboo Separators, Providing and Binding of Polythene Sheets on the Poles, Strengthening of Poles with Misce. Works Under EUDD-III, Meerut.
For the Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2022-23 Under SDO-I, Patel nagar in the area of EUDD-VII Ghaziabad. under the Jurisdiction of EUDC-III GZB.
For Maintenance Work of HT/LT Line before Kanwar Yatra 2023 to Avoid any Electrical Accident in the Area of EUDSD-XII, Ganga Nagar, Meerut (From Commissionery Chowk To Village Saini Mawana Road) Under EUDD-IV, Meerut.
SHIFTING and DISMANTALING OF 11 KV and LT LINE IN THE WAY OF PRPOSED ROAD FOR WINDING GOING TO CONNECTING TO DEFENCE INDUSTRIAL CORRIDOR VILLAGE BHATGAON (FROM MOHAN ROAD VILLAGE HARAUNI TO DEFENCE CORRIDOR) SAROJINI NAGAR, LUCKNOW
Quantum of work for Increasing capacity of Transformer and new LT Line ABC Conductor, required Mohalla Kastolwa, Chadigarhi area Nagar Panchayat Purwa. Unnao under Divison-III, Purwa, Unnao. Against sanctioned Package no Business Plan Year 2022-2
Proposed work for Maintenance and Replacement of Damaged 33KV, 11KV, LT Line and other associated infra due to Daviya Aapda at various place in the area of EUDD I, Mathura under the jurisdiction of SE, EUDC, Mathura
For Restringing and sagging of loose LT line erection of dp box replacement of LT insulator making consumer reconnection against M and R head under the area of Substation GSI under EUDD Sitapur road LESA Transgomti Lucknow
Supply of various size 33 KV, 11 KV and LT line Heat Shrinkable Jointing Kit (Indoor, Outdoor) and Straight Through in the area of EE, EUDD-I, II, III, Mathura under the jurisdiction of SE, EUDC, Mathura
For the Work of Business Plan 2023-24 Nagar Nigam to Replacement of Damage Conductors, Cables and Replacement of Damaged HT Poles and in Guarding of HT/LT Line Road Crossing Various Places Under EUDD-IV, Meerut.
QUANTUM OF WORKS FOR REPLACEMENT OF OLD AND JARJAR , LT LINE, T/F PROTECTION AND AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2025-26 (9.20 Cr) UNDER THE AREA OF EDD-IV BANGARMAU UNNAO.(6 WORK).
For the Work of Additional Business Plan 2023-24 to Replacement of Damage Conductors and Cables and Replacement of Damaged HT Poles and in Guarding of HT/LT Line Road Crossing Various Places Under EUDD-IV, Meerut.
For the Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2022-23 Under SDO-I, Rajendra nagar in the area of EUDD-IV Ghaziabad. under the Jurisdiction of EUDC-III GZB.
installation of Underground 33 KV, 11 KV and LT line from Wave Cinema to Tulip Garden and Akbar Fort placed at Kanth Road to sale Tax office works related works under MSCL project for Moradabad Smart City
For Cutting/Chopping of Trees Branches Along 11 KV/LT Line and 33 KV Lines in the Area of 33/11 KV Sub-station Nauchandi before the Mela Nauchandi-2023 Under Electricity Urban Distribution Division-III, Meerut.
QUANTUM OF WORKS INVOLVED IN DIFFERENT WORK ( REPLACEMENT OF OLD AND JARJAR WIRE OF 11 KV AND LT. LINE, PROVIDING NEW TRANSFORMER DUE TO OVELOADING, REPLACEMENT OF OLD AND JARJAR BATTERY AND CHARGER SET AND OTHER PROTECTION
REGARDING NEW and Old 11 KV AND LT LINE WORK UNDER SYSTEM IMPROVEMENT DEPOSITE WORK, BUSSINES PLAN WORK and OTHERS AT 33/11 KV S/S. IN THE AREA OF EDSD-III, BHOLA UNDER EDD-III MEERUT
Regarding Construction of NEW and Old 11 KV LT Line and other releated works of deffrient packegs under Deposit Scheme at 33/11 KV Sub-Station Gejha, Ukhlina and Raghunathpur in the area of EDSD-III, Meerut.
Regarding Construction of NEW and Old 11 KV/LT Line and other releated works of deffrient packegs under System Improvement at 33/11 KV Sub-Station Gejha, Ukhlina and Raghunathpur in the area of EDSD-III, Meerut.
Looping and Chopping of tree branches for clearance of HT line at Various 33/11 KV Sub Station. After clearance of line throw out pieces of tree branches out of the site. under jurisdiction of EDD, CESS-II, Lesa, Lucknow
Work of Capacity enhancement of 11/0.4 KV Sub-station, New 11/0.4 KV S/s and renovation/ Augmentation of LT/HT Line under the Electricity urban Distn. Division-I/II/III, Moradabad on Semi-turnkey basis under Additional Business Plan.