Loading…
Loading…
5,870 results • Best match
Work of Capacity enhancement of 11/0.4 KV Sub-station, New 11/0.4 KV S/s and renovation/ Augmentation of LT/HT Line under the Electricity urban Distn. Division-I/II/III, Moradabad on Semi-turnkey basis under Nagar Nigam Plan.
Work involving the shifting of the 33 KV HT line between Sahupuri Road and Padav Crossing and work of shifting the 11 KV H.T. line near Vill.-Chittampur within the jurisdiction of the EDD-II, Mughalsarai, under the Deposit Scheme.
REPAIR/ MAINT OF EXTERNAL ELECTRIC EQPTS, LT DISTRIBUTION EQPTS, COOLING/ HEATING APPLIANCES, LT SUPPLY/ DISTRIBUTION SYSTEM OF LT LINE AND ALLIED WORKS OF EXTERNAL ELECTRIFICATION, DG SET AND REPAIR/ REPLACEMENT OF INTERNAL ELECTRIC WIRING, LIGHT F
Refer to Tender Description
Refer to Tender Description
CONSTRUCTION OF NEW 33 KV LINE EMANATING FROM 132 KV PRIMARY SUBSTATION OYAL (LAKHIMPUR) TO SUBSTATION HARGAON AT DISTRICT SITAPUR UNDER BUSINESS PLAN 2023 24
Maintaining of 33 KV line at Mandaliya Hospital Darshan Nagar in Under ground single Circuit 33 KV XLPE Cable Under Electricity Distribution Division IInd, Ayodhya
CONSTRUCTION OF NEW 33 KV LINE EMANATING FROM 220 KV PRIMARY SUBSTATION KANDUNI TO SUBSTATION BARAI JALALPUR AT DISTRICT-SITAPUR UNDER BUSINESS PLAN 2023 24
Work for railway 11 and 33 kv line shifting of crossing no 152A carbon factory and crossing 152B ROB under deposit Scheme EUDD-V GZB
CONSTRUCTION OF NEW 33 KV LINE EMANATING FROM 220 KV PRIMARY SUBSTATION DAHI CHAUKI TO SUBSTATION IBRAHIMBAG AT DISTRICT UNNAO UNDER BUSINESS PLAN 2023 24
CONSTRUCTION OF 11 KV AND 33 KV LINE IN THE AREA OF SUB-STATION-PAVI IN VILLAGE MEERPUR HINDU LONI UNDER THE EDD-I LONI
Work of making 33 KV line for giving 24 Hours electric supply to Mahila Hospital, Basti in Business Plan under Electricity Distribution Division-I, Basti
For construction of Underground 11 KV line at Various Places under System Strengthening works in Municipal area scheme under EDD-II, Bareilly
For construction of Underground 11 KV line at Various Places under System Strengthening works in Municipal area scheme under EDD-I, Bareilly
VARIOUS ELECTRICAL WORK DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT INSTALLATION OF DISTRIBUTION TRANSFORMER STRENGTHENING OF 11 KV LINE NEW AND REPAIRING OF LT LINES
Work of the Running Contrackt Sub Div EDSD ITI common New 11 KV line and mezor breakdown, Natural disaster and etc work.
Eraction of new 11 kv line and installation of new 63/100/250 kva Tf under EDD Fatehabad in bp 2025-26
Maintenance and Repairing of 11 KV Line of Badshah Bag Feeder Emanating from 33/11 KV S/S Kasimpur under EDD-Behat
Functioning and maintenance work of 33/11 KV line correcting loose strings, correcting crooked poles, correcting loose steys and correcting cable fault.
Repairing of internal electrification in office building APF (9 x 40) mt 2 Nos Godown 500MT 3 nos repairing of LT line and Supply and Fixing of 1 No Cantilever retro reflective sign board structure AT NMY Yusufpur
For the Work of Maintenance of 33/11 KV and LT Line (Including Replacement of Pole, Welding of Pole, Re-strengthening of Pole, Guarding and Tree Chopping etc.) in the Area of EUDSD-IX Under EUDD-II, Meerut.
Shifting of 11 KV/LT line in both side of the Bahraich to Gonda Km. 0.00 (Dunnakka Polcie Chuaki) to Km 60.00 for EE Construction Division-3 (World Bank) P.W.D. Sitapur against Deposit Scheme under EDD-3 Kaiserganj
Construction of LT Line and Internal Eiectrification in B type Shops 05 Nos., C type Shops 20 Nos., APF 02 Nos., Residential work and Construction of Tube well with 1 H.P. Submersibile Pump at S.M.Y Sataon, Gurubakshganj, Raebareily.
EE, EDD-Ist, EDSD-IIIrd, Chakiya under Chandauli area, 33/11KV sub-Station under Chakia-Jogeswanath, Chakarghatta and Naugarh (Naxal affected and forested hilly areas), the work of installing spacers in the LT line, straightening the crooked poles
For the Work of Installation of 33 KV Lightening Arresters at Four Pole at 33/11 KV Sub-Station Nauchandi and Shifting of 11 KV /LT Line Span on Hapur Road, Erection S.T. Pole Under EUDD-III, Meerut.
For Construction of 11KV O/H line, 11/0.4 KV 250 KVA Sub Station, LT line by ABC Conductor in the area of 33/11 KV S/S New Ramnagar, Varanasi under Deposit Scheme 2022-23 with GST
Repairing of internal electrification in office building APF 9 x 40 mt 2 Nos Godown 500MT 3 nos repairing of LT line and Supply and Fixing of 1 No Cantilever retro reflective sign board structure AT NMY Yusufpur
Construction of LT Line and Internal Eiectrification in B type Shops 05 Nos., C type Shops 20 Nos., APF 02 Nos., Residential work and Construction of Tube well with 1 H.P. Submersibile Pump at S.M.Y Sataon, Gurubakshganj, Raebareily.
For Construction of HT LT line and substation Shifting of line and pole in the area of sub division Mahanagar against Deposit head FY 2022 2023 under EUDD Mahanagar in the jurisdiction of SE EUDCVI Transgotmi LESA Lucknow
For the Work of Maintenance of 33/11 KV and LT Line (Including Replacement of Pole, Welding of Pole, Re-strengthening of Pole, Guarding and Tree Chopping etc.) in the Area of EUDSD-IV Under EUDD-II, Meerut.
For the Work of Repair and replacement HT/LT line for safety during proposed kanwad yatra 2022-23 Under SDO-II/III Lajpat nagar in the area of EUDD-IV Ghaziabad. under the Jurisdiction of EUDC-III GZB.
Supply of De-Centralized materials Semi Turnkey and Construction of 11 KV LT line and Installation of transformers HT metering system for given supply Nivesh Mitra Jhatpat portal Sansad Vidhayak Nidhi under deposit scheme in EDD-Kachhawa Mirzapur
For Construction of HT LT line and substation Shifting of line and pole in the area of sub division Mahanagar against Deposit head FY 2022 2023 under EUDD Mahanagar in the jurisdiction of SE EUDCVI Transgotmi LESA Lucknow
Shifting of 11KV/LT line and other related work to Jhunsi Kakra Durwasa Lilapur KM-04 to Shitala Mandir Jhunsi Kakra Durwasa Lilapur KM-07 in EDSD Jhunsi Under Electricity Distribution Division-II, Praagraj due to Road winding
Regarding replacement of damage pole, wire, pole in long spen etc., in lt line of existing transformers in villege Kurali at 33/11 kv sub-station Raghunathpur in the area of EDSD-III, Bhola under EDD-III, Meerut.
Replacement of ACSR conducter by New AB Cable of LT Line in vill - Naithla 100 KAV OM PRAKASH CHAKKI, 63 KVA BEDNARI HOSPITAL AND 100 KVA BANK WALI D/P IN S / s Walipura, Under EDD-II, Bulandshahr
Construction of New H.T Line, Laying of 11 KV Cable size 3x70 Sqmm, for New connection and Shifting of LT Line from Azad Nagar Campbell Road Bishmillah Lawn to Mari Mata Mandir under the area of EUDD (Thakurganj)
33kv line ke shatigarast bhumigat cabel ko badalne ka karye under eudd ii sre
CONSTRUCTION OF 33KV LINE FORM 33/11KV SUBSTATION DHRPA TO THDC INDIA LTD KHURJA
WORK MENSION IN BOQ
WORK MENSION IN BOQ
WORK MENSION IN BOQ
WORK MENSION IN BOQ
WORK MENSION IN BOQ
WORK MENSION IN BOQ
HT/LT LINE SHIFTING WORK UNDER DEPOSIT SCHEME
33 and 11 KV LT Line maintenance work
Work of 100/250/400 KVA S/S Transformer on STP Pole and Other Related Works for Construction of 2 lane ROB in lieu of level Crossing 61/B on Prayagraj-Ayodhya Railway section Km 123/8-9 Near Mau Aima Railway Station in Distt. Prayagraj
Custom Bid for Services - HT & LT Line installation works for Jhatpat/Nivesh Mitra new connections as comes time to time and other deposit head works in the area of EDSD-Mant under EDD-Mant, Mathura Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - HT & LT Line installation works for Jhatpat/Nivesh Mitra new connections as comes time to time and other deposit head works in the area of EDSD- Laxminagar under EDD-Laxminagar, Mathura Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations