Loading…
Loading…
3,328 results • Best match
Construction of RCC Retaining wall along with RCC Flooring for Raw water off take chamber (for 4.55 ML filtration plant) located in Mogalture - Nidadavole canal in Palacole Municipality
Construction of Protection wall (140 Mts) in Rajiv Gandhi National Park in Rameswaram RF, Proddatur Range of Proddatur (WL) Division during 2018-19
Desilting and construction of protection wall to right bank of Pedda pakala vanka near Baratham mitta H/o Pakala mandal of Chittoor District
Construction of protection wall to the gedda and providing of vertical gratings at NH-5 near P&T Colony in ward no:11
Reconstruction of collapsed protection wall in KM 45/10 of Gudur - Rajampeta Road in Ghat section for Road Safety in SPSR Nellore District
Construction of (2 Nos.) RCC Fire Protection wall in between 100MVA PTRs at 220KV SS, Diaryfarm and 220KV SS, Gangavaram in Visakhapatnam District.
Construction of Protection wall both side of Bokkala vanka from Rice Mill to Vempalli Cement Road near Vempalli (V&M) of YSR District.
Laying of CC Road from D.No. 64/52 to D.No. 64/73 and 64/73n to Buggavanka Protection Wall at in 40th Division.
Construction of protection wall to the gedda and providing of vertical gratings at NH-5 near P&T Colony in ward no:11
Const. Of Protection Wall on both sides of Thota Kalva Branch Channel of Yeleswaram (v) of Thimmararaju Tank,Yeleswaram (M) in E.G. Dist
Construction of (2 Nos.) RCC Fire Protection wall in between 100MVA PTRs at 220KV SS, Diaryfarm and 220KV SS, Gangavaram in Visakhapatnam District.
Water Proofing Treatment for the Control Room and Providing of Fire Protection Wall at 132KV Sub-station in Razole in East Godavari District.
Construction of Protection wall both side of Bokkala vanka from Rice Mill to Vempalli Cement Road near Vempalli (V&M) of YSR District.
Construction of Protection wall along the Jinakala vanka near Reddaiah fields of Rallapalli village of Moillakalava GP in Pendlimarri Mandal of YSR District.
Construction of Protection wall and laying of gravel road nala pipe culvert in Ward Secretariat number 31st and 37th of Anantpauramu Municipal Corporation
Construction of R C C protection wall at Simhachala nagar sulabha complex east side quarry area in 49th division (Under S.C.S.P 2018-19)
Construction of CC road and Protection wall in SC and ST colony of Gaddamanugu V of G.Konduru M Est.Cost.Rs. 20.00 Lakhs -DMF Grant
Construction of Flood Protection Wall along the Left margin of Krishna River from Padmavathi Ghat to Kanakadurgamma Varadhi in Vijayawada City Phase III
Repairs and Restoration of damaged Protection Wall on Thudicherla Channel from KM 0.000 to KM 0.500 near Thidicherla(V) Jupadubanglow (M) Nandyal Dt.
Construction of Protection Wall to Forest Canal in Alireddypalli (V&GP) of Vempalli Mandal in YSR Kadapa District, Estimate Cost Rs.12.00 Lakhs.
Construction of Protection wall (Prefabricated) to Open site in Rs No.63 at Dargah plots in 41st division Rc.E6-100601/2024 (1st call)
Construction of Protection wall (140 Mts) in Rajiv Gandhi National Park in Rameswaram RF, Proddatur Range of Proddatur (WL) Division during 2018-19
FDR -2024- Temporary Restoration to Protection wall to OT of Putcha Kaluva Head Regulator near NV Kandriga Villagein Sullurupeta Mandal of Tirupathi District.
Construction of Protection wall Checkdam upstream left side to protect Suravaripalli SC lands near Suravaripalli SC Colony in Srikalahasti Mandal of Chittoor District.
Construction of Protection wall along Kothapalli Narava near P.Ranamma fields in Jogireddygaripalli (V) H/o Yerrabommanapalli (GP) in Chakrayapeta (M) of YSR District.
FDR 10/2025: Temporary Restoration to the protection wall to the surplus course near Bogole village in Bogole mandal of SPSR Nellore District.
Temporary Restoration of Protection Wall from Sluice No.3 Mekavaripalli to Poleramma Temple Near Amanicheruvella Village in Ananthsagaram Mandal of SPSR Nellore District
Construction of protection wall and toilet at Laxmi Narayana puram-02 Anganwadi at 1086254 Secretariat in ward no.45 of Zone-V(A).
Construction of Protection wall at Chennakesava Swamy Temple at Ramanuthalapalli village of Lingala Mandal in YSR Kadapa District Est cost of 40.00 Lakhs
CONSTRUCTION OF PROTECTION WALL AT D/S OF L/S OF MADUGU KALVA NEAR KOTHA KANDRIGA H.W IN THOTTAMBEDU MANDALAM OF CHITTOOR DISTRICT.,
Construction of Protection wall and Repairs to Guidewalls to Vankavoddu checkdam of KCC System near Chiyapadu (V) in Chapadu(M) in Kadapa District.
Execution of balance works in connection with proposed slope stability measures by construction of retaining walls, side drains, catch water drains, bank slope turning and pitching etc., between Silakzhori- Kirandul stations under the jurisdiction of ADEN/KRDL on KK-II line of Waltair division.
Construction of a new RCC retaining wall at D.No6-13/3-41, Kondruvari street, gollapalem Gattu Hill area located in the 50th division in Circle-I area (3rd call)
Laying of BT on ramp road, Rising of retaining wall and laying of CC wearing coat flooring on platform at Auto Nagar transfer station. Rc.V1-100722/2023 (7th Call)
Laying of BT on ramp road, Rising of retaining wall and laying of CC wearing coat flooring on platform at Auto Nagar transfer station. 5th call Rc.V1-100722/2023
Laying of BT on ramp road, Rising of retaining wall and laying of CC wearing coat flooring on platform at Auto Nagar transfer station. 4th call Rc.V1-100722/2023
Construction of RCC retaining wall and CC pavements at Kanaka Durga Temple (D.No.3-33-51) 5K Farid street (nearest EP no.55/33) at Yarakatta in 55th division
2022-Eng04-31-137 Providing CC pavement, 300mm drain and raising of retaining wall at Chakalipet opp D.No.29-14-47 in ward no 31 of Zone-IV(GGMP)
Construction of retaining wall at breached portion and slab culvert on Achayapet distributary at km 0.00 to 2.8 km at papampeta village of Maddigedda Reservoir Project Addateegala in E.G.Dt.
Providing mural paintings to the shaded damaged portion of Retaining wall along the National highway from Kapparada Junction to Thatichatlapalem and VIP road in ward no.37 of GVMC.
2019-Eng08-99-121 Providing steps at Kondapeta and Bunglowmetta and Construction of retaining wall in Kondapeta hill area in ward no.2 Thagarapuvalasa of Bheemili ZONE. (2nd call)
14th FC Grant - providing cc out fall Drain from kommeru Subba rao house (D.no:6-124) to Sri ram house ( Railway retaining wall) in 6th ward of Tadepalli Municipality.
Construction of Retaining wall & Approach roads to Minor Bridge (2VX10.37M) across Suddagadda vagu at KM 0/200 of NH216 to Housing Colony road, Gollaprolu village, Kakinada District (2nd Call)
Construction of retaining wall at D.No.15-339, D.No.332 and D.NO.15-349/B at Lakshmi Nagar in Ward.No.90 of ZOne-VIII (hill lock area) (2ND CALL)
Construction of RCC Retaining wall (Balance portion) at D.No.6-13/2-33 Gollapalem gattu Pothu Raju Temple back side hill area in 50th division in Circle-1 area
Construction of a new RCC retaining wall at D.No6-13/3-41, Kondruvari street, gollapalem Gattu Hill area located in the 50th division in Circle-I area (2nd call)
Laying of CC Road & drain and retaining wall from D.No: 36-92-284/15 to D.No: 36-92-263/2 at Srinivasa Nagar Hillock area in Ward No: 37
Laying of BT on ramp road, Rising of retaining wall and laying of CC wearing coat flooring on platform at Auto Nagar transfer station. Rc.V1-100722/2023 (9th Call)
Construction of Retaining wall at Veeraiah street ( Beside Kalyana Mandapam) D.No.6-4/1-7G Thota Kotamma Hose to Akkidasu Venkateswarlu House in 35th Division.(SCSP Grant) (9th call)
14th FC Grant - providing cc out fall Drain from kommeru Subba rao house (D.no:6-124) to Sri ram house ( Railway retaining wall) in 6th ward of Tadepalli Municipality.