Loading…
Loading…
3,328 results • Best match
Construction of Steps / Pathways, Flood and Retaining walls for habitation to hill area at Ramachandra colony from Odiboina Nookalamma House (D.No.6-9-151) to Kasimkota Ramulamma (D.No.8-75) in Pathaveedhi in Ward No. 4 of Yelamanchili Municipality under Gadapa Gadapaku Mana Prabhutvam(GGMP/W.4).
Construction of Steps / Pathways, Flood and Retaining walls for habitation to hill area at Ramachandra colony from Odiboina Nookalamma House (D.No.6-9-151) to Kasimkota Ramulamma (D.No.8-75) in Pathaveedhi in Ward No. 4 of Yelamanchili Municipality under Gadapa Gadapaku Mana Prabhutvam(GGMP/W.4).
Construction of Steps / Pathways, Flood and Retaining walls for habitation to hill area at Ramachandra colony from Odiboina Nookalamma House (D.No.6-9-151) to Kasimkota Ramulamma (D.No.8-75) in Pathaveedhi in Ward No. 4 of Yelamanchili Municipality under Gadapa Gadapaku Mana Prabhutvam(GGMP/W.4).
Construction of Protection wall of KCC Main canal on R/s bank at km 165.400 to 165.440 near B.Kodur (V), Bandiatmakur (M), in Kurnool Dt.
Construction of Protection wall of KCC Main canal on R/s bank at km 165.440 to 165.480 near B.Kodur (V), Bandiatmakur (M), in Kurnool Dt.
Construction of protection wall for pedda vanka vagu right side R&B culvert near kamanur village in kcc system in Duvvur Mandal in Kadapa Dist.
Construction of protection wall from Pullaiah kunta to Gorla kunta vanka in Chilekampalli Malapalli (V) H/o Chilekampalli of Chakrayapeta (M) of YSR Kadapa District.
Construction of Protection wall of Chamakalva on L/s bank at km 0.500 Crossing of Bugga vanka near Ponnapuram (V), Nandyal (M), in Kurnool Dt.
Construction of Protection wall along Muthukunta vanka near Surinarayana reddy fields in Siddareddygari Palli (V) in Y.B.Palli (GP) of Chakrayapeta (M) in YSR Kadapa District.
Construction of ayacut protection wall left side and right side of surplus course of Sadasivakona reservoir near kandadu (V) in Yerpedu mandal of Chittoor District.
RECONSTRUCTION OF COLLLAPSED PROTECTION WALL IN KM 45/10 OF GUDUR - RAJAMPETA ROAD IN GHAT SECTON FOR ROAD SAFETY IN SPSR NELLORE DISTRICT (2nd CALL)
Construction of protection wall of 131 R Sluice supply channel at km 1.200 near Sanjeevarayudu temple near A.Kodur (V) Bandi atmakur (M) in Kurnool Dt.
Improvements to the Supply channel(Protection wall) from anicut to feed Tenepalli cheruvu near Petamitta (V) in Puthalapattu(M) of Chittoor Dist.(Item no.10)
Construction of Protection wall of Chamakalva on L/s bank at km 0.500 Crossing of Bugga vanka near Ponnapuram (V), Nandyal (M), in Kurnool Dt.
Construction of Protection Wall to Vaagu near SC Colony in Kathaluru (V&GP) of Vempalli Mandal in YSR Kadapa District, Estimate Cost Rs. 40.00 Lakhs.
Construction of protection wall from Durga devi temple (36-80-10/6) to Vivekananda Veedi SW drain in ward no.55, Zone-V(A),GVMC.,
Construction of R C C protection wall at Simhachala nagar sulabha complex east side quarry area in 49th division (Under S.C.S.P 2018-19)(2nd Call)
Construction of protection wall from Durga devi temple (36-80-10/6) to Vivekananda Veedi SW drain in ward no.55, Zone-V(A),GVMC.,
Construction of protection wall from Durga devi temple (36-80-10/6) to Vivekananda Veedi SW drain in ward no.55, Zone-V(A),GVMC.
Construction of Protection Wall to Vaagu near SC Colony in Kathaluru (V&GP) of Vempalli Mandal in YSR Kadapa District, Estimate Cost Rs. 40.00 Lakhs.
Construction of Protection Wall at Breached Portion and RCC Slab culvert on Meerakha Kalva of Nallatammaiah Tank of Erravaram (v), Yeleswaram (M) in E.G. Dist.
Construction of protection wall east side of Vasavi Arya Vysys Annasatram in Gandi Kshetram, H/o Marellamadaka (V) in Vempalli (M) of YSR Kadapa District.
Construction of protection wall of 131 R Sluice supply channel at km 1.200 near Sanjeevarayudu temple near A.Kodur (V) Bandi atmakur (M) in Kurnool Dt.
Construction of Protection wall to Burial Ground at Eguvalingala of Lingala (V&GP) of Lingala Mandal in YSR Kadapa District, Est. cost Rs.12.70 Lakhs.
Providing protection wall, CC apron & causeway to damaged super passage and removal of shoals at Super Passage Km 27.199 in Water Supply Canal, YLM Canal
Improvements to Burrial Ground (Protection wall to flow of drain water) at perikalapudi Village of Duggirala Mandal. Estimate Cost Rs. 1.50 Lakhs. (MPLADS) (Ist Call)
Construction of Protection wall both side of Bokkala vanka from S. Chalapathi fields to Papagni river near Vempalli (V) in Vempalli Mandal of YSR District
Construction of Protection wall both side of Bokkala vanka from Dhobi Ghat to S. Chalapathi fields near Vempalli (V) in Vempalli Mandal of YSR District.
Construction of Protection wall along the Length of Idupulapaya stream from old Causeway to peacock park in Idupulapaya Estate in Vempalli Mandal of YSR District.
Construction of RCC Culvert & Protection Wall to Brodipet 1/19 Cross Road (South side) in Div. No.32 under AE-2 Section of GMC. (Recall)
Construction of protection wall from Durga devi temple (36-80-10/6) to Vivekananda Veedi SW drain in ward no.55, Zone-V(A),GVMC.,
Construction of Protection wall to Burial Ground at Eguvalingala of Lingala (V&GP) of Lingala Mandal in YSR Kadapa District, Est. cost Rs.12.70 Lakhs.
Construction of Protection Wall to Vaagu near SC Colony in Kathaluru (V&GP) of Vempalli Mandal in YSR Kadapa District, Estimate Cost Rs. 40.00 Lakhs.
Construction of Protection wall for nalla vanka beside Sri K. Pulla Reddy fields (SR No. 232) near Palur village of Thondur Mandal of YSR District.
REPAIRS TO AREA DRAIN, HARDSTANDING AND PCC PAVEMENT, STONE PITCHING, RETAINING WALL, COMPOUND WALL, FENCING AND GATE AND CLEANING AND REPAIR OF SEPTIC TANK, MH SWT, SEWAGE LINE AT NAD BHEEMUNIPATNAM
Construction of retaining wall at breached portion and slab culvert on Achayapeta distributary @km 0.00 to 2.8 km at Papampeta village of Maddigedda Reservoir Project Addategala in E.G Dist. (2nd call)
Protection to Retaining Wall by providing Platform in between K.M. 19.300 and K.M. 19.400 of Akhanda Godavari Left Flood Bank in Bobbilanka Village Limits of Seethanagaram Mandal in East Godavari District.
Construction of RCC Retaining wall and repairs to the existing bottom of gedda at some places for the gedda at Bora Veedhi in ward no 12 of Zone-II-6th call
Construction of the RCC Raft and Retaining wall for the Gedda from D.No 55-6-36 to TSR Apartments in Ambedkar colony in ward no 16 of Zone-III-2nd call
Construction of Retaining Wall, Relaying of 200 mm dia UGD Sewer pipe Line and Providing CC Road to Attuluri Paramatma street hill area Mogalrajpuram in 7th division.4th Call General Funds
Construction of retaining wall 63-5-1/5, 1, 1/2, and 1/4 (Hilly arae) and laying CC roads and CC drains at Indira colony-II in Ward No.48
Construction of retaining wall CC road and DRain at D.No. 36-96-33, to D.No.36-96-40, Ramjee Estate Hillock area in Ward No. 37 in Greater Visakhapatnam Municipal Corporation
Construction of balance portion of retaining wall and providing balance portion of BT road from Kodavalli Road junction to Miramiyyacodu Mente Sri Rama Murthy Arch Road in4th ward in Bhimavaram Municipality
Providing retaining wall CC Pavement and AC sheet roof to the burial ground adjacent to Kailasagiri walking track near Bajaz company in NH-16 in ward no 08 of Zone-II.
MGWDDS-Estimate of Balance work for the Construction of Retaining Wall on both sides and Bed Concrete on Dhammayyaparthi Minor drain from Km.0.860 to Km.1.760 near Palakollu in W.G.Dist.,
Construction of RCC retaining wall (Balance works) at backside of Annadanam Hall (UP hills) in the premises of Sri Malyadri Lakshmi Narasimha swamy temple, Malakonda (V), Voletivaripalem (M), SPSR Nellore Dist
Providing Kacha Road Drain using shovel 0.85cum 110 Hp ( Proclain) from 10MGD Plant to Sai Ram cut pieces Road along Retaining wall in Ramalingeswara Nagar 14th Division. 1st Call General Funds
Construction of Closed Conduit on Yedida Kamsali Minor drain in between KM 1.40 to KM 1.80 and Retaining wall in between KM 1.00 to KM 1.40 in G.E Delta (2nd call)
Protecting eroded margins from Km 15.800 to 21.200 of Kavitampakala Malavanitippa road in West Godavari District Sub Work Retaining wall from Km 15/8 to 16/8 of Kavitampakala Malavanitippa road
Laying of CC Road at Muslim Palem at Pedacherukur, Construction of slab Culvert and Retaining Wall from Sathyam G Nagar to Syphon Thumu in division No.12 of Nellore Municipal Corporation