Loading…
Loading…
3,328 results • Best match
Construction of RCC Protection wall at Simhachala Nagar School road near Quarry Road existing wall continue Reach-1 in 49th division. (Under SCSP Component 2017-18) (3rd Call)
Construction of protection wall along the Nersupalli Vanka from Nerusupalli Rama house to Gouse Modin house in Nersupalli H/o Nersupalli in Chakrayapeta (M) of YSR Kadapa District.
Construction of 1No. Fire Protection wall between the 220/33KV 80MVA PTR-1 and 220/33KV 50MVA PTR-II at 220/11KV SS Nansuralla HNSS in Kurnool Dist.
Construction of 1No. Fire Protection wall between the 220/33KV 80MVA PTR-1 and 220/33KV 50MVA PTR-II at 220/11KV SS Krishnagiri HNSS in Kurnool Dist.
Construction of RCC Protection wall at Simhachala Nagar School road near Quarry Road existing wall continue Reach-1 in 49th division. (Under SCSP Component 2017-18) (3rd Call)
Restoration of Sluice, Surplus Course and Construction of Protection wall to Field Channel under Sluice of Madavagiripalli Small tank near Madavagiripalli Village in Srikalahasthi Mandal of Chittoor District
Construction of compound wall and Protection wall to Grama sachivalayam complex in Murarichinthala village and GP of Lingala Mandal in YSR Kadapa District. Est cost of 25.00 Lakhs
Construction of CC Protection Wall cum road along local vanka near Thallapalli Village and GP of Vempalli Mandal in YSR District Kadapa, Est. Cost of Rs.92.00 Lakhs
Construction of 1No. Fire Protection wall between the 220/33KV 80MVA PTR-1 and 220/33KV 50MVA PTR-II at 220/11KV SS Krishnagiri HNSS in Kurnool Dist.
Construction of protection wall L/s of Vadde vanka near Sri B. Rami Reddy fields of Kuppaguttapalli (V) H/o Surabi (V) in Chekrayapeta (M) of YSR District.
Providing of protection wall from Existing Electrical DP to Sri boyakondamma temple at surappakatta road in 27th ward in Hindupur Municipality under general funds 2021-22. (1st call)
Proddatur Municipality - 15th FC Untied Grant for 2020-21 1st Installment - Construction of Protection Wall for the Municipal Open Sites at IDSMT Layouts, in Ward Nos.9 & 17
Providing Protection wall in Km 8/8-10 of Thonduru- Simhadripuram road (Via) Lomada, Duddekunta and Lomada (In between Lomada and Ramagiri in Simhadripuram Mandal) in YSR District
Providing of Protection wall and removal of silt in Kandakam bavi at town church back side in ward no.13 of Gooty Municipality Under General Funds 2023-24
Construction of Low level Vented Causeway and Protection wall across Pandulakona Vanka in Balapanuru (V&GP) of Simhadripuram Mandal in YSR Kadapa District, Est. cost Rs.16.50 Lakhs.
Providing Protection wall in Km 8/8-10 of Thonduru -Simhadripuram road (via) Lomada, Dudduekunta and Lomada (in Between Lomada and Ramagiri in Simhadripuram Mandal) in YSR District
Restoration of Sluice, Surplus Course and Construction of Protection wall to field channel under Sluice of Madavagiripalli small tank near Madavagiripalli Village in Srikalahasti Mandal of Chittoor District.
Construction of protection wall along the irrigation canal bund at 32nd ward ahmed nagar area in anjineyaswamy temple in hindupur municipality under general funds 2022-23 (3rd Call)
Restoration of Sluice Surplu Course and Construction of Protection wall to field Channel under Sluice of Madavagiripalli Small tank near Madavagiripalli Village in Srikalahsthi Mandal of Chittoor District
Construction of Protection Wall L/S and R/S of Eati Vanka near M.HarindhaReddy fields of Chelekampalli (V) H/O Chelekampalli (V) in Chakrayapeta (M) of YSR District.
Proddatur Municipality - 15th FC Untied Grant for 2020-21 1st Installment - Construction of Protection Wall for the Municipal Open Sites at IDSMT Layouts, in Ward Nos.9 & 17
Construction of protection wall along the irrigation canal bund at 32nd ward ahmed nagar area in anjineyaswamy temple in hindupur municipality under general funds 2022-23 (1st Call)
Restoration of Sluice, Surplus Weir and Construction of Protection wall to field channel under sluice of Singarayacharyula Kandriga tank near Velampadu Village in Srikalahasti Mandal of Chittoor District.
Construction of protection wall R/s of Moola vanka near Sri P. Jaganmohan Reddy fields of Utukurvandlapalli (V) H/o Surabi (V) in Chekrayapeta (M) of YSR District.
Construction of 1No. Fire Protection wall between the 220/33KV 80MVA PTR-1 and 220/33KV 50MVA PTR-II at 220/11KV SS Nansuralla HNSS in Kurnool Dist.
Protection of Eroded bank by Construction of Retaining Wall On Teki Major Drain L/B Between KM 13.500 to 14.00 and Inlets at KM 12.00 L/B and 13.800 L/B in G.E Delta
Protection of Eroded bank by Construction of Retaining Wall On Kaleru Medium Drain Between KM 15.800 to 16.00 both R/B and L/B to Protect the Truff Acqueduct in G.E Delta (2nd call)
O&M such as Reconstruction of wing walls of Ravula Doddi Codu channel Head sluice in Lower pulleru canal and Retaining wall on D/s of H/S LB for the year 2021-22
Laying of CC road & drain and retaining wall from D.No. 36-92-284/15 to D.No.36-92-263/2 at Srinivas Nagar Hillock area in Ward No.37 in Greater Visakhapatnam Municipal Corporation
Construction of RCC retaining wall, steps, CC drains and landing to EP No.32/56 road and D.No.3-1-122/2C at Ramu Quarry Hill area in 29th division. (General Funds) (3rd call)
Laying of cc road & drain and retaining wall from D.No.36-92-284/15 to D.No.36-92-263/2 at Srinivasa nagar Hillock area in Ward no.37 in Greater Visakhapatnam Municipal Corporation.
Protection of Eroded bank by Construction of Retaining wall on Andrangi Major Drain Between K.m 3.800 to k.m 4.200 L/B and Bathing Ghat at k.m 4.00 L/B in G.E Delta (2nd call)
Construciton of Retaining Wall Km. 81/8, 83/8, Km 83/10, Km 85/4, Km. 92/8 and Km. 93/8 of Kakinada- Amalapuram - Narsapuram - Ferry Road in East Godavari District (3rd Call)
MGWDS-Construction of Box Culvert @ Km. 9.400 and Km.9.900, Cross Regulator @ Km. 5.110 @ Km. 9.200 on Duvva Channel and Retaining Wall on Kondayyapalem branch channel in Duvva (V) Limits Tanuku (M) in W.G.Dist.,
MGWDS-Construction of Box Culvert @ Km. 9.400 and Km.9.900, Cross Regulator @ Km. 5.110 @ Km. 9.200 on Duvva Channel and Retaining Wall on Kondayyapalem branch channel in Duvva (V) Limits Tanuku (M) in W.G.Dist.,
Construciton of Retaining Wall Km. 81/8, 83/8, Km 83/10, Km 85/4, Km. 92/8 and Km. 93/8 of Kakinada- Amalapuram - Narsapuram - Ferry Road in East Godavari District (3rd Call)
Construction of Retaining Wall from Manipal Hospital to Mahanadu Road No.1 to connect the approach of Sitanagaram Pushkar Ghat (from Km 0.00 mt to 100.00 Mts) Package No.1 under Krishna Pushkarams 2016
Construction of RCC retaining wall and ramp to the gedda downstream and providing MS grill to the pipe culvert silt chamber at upstream at NH-16 near petrol bunk, thatichelapalem in Ward No. 33
CONSTRUCTION OF MOJOR OUTFALL CC DIRAN AND RETAINING WALL FROM MUNICIPAL VEHICLE SHED BACK SIDE D.NO.4-3-139 ADN CONSTRUCTION OF BOX CULVERT BEHIND 4TH SACHIVALAYAM IN INDIRANAGAR WARD NO.7 (2ND CALL)
Construction of Retaining wall, CC Drains and CC Roads at 16-409 1to 16-405/1 and 164/A/9 in Srihari Nagar & Kailash Nagar in ward No. 11 of Zone-II (2nd Call).
Construction of Retaining wall, CC Drains and CC Roads at 16-409 1to 16-405/1 and 164/A/9 in Srihari Nagar & Kailash Nagar in ward No. 11 of Zone-II (3rd Call).
Formation of Approach by constructing the Retaining Wall at both sides from Poorna Market Junction to existing CC Road leading to Satyanarayana Swamy Temple at Sand Hill in Ward No.23 of Zone-III
Construction of Brickwork cum RCC wall for down cellar buildings in place of retaining wall support for construction of drain with footpaths at ICICI bank, Apollo pharmacy in Ward No. 09 of Zone - II.
Construction of Retaining wall, CC Drains and CC Roads at 16-409 1to 16-405/1 and 164/A/9 in Srihari Nagar & Kailash Nagar in ward No. 11 of Zone-II (3rd Call).
Construction of retaining wall 71-31-540, 71-31-543 and laying CC roads and CC drains at Trinadhapuram (Hill area) in Ward No.49. (Reserved for SC/ST Vadderas Societies only) (2nd call)
Strengthening of eroded banks by construction of retaining wall and cattle ramp in between Km 2.150 to Km 2.250 of Teki branch channel (This work is reserved for SC/ST/Vaddera communities) (2nd call)
Protecting slips by providing Gabion walls on East Tammileru Drain Between KM 0.100 to 0.125 (Downstream of East Locks) Vulnerable in rural area of Eluru Mandal in Eluru District
Protecting slips by providing Gabion walls on East Tammileru Drain Between KM 0.100 to 0.125 (Downstream of East Locks) Vulnerable in rural area of Eluru Mandal in Eluru District
Repairs to Hardstanding, Stone Pitching, Retaining Wall, Compound Wall, Fencing, Concertina Coil, Barbed Wire and Area Drainage at INS Karna and Repairs to Security Compound Wall, Steel Gate, Coping, Plastering Replacement of Concertina Coil, Barber
Protection to eroded banks on both side of new Wadapalem Channel in between K.m 1.60 to 2.00 for a length of 500 Metres by Construction the retaining Wall on both side in Wadapalem Village Limits