Loading…
Loading…
3,328 results • Best match
Improvements of Flood Banks for Providing C.C wall to the existing damaged Retaining wall portion @ KM 244.150 R/s side of K.C.C Main canal near Idamadaka (V) Duvvur (M) YSR Kadapa District.
Construction of Retaining wall on both sides and Bed concrete of Revenue Bodhi infalling into Valluru Medium Drain at KM 5.800 in Burugupalli village limits in Palakollu Constituency in West Godavari District
Construction of Storm water drains, retaining wall, CC Roads, finishing works and other miscellaneous works at UC-1, UC-1 Annex, GSB and Canteen building in BARC main campus, Atchutapuram, near Visakhapatnam, A.P.
Construction of RCC Retaining wall at D.no. 13-1490, Providing CC Roads, Drains & Steps at D.No. 13-1509,13-1516 at BC Colony Hill Top in ward No.12 of East Zone-2nd call
Four laning of 5.122 KM of NH9 (New NH65) from Km.269/900 (Design Ch.0/0) to Km.275/022 (Design Ch.5/122) i.e. Connecting NH9 (1.40KM) with NH5 (3.60 KM) including 6 lane Elevated Flyover from Bhavanipuram to Kanakadurgamma Varadhi in Vijayawada city ... of Retaining wall , ...
Construction of RCC Retaining wall at D.no. 8-128, Providing CC Roads, Drains & Steps at D.No. 8-146/3 at NEW SANTHI NAGAR Hill Top in ward No.12 of East Zone*-2nd call
Modernization of Yeleru Irrigation and Drainage System, in East Godavari District including detailed investigation , sub soil exploration, preparation of HPs,L.P. Schdules,Design of CM and CD Works, fixing remarkation KM and HM Stone along ... CC Retaining Walls and ...
Providing,Supply and installation of Interior finishes, Fit out, Lifts for main building of judicial complex and also construction of external infrastructure works including canteen,Kitchen & Security building including civil and MEP works, Retaining wall/compound...
Development of synthetic acrylic floor tennis court (04 Nos full court and 01 nos half court) including poles, nets, chain link fencing etc., including allied civil works viz retaining wall, toe walls, drainage system, seating gallery, access staircase, connecting road from the existing road network, drystone pitching etc., and E&M works in Permanent campus of Indian Inistitute of Technology Tirupati, at Merlapaka village, yerpedu Mandal. Chittoor (Dist) A.P Phase-I (Stage-1C) Subhead:- SITC of passive components, cabling for CCTV system along with removing and refixing of poles in Tennis Courts
Construction of a new RCC Retaining wall at Dr No. from 6-13/3-39 to 6-13/3-41, Ianki Pandu street in the Gollapalem Gattu hill area, 50 division under Circle-I jurisdiction (1st call)
Balance works of Physical Infrastructure such as Block Approaches, CC Road, Road Safety and Retaining Walls, Plinth Protection Works, Storm Water Drains, Chain Link Mesh, Hard Barricading, Borewells, etc., in the approved layouts at TIDCO Colony at Atchamnaidulova location in Visakhapatnam District, Andhra Pradesh under AHP-PMAY-HFA (U), with 2 years Defect Liability Period under Lump Sum Contract
Construction of protection wall and slab culvert at KM 0.30 to Km 0.50 to surplus channel of Venkanna Dora Tank in Pedasankarlapudi Village limits of Prathipadu Mandal (Under ONGC CSR FUNDS)
Providing Protection wall from Sabbavarapu Satyanarayana House to Gandi Appalanaidu House in Pedanaidupalem Village at Sabbavaram GP and Mandal in Anakapalli Disrict Estimate cost of Rs.8.50 Lakhs. Grant : 23% ZPGF Grant
Breach Closing and protection wall to drain works at Km 2.440 Aquedact of 7L minor of Vizianagaram Branch Canal of Right Main Canal of SGL TBP Project to improveits water carrying potential
Construction of RCC Retaining wall, CC Roads, Drains & Steps at D.no. 13-777/14, 13-1433/3 at BTR nagar and at Dno. 8-174/6/1 at Ganna babu Nagar Hill Top in ward No.12 of East Zone
Construction of RCC Retaining wall at D.no. 13-779/20, Providing CC Roads, Drains & Steps at D.No. 8-779/8, 8-138/29 at BTR NAGAR Hill Top in ward No.12 of East Zone)( Reserved for SC/ST society)
SWI: BZA Division: BZA-VSKP Section :1. Construction of Balance COP shelters at EE station 2. Widening of PF1 120 m with retaining wall towards RJY end at EE station in SSE/Works/ EE section in ADEN/EE sub- division under the Jurisdiction of DEN/Central/BZA. SW II : BZA Division: BZA-GDR Section :1. Construction of COP shelters at TEL station of PF1-90x8m, PF 4&5-100x14m 2. Widening of PF1 & Construction of COP shelters (50x15m) at TEL station in SSE/Works/ TEL section in ADEN/BPP sub- division under the Jurisdiction of DEN/Central/BZA
Investigation, Design and Construction of Sub Structure & Super structure Civil structure (sub structure & super structure) works for High Court building of Basement + ground + 7 floors (B+G+7) including earthwork, pile, raft foundations, RCC framed ... of Retaining wall , ...
Investigation, Design and construction of civil structure (sub structure & super structure) works for Legislative Assembly of Basement+ground+3 floors (B+G+3) including earth work, pile or raft foundations (including foundation for spire), RCC framed ... of Retaining wall , ...
Investigation, Design and construction of civil structure (sub structure & super structure) works for Legislative Assembly of Basement+ground+3 floors (B+G+3) including earth work, pile or raft foundations (including foundation for spire), RCC framed ... of Retaining wall , ...
Design and Construction of civil structure (sub structure and super structure) works for High Court building of Basement plus ground plus7 floors (B plus G plus 7) including earthwork, pile, raft foundations, RCC framed structure consisting of ... of Retaining wall , ...
Construction of CC Drain along with Supporting Retaining wall from a. Giridi Pydimamba temple to gedda b.H.No.160 to Gedda in Surya nagar Colony(at Jammu), Ward No.6 Under 15th Finance Grant (2025-26 1st Installment) Est Cost Rs.15.50 Lakhs.
Construction of CC Drain from D.No.10-2- 211/20-1 to D.No. 10-2-209/2, D.No.10-2-211/21 to Bham Bham Swamy Road, D.No.10-2-211/3-1 to Mpl. DPEP School, D.No.10-2-211/10 to D.No.10-2-211/7-1A and D.No.10-2-209/2 to Bham Bham Swamy Temple and Providing ... Providing Protection wall to ...
Construction of CC Drain from D.No.10-2- 211/20-1 to D.No. 10-2-209/2, D.No.10-2-211/21 to Bham Bham Swamy Road, D.No.10-2-211/3-1 to Mpl. DPEP School, D.No.10-2-211/10 to D.No.10-2-211/7-1A and D.No.10-2-209/2 to Bham Bham Swamy Temple and Providing ... Providing Protection wall to ...
Investigation, Design and Construction of civil structure (sub structure and super structure) works for Legislative Assembly building of Basement plus ground plus 3 floors (B plus G plus 3) including earthwork, pile or raft foundations (including ... of Retaining wall , ...
Package No.7 (2 Works) in Jaggaiahpeta Constituency Total Est.Cost Rs.190.00 lakhs 1). Construction of BT to the road from R.N.Thanda to Tripuravaram H/o Budawada (V) of Jaggaiahpeta (M) Est.Rs.110.00 lakhs 2). Construction of retaining wall and facing to Giripradakshina of road at Tirumalagiri village, Jaggaiahpeta (M) Est.Rs.80.00 lakhs
Construction of new Barrage across River Krishna near Vykuntapuram (V), Amaravati (M), Guntur District to Store 10 TMC of Water including Preliminaries, Detailed Survey, Investigation, Design, Engineering, Preparation of Estimates, L.P. Schedules. ... Works, Retaining wall , ...
Package : 15 General Fund 7 Works Est.Rs.32.88 Lakhs. 1.1.Construction of Community toilets at Majjipathi rallu in Ward No.16 Est Cost Rs.8.95 Lakhs 2.Construction of CC Road from Korada Gym to Kallanayudu Mandiram road in Ward No.17 Est Cost Rs.4.00 ... Drain protection Wall at ...