CO Intake Chamber with filter Unit CO Protection wall to protect the intake Chamber at Deodha Nallah source NDF2023 1155
P/L 60mm thick paver block, Floor tile, PF Door and Window and Painting work and C/o Protection wall
C/O main Dam of Height 4.50 mtrs and gabion check dam in wire crates on nallah at RD 500 mtrs
Restoration of Kundlu Bridge at RD 48/918 with Gabion structure and floor mattress Job No.4 Against NDRF and CRF
C C WORK
Construction of Breast Wall at RD 4/450 to 4/470, Providing and laying Wire Crate Work at RD 4/635 to 4/639.80, 4/639.80 to 4/668.80, 4/705 to 4/719.40 and 4/719 to 4/731)
Leg-I SH C/O R/Walls at RD 0/448 to 0/462 and 0/462 to 0/475 RHS and breast wall at RD 0/195 to 0/025 LHS and hume pipe culvert at Rd 0/225
Repair of pump house cum attendant Qtr stage 2nd of LWSS Dhartidhar, C/O Toilet cum bath for pump house cun attendant Qtr and C/o Retaining/Breast wall to protect the pump house 2nd stage LWSS to Dhartidhar) under JJM
SH Construction of 3 Nos Pump houses, 2 Nos Percolation wells, 2 Nos Sump well of 550000 Ltr capacity each, Main Storage tank of 16,50,000 Ltr capacity, Boundary wall, Retaining Breast wall, Providing laying of Rising main, Gravity main, etc
R/R damages to SAKB road in Km. 37/00 to 70/00. (SH Construction of R/Wall, Breast Wall Catchpits, V-shape drain, wire crate and crash barrier at various Rds, Between kms. 37/00 to 55/00). Under PDNA
ROFD, Providing and erecting W metal beam Crash Barrier Rd.2/600 to 2/850, PCC R/Wall at Rd.4/300 to 4/330, 4/450 to 4/465 and Breast wall at Rd.4/305 to 4/325
C/o cutting in earth work, construction of Breast wall at RD 153/260 to 153/275 and 153/360 to 153/465, construction of covered drain along with footpath from km 153/180 to 153/765 against smart city project
C/O PCC, Breast wall at Rd. 147/920 to 147/945, 147/977 to 147/990 and RCC projected path partly covered with Roof and P/F Railing at RD. 147/890 to 148/040(Under Smart City Project).
C/o PCC R/wall at RD 0/0 to 0/100 Deposit work
Construction of PCC Retaining wall at RD 11/720 to 11/735 and at RD 13/300 to 13/615 and 13/810 to 13/830
Construction of RCC Hume Pipe Culvert at RD. 3/930, Retaining wall, Wire Crate work and U-Shape Drain at RD. 3/830 to 3/930)
Tender for providing retaining wall for the protection of 6 pole structure to prevent erosion, provide stable base and working area, ensure safe access for maintenance
Tender for providing retaining wall for the protection of 2 pole structure to prevent erosion, provide stable base and working area, ensure safe access for maintenance
PROVN OF RETAINING WALL TOWARDS RIVER SUTLEJ OF 3 COMPANY CCSR AT KARCHAM IN THE AREA OF AGE B/R-I POOH UNDER GE 863 EWS
SH Const 1 No pump house retaining wall RCC storage tank 20000 Litre capacity barbed wire fencing around the storage tank and pump house Job NO1
(SH - Construction of Retaining wall at km 0/900 to 0/920, 1/240 to 1/253 and 2/230 to 2/242 under PDNA 2023)
Cleaning of jungle at RD 2000 to 6500 4500 Mtrs, Removal of slips at RD 2000 to 6500 4500 mtrs, CO Retaining wall at RD 2000
C/o wing wall in km. 0/045 to 0/058.40 and retaining wall in km. 0/581 to 0/590.30, 0/638 to 0/719.30
Construction of Wire crated Retaining wall at RD 0-210 to 0-225 2-350 to 2-390 and 7-120 to 7-140 under PDNA
C/o retaining wall at RD 4/183 to 4/030 to 4/050 4/195,4/108 to 4/116 and 4/366 to 4/379 )
SH Construction of 5/7 metre wide road formation cutting including removal of deficiencies CD work Retaining wall and 4.00 metre RCC Hume pipe slab culvert
Construction of Wire Crated Retaining wall at RD 3-200 to 3-220 and Construction B-wall at RD 4-760 to 4-790 under PDNA
Tender for providing retaining wall for the protection of 4 pole structure to prevent erosion, provide stable base and working area, ensure safe access for maintenance
RCC Rain Water Harvesting Structure, 2 Nos. Crate Walls, Providing Fencing 60 mtr on both Banks and Const. of 40 Mtr. Retaining Wall on both Banks
C O Head weir Retaining Wall and Wall finishing with cement paint P F glazed doors and windows and Jacketing for RCC Sump well Under PDNA
Construction of PCC Retaining wall at RD-1-925 to 1-945 and Construction of Wire Crated dumping site at RD-1-772 to 1-804
C o Thrust blocks Providing laying jointing and testing of 300 mm dia MSERW pipe and C o Retaining wall to protect Pump house at Bahri
SH Removal of formation deficiency CO Rwall Gabions wall MT works PCC V shape drain Cross drainage work road furniture CO Paver block CO Rain Shelter 1 No Bridge at Km 2 310
Construction of crate work Retaining walls at R.D. 1/150 to 1/170, 1/180 to 1/197.10 and 3/115 to 3/125 (Between R.D. 1/150 to 1/170, 1/180 to 1/200 and 3/115 to 3/125)
C O Desilting tank at RD 15 m C O BP tank, Retaining walls Anchor blocks RCC Pillars Providing laying jointing and testing of HDPE pipe 355mm dia including Pattra cutting from RD 5470 to 6200 m under NABARD RIDF XXXI Job I
SH- ROFD km 0/0 to 0/540, C/o Retaining walls at various RDs and CD work) under OTMNP RNS Head at RD 0/0 to 0/020, 0/100 to 0/120 and 0/260 to 0/280) Under OTMNP Head
C/O Source Intake chmber at Khaod and Tikri Nallah 2 Nos and Protection wall to protect the source intake chamber
C/o Protection wall in front of Pump house and C/O Source Intake Chamber with filter Unit at Bhaleru Nallah
PROVN OF RETAINING WALL TOWARDS RIVER BANK IN 5136 ASC (COMP) LOC AT KARCHAM IN THE AREA OF AGE B/R-I POOH UNDER GE 863 EWS
C/o Counter for Retaining wall as a Protection work for abutment, edge wall, wire crate and hume pipe culvert in Marotan side) under Nabard RIDF-XXVI
SH F/C 5/7 mtr wide road at RD 0/0 to 0/030 and C/O retaining wall at RD 0/0 to 0/020
Upgradation of parking facility for teacher colon by providing retaining wall paver tiles railing and pedestrian path towards upper parking to lower parking in HP University Shimla
Providing and laying Metalling Tarring, Construction of drain at R.D. 0/0 to 0/400 and Retaining wall at R.D.0/350 to 0/400) UNDER SCSP
SH C/O both side approaches in reinforced concrete Retaining wall at RD 34/309 to 34/324 Jahu side 34/476 to 3/486 Bhambla side
Formation cutting jeepable to motorable standard from Km 0/0 to 2/360 and construction of wire crated retaining wall at Km 1/040 to 1/065
C/O PCC B/wall at RD-2/465 to 2/485 and C/O PCC Retaining wall at RD-2/775 to 2/790).(Under PDNA)
Retaining wall at RD.24/745 to 24/773 and Providing and Fixing W-metal Beam Crash Barrier at RD.24/700 to 24/780 in RHS
SH Construction of PCC Retaining wall at RD 28/795 to 28/812. 32/750 to 32/780 and 36/015 to 36/035(Under PDNA-2023
SH Construction of Retaining wall at RD 0/530 to 0/545 RHS and providing and laying GSB WMM SDBC in km 0/0 to 0/300
SH- Construction of Retaining wall in PCC 1-5-10 at RD 2/369.24 to 2/392.24 and 2/403.50 to 2/426.50Right approach Road ) Under SCSP