Loading…
Loading…
5,625 results • Best match
Construction of PCC Toe wall alongwith C/O R/wall at RD 2/820 to 2/840 under PDNA
SH CO RCC culvert from new NH road to river Beas and toe wall under and above culvert SDMF
Construction of PCC Toe wall alongwith Construction of R wall at RD 1-210 to 1-235 under PDNA
Providing Flood Protection works and channelization on river Beas near area of Lad Bharol Langna in Tehsil Lad Bharol in District Mandi H.P SH Construction of Wire crated embankment with apron Gabion wall from RD 523 to 784 261 Rmt
Providing Flood Protection works and Channelization on Dol Nallah, Cho Nallah and Gadiara Nalah near village Dol in Tehsil Lad Bharol Distt Mandi HP SH CO Wire crated embankment Gabion walls on Dol Nallah, Gadiara Nallah and Cho Nallah under SDMF
Providing Flood Protection works and channelization on river Beas near area of Lad Bharol Langna in Tehsil Lad Bharol in District Mandi H.P SH Construction of Wire crated embankment with apron Gabion wall from RD 0 to 523 523 Rmt
M/R to DPRA at Longwood Shimla during 2022-23. SH: Repair/replacement of wooden flooring, wall panelling cupboards of kichen including related items at West wood, repair of damaged/deteriorated retaining wall near at Silver Craigh and Other ... damaged/deteriorated retaining wall near ...
SH Co 3 5 metre wide Ambulance road formation cutting RD 00 to 0071 Co Retaining walls at various RDs and channellization of Nallah
SH. C.O retaining walls in PCC at Km 3.450 to 3.470 4.990 to 5.015 5.405 to 5.425 7.180 to 7.200 and 8.240 to 8.285.
Formation cutting, passing place, retaining walls, cross drainage work, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
Construction of PCC Retaining walls at R.D. 19/290 to 19/340, 19/370 to 19/390 (Between R.D. 19/290 to 19/390)
SH Construction of Retaining walls,construction of road side V-Shape drain,and Metalling and Tarring in between km 6/00 to 6/400
Construction of PCC Breast walls at R.D. 1/150 to 1/170, 1/210 to 1/215, 1/220 to 1/225 and 1/230 to 1/240 (Between R.D. 1/135 to 1/240)
ROFD for 5/7 mtrs wide, R/walls/ breast walls, C.D, M/T, Interlocking paver block, Cement Concrete pavement, drain, Parapet Road Furniture etc in km 4/00 to 7/746) (Under Nabard RIDF XXXI)
ROFD for 5/7 mtrs wide, R/walls/ breast walls, C.D, M/T, Interlocking paver block, Cement Concrete pavement, drain, Parapet Road Furniture etc in km 0/0 to 4/00) (Under Nabard RIDF XXXI)
MPS/2023/1502 C/O (Construction of) Jeepable road with Retaining wall from Baba Balak Nath Mandir to house of Anil Kumar etc in Ward No. 4, village Bharoli Uparli, GP Bharoli Jadeed (SH C/o R/wall and P/L 60mm thick CC interlocking paver blocks)
C/o R/wall Length 17 metre
A/R and M/o to residential and non residential building at R.P. Niwas Shimla during 2024-25. SH: Providing retaining wall to support settling earth along building, repair of door/window shutters, repair of water supply and sanitary fitting in ... Providing retaining wall to ...
A/R & M/O to GPRA under Lower Summer Hill Shimla during 2024-25. SH:- Provision of Plum concrete retaining wall in place of existing damaged/cracked stone masonry wall to retain the sliding of earth at back side of Type-II, Block No.1 at Lower Summer ... concrete retaining wall in ...
M/R to GPRA Bemloe, Park Area & Chotta Shimla during 2024-25. SH:- Repair of approach path & retaining wall from Silver in Hotel to Oatland GPRA & CPWD Pool Quarters and providing and fixing readymade portable rectangular PVC modular toilet (European ... & retaining wall from ...
(SH- Construction of RCC Retaining wall at RD 10 to 20 - 10.00 mtrs) ).
SH- Construction of RCC Retaining wall at RD 20 to 30 -10.00 mtrs
(SH- Construction of RCC Retaining wall at RD 0 to 10 - 10.00 mtrs) ).
Construction of Retaining wall at Rd 4.450 to 4.463 and 5.570 to 5.583
SH - Construction of Martyrs walls, Fallen Solider and Retaining wall etc.) (Balance work)
Construction of wire crate Retaining wall at R.D. 1/485 to 1/512.50
SH C.o Retaining wall at RD 3.570 to 3.590 and 3.590 to 3.600
SH- C/o Retaining Wall, Edge Wall, Drain and Parapet at Various RDs
Construction of crate work Retaining wall at R.D. 1/235 to 1/270
Construction of Retaining wall at RD 5.790 to 5.983 and 6.335 to 6.348
Construction of wire crate Retaining wall at RD 2/560 to 2/580.
C/O retaining wall in PCC at km 73/483 to 73/508
Construction of crate work Retaining wall at R.D. 4/300 to 4/315
Construction of Retaining Wall between at RD 1/120 to 1/150). (PDNA
Construction of retaining wall at Rd. 0/010 to 0/023)(Balance work)
C/o retaining wall at RD(0/985 to 1/012.5)) Under PDNA
(SH- Construction of Retaining wall in PCC 1-5-10 1-4-8)
Construction of retaining wall at RD 0/0 to 0/014)(Deposit Work)
Construction of wire crated Retaining wall at R.D. 0/040 to 0/049.50
Construction of Wire Crated Retaining wall at RD-4/715 to 4-722.50
Construction of Retaining wall at RD.0/160 to 0/180).(Under PDNA).
Sub Head - Construction of retaining wall at RD 2/200 to 2/205.50)
Construction of Composite masonry retaining wall at R.D. 8/525 to 8/540).
SH Construction of retaining wall in approaches and wire crate for abutment protection
C/O Pushta Type Retaining wall at RD 1/240 to 1/246
Construction of Retaining wall at RD 0.195 to 0.27.50 ad 0.300 to 0.321
C/o retaining wall at RD 2/525 to 2/553) Under PDNA
Construction of wire crate retaining wall at R.D. 28/105 to 28/120
(Sub Head -Construction of retaining wall at Km. 0/500 to 0/507.20)
Sub Head -Construction of Retaining wall at km 31/150 to 31/165).