Loading…
Loading…
7,526 results • Best match
ARK GP-24/23 - Construction of side protection wall at Aryankavu -Karayalarmathu road in Ward No.- 04 of Aryankavu Grama Panchayat under Annual Plan 2023-24
CONSTRUCTION OF APPROACH ROAD AND SIDE PROTECTION WALL IN TYPE II QUARTERS AT ANAKKATTY CHECK POST UNDER SHOLAYUR FOREST STATION IN AGALI RANGE DURING 2021-22
Annual Plan Kayamkulam Muncipality 2025 2026 Pro 229 26 Puthenmannel malayancanal protection wall various drain covering slab in ward 31 Pro 229 26 General Civil Work
Annual Plan-Madavoor GP 2022-2023 Annual Plan Road Maintenance work-PRO.NO.144/23 MULAVANA -KANIYAMKONAM ROAD SIDE PROTECTION WALL CONSTRUCTION IN WARD09-General Civil Work
GENERAL-117/23-24-Govt Girls HSS School Perumbavoor maintenance of lab,door water tank protection wall, roof sheet ceiling and roof maintenance-General Civil Work
Annual Plan-WARD-3 2023-24-MOOKKANNUR GP PRO NO 69/23 KUZHOOKKARANKAVALA SANKARANKUZHY CANAL BUND ROAD SIDE PROTECTION WALL CONSTRUCTION Ward 3-General Civil Work
Annual Plan-S C colony padanvalley thodu deepening and protection wall and culvert reconstruction in ward 9-pro.no.116 in kadamakkudy G P-General Civil Work
Annual Plan-Malappuram DP Annual Plan (2022-23), Project No 34-22 Protection wall and maintenance of Pottippara kall Vetti thodu at Puzhakkatteeri-General Civil Work
Chengannur Municipality - Project no 159/21-22 S C Coloni Kalathara bhagam road side protection wall construction and Thoni para road renovation in ward 19(SCP)
Protection works-Construction of side protection wall and irish drain in between km 4/800 and 5/000 of Olappeedika-Kunnumpuram-Tanur road in Tanur LAC
Flood Damage works-Construction side protection wall, drain and cover slab of Athanikkal - Theyyala road b/w Ch. 3/000 and 6/000 in Tanur LAC
Special Repair works 2021 22 Construction of Protection wall in 12th Mile PC Road at km 0 700,1 200 and 1 500 Opposite of MTLP School
Constuction of side protection wall at branch thodu and raising existing wall to prevent accident in Main thodu near Kadyilmudambu .temple in Kodumganoor ward, Trivandrum Corporation.
MP-LADS-2019-20-Nilambur Municipality- Work Proposed by Sri.PV Abdul Wahab MPConstruction of Protection Wall for Iyyammada SC Colony Road/Pathway in Ward No.16
LAC-ADS-2018-19 CHELAKKARA LA -CONSTRUCTION OF SIDE PROTECTION WALL, SOLING METALLING TARING OF PALIYAMPADAM KOTHAYATH KULAMBU ROAD IN WARD 11 OF CHELAKKARA GRAMA PANCHAYATH
Annual Plan-2024-25 Nilambur Municipality -Construction of Protection Wall for Thodu Near Muthukadu -Kallushappu In Ward No- 19-Project No.552/25-General Civil Work
Chengannur Devaswom in Aranmula group- Constructing protection wall and foot path along the sides of pathway leading from western side Gopuram to Sree Mahadeva temple-Reg
ANNUAL PLAN 2021-22, PROJECT NO.201 CONSTRUCTION OF CONCRETE PROTECTION WALL TO PERINGASSERY THERUVAKKUNNU-AALKKALLU ROAD IN WARD 7 OF UDUMBANNOOR GP (MG-R 7,00,000/-)
Annual Plan-Construction of protection wall, concreting of Moolayil - kalkkandamchira road, Ward 5 of Kumarakom gramapanchayat under Annual plan 2022-23-09/23-General Civil Work
GENERAL-MIPTA-THEVIYOD ELARectification of side protection wall at Theviyod ela near Vadakkadathukavu Petrol Pump in Erath Grama panchayath Under MI section Kadampanad-General Civil Work
Annual Plan-Madavoor GP 2022-2023 Madavoor GP 2022-2023 (Pro. No. 134/23) Arukanjiram Palarikonam Malayil road Side protection wall construction in ward No. 3
VBP 2021-22, Pro No. 77 Construction of side protection wall of peedika thodu at dharani thazham in ward-11 division-8 kizhakambalam Gramapanchayath (Reach 2)
1702/22-23-Thrissur Corporation2022-23 Ayyanthole zonal dvn 55 Construction of side protection wall at Whitefield and Construction of drain and coverslab at Thiruvonam Colony
Annual Plan-Annual Plan-Poonjar GP-2025-26 Project No.113/26-Protection wall of Mukkuzhi kalunkpadi kuruvammackal vathil road ward 9 (235000/-)-General Civil Work
GENERAL-Annual Plan-Poonjar Thekkekara Grama Panchayat 353/2024-25 Protection Wall for Muringapuram Thottippara Road in ward- 14 (Multi Year Project)-2,50,000/--General Civil Work
Annual Plan-2024-25, 2025-26 Manjeri Municipality ,Project No-226- THURAKKAL THODU PROTECTION WALL AND ORAANAADATHU TEMPLE ROAD DRAINAGE AT WARD 42-General Civil Work
DP WORKS 2021-22 CONSTRUCTION OF SIDE PROTECTION WALL FROM SWAMIYARALAKUDY NAMBEESAN VEEDU TO DEVARAJ VEEDU PORTION IN VATTAVADA GRAMA PANCHAYATH (DEVIKULAM BP)924/22-TENDER
Annual Plan-2024-25 NILAMBUR MUNICIPALITY -PROJECT NO- 55/25-WARD- NO-20-CONSTRUCTION OF PROTECTION WALL FOR CHAKKACHEENI THODU NEAR RAMANKUTHU ANGANAWADI-General Civil Work
GENERAL Monsoon Preparedness 2026 27 Urgent dumping works near existing protection wall at Thottekkadmadu in ward No 2 in Othukkungal GP Malappuram District General Civil Work
The work is proposed for the construction of retaining wall at Ch.179 260 of NH 183 The provisions included in the work are providing Dowel bars PCC M15 with skin reinforcement backfilling and Weep holes
Construction of side protection wall for Mazhavancherry pond in Cheruvakkal ward along with construction of drain and culvert for regulating flood waters
Construction of protection wall and providing covering slab to Vayala thodu along the NSS Karayogam
Retaining Wall I and Retaining Wall II and Drainage and Ramp and Footpath for Access
AMBALAPUZHA BLOCK PANCHAYATH - 2025-26 - PROJ NO. 10/26-Ambalappuzha Block panchayat - Division 3 - Construction of retaining wall at west side of parappil padom of ward no. 6 of Punnapara South GP
SC Corpus Fund-PERAVOOR BP 2022-23 CONSTRUCTION OF RETAINING WALL FOR THE PROTECTION OF THE HOUSE OF Smt VASUMATHI KUNNIL AND Smt INDIRA KUNNIL IN PUTHIYANGADI S C COLONY KOTTIYOOR GP
KIIFB VALANKARA AYIROOR ROAD IN PATHANAMTHITTA DISTRICTReconstruction of Retaining wall at ch 1 400 LHS amp RHS Rectification of Base course WMM Providing Interlock and construction of Drain at ch2300General Civil Work
Annual Plan-Proj No 389-2022-23-Constuction of Retaining wall from Chungam bridge towards south vazhaparambu Charumthara to Chungam thodu mukkolakkal SNDP east puthuparambu palam at Palace ward-General Civil Work
GENERAL Construction of Retaining wall Protecting the left bank of Cheruthoni river and construction of walkway at downstream of Cheruthoni new bridge in ward No 10 of Vazhathoppu Panchayath General Civil Work
Deposit work - Syamaprasad Mukharji Urban Mission Project - Protecting both banks of Mararikulam Valiyathodu from Chethi Pozhi ( from Existing retaining wall ) towards south in Mararikulam North Panchayath of Alappuzha LAC.SCHEME - II - PROTECTION OF
VBP-2021-22- Protecting the outer bund of Maradamkari Thekku Padasekharam by Construting retaining wall from near house of Karimathusseri Asokan House towards east in ward No. 8 of Veliyanad Grama Panchayath
GENERAL - Construction of Bund Road Madhupalom to Punchakkari Bridge with Retaining wall in Nemom LAC - Phase 2 (Priliminary soil investigation Ch.0/400 to 1/000) Part TS - investigation work Investigation Work
DEPOSIT SP Providing side protection work near to S Curve portion of TS Road at Ch 16400 km LHS for preventing slope failure Retaining wall at Ch 16400 km General Civil work
FLOOD DAMAGES 2018-19- Reconstruction of damaged Approach Road with Retaining wall and Construction of Relief Culverts and CC drain for Pollampara Bridge at Valad side in Mananthavady constituency in Wayanad Dt.
GENERAL Govt Polytechnic College Chelakkara Construction of Retaining wall at Govt Polytechnic college Chelakkara in front of KIIFB building in connection with NBA accreditation in Thrissur District (Chelakkra LAC) General Civil Work
Budget 2021 22 Budget work 2021 22 Construction of retaining wall at Mathilmoola and Rectification of Akambadam Pathar Road from KM 4 500 to KM 8 200 in Eranad LAC Malappuram Dist
KRP Construction of Retaining Wall for Protection of Aqueduct Pillar near Ch 1750 m of RBMC and providing Handrails to Aquedecut No 4 at Ch 5354 m to 5653 m of RBMC
VBP-2021-22- Strengthening outer bund of Muttanadi Kavumpanthi padasekharam by constructing retaining wall from near the land of Puthuveettil Govindan Nair towards south east in ward No. 4 of Veliyanad GP
Scheduled Cast Scheduled Tribe Development Department-Ambedkar Settlement Project-Sulthan Bathery LAC- Kottakkolly Unnathi-Footpath Concrete ,Toilet and Renovation of Community Hall ,Retaining wall Construction - Poothadi GP- Civil Work-Rs.46.50 Lakh
Construction of Higher Secondary Block with 4 Nos classrooms and Construction of 4 Nos Type III quarters including approach road, RCC retaining wall and Drain, etc. for EMRS, Pookkode, Vythiri, Wayanad, Kerala.
Retarring the Right side bund road of Kizhakkambalam Major distributary from ch0.985 km to 1.60km including side protection wall near ch 1.575 km