Loading…
Loading…
7,505 results • Best match
160/20 THEKKUMMOODU MAKKAPPUZHAPADY ROAD PROTECTION WALL
PROTECTION WALL-BEAUTIFICATION OF AYYANOLI WATER-FALLS
253/21 EDUPPUKALLU ROAD PROTECTION WALL CONSTRUCTION
Protection Wall for Pannor River Phase 2
Protection wall
Protection wall
Construction of retaining wall njeezhoor njallikkunnu -Perumkunnu road.
Road concrete , Side protection wall
Retaining wall
Supply of material for the for Public Pond retaining wall and foundation and fencing
HOSTELPADI RAJATHIPADI PROTECTION WALL ROAD CONCRETING
PROTECTION WALL CONSTRUCTION AND ROAD CONCRETING
Annual Plan-RGP-116/26-Bhaganamadampadi Illathupadi Road Protection Wall
RETAINING WALL CONCRETING
Retaining wall construction
Retaining wall 1.50 m Ht 90.00Rm
FOOT PATH, CULVERT, DRAIN, RETAINING WALL
retaining wall
-Construction of Retaining wall at Ch 1/400 of Melechinnar-Perinjamkutty road -
Annual Plan-2023-24 Parappa B P-Construction of Retaining wall for Parappa Block Office building
The estimate includes earthwork excavation for the retaining wall, PCC and RCC work for the RCC retaining wall, solid blockwork for the compound wall above the retaining wall, plastering, and painting for the compound wall
RCC RETAINING WALL
Concrete retaining wall work.
Construction of retaining wall
Construction of retaining wall
Construction of retaining wall
Reconstruction of retaining wall
Construction of retaining wall
Re construction damaged retaining wall
PROTECTION WALL CONSTRUCTION
Side protection wall
Side Protection Wall
Cheruvodu - kizhakke kuzhiyil road retaining wall construction.
GENERAL-Construction of a retaining wall at ch.4/650 of Santhanpara pottankadu road-Construction of a retaining wall at ch.4/650 of Santhanpara pottankadu road
Annual Plan Kallar GP Annual Plan 2023 24 PR NO 157/24 Retaining Wall for Edakadav Chettukallu road Retaining Wall for Edakadav Chettukallu road General Civil Work
GENERAL Construction of Retaining wall at km 9/550 of Pathiripala kongad roadConstruction of Retaining wall at km 9/550 of Pathiripala kongad road General Civil Work
GENERAL Neeleshwaram Edathode road CC Retaining wall (RHS) Construction of CC Retaining wall in Neeleshwaram Edathode road (RHS) chainage between 17 000 17 200 General Civil Work
SIDE PROTECTION WALL
PROTECTION WALL
PROTECTION WALL
PROTECTION WALL
Protection wall
Protection wall
CONSTRUCTION OF RETAINING WALL FOR SHEKHARATHUPARA ROAD II nd PHASE WARD 8
Construction of Retaining wall at km 5/700 in Moolamattom - Pullikkanam road-
construction of a rubble retaining wall at the side of the entrance road of 220kV substation(gate 2) Edamon
CONSTRUCTION OF CONCRETE RETAINING WALL AND PASSAGE SLAB IN KONNATHADY PANCHAYATH UNDER REBUILD KERALA INITITATIVE
Construction of RR masonry retaining wall at the north side of LHC at IISER Thiruvananthapuram