Loading…
Loading…
7,522 results • Best match
Reconstruction of damaged culvert and Retaining wall in Palakkad -Chittur Road at Km. 12/475 to 12/575 under Chittur LAC in Palakkad District
GENERAL-Urgent Construction of Retaining Wall and drainage facilities in Vennikulam- Ranni Road from Ch3/700 to 4/100 Civil work General Civil Work
REPAIRS TO AREA DRAINAGE, RETAINING WALL, HARDSTANDING, PLINTH PROTECTION AND OTHER MISC BR WORKS AT ZONE A AND B AREA UNDER GE (ARMY) TRIVANDRUM
Annual Plan-Kumarakomk GP-2026/27-Project No-93/27- Construction of Retaining Wall at Chakkalackal - Kuruppamparambu Road in Ward 10-General Civil Work
Annual Plan-Cherukole GP Project no.116/24-25. Thottungalpadi Perumethu Padi Road Retaining wall Construction ward 10-116/24-25-General Civil Work
Annual Plan-Thavanur GP Project No. 266/25-26 Side Protection Of G L P S Maravanchery School Building-Retaining Wall-General Civil Work
Annual Plan-2026-27-Project No 90/27 Retaining wall works to Pullanikode Alamkulam road in ward 07 of Malappuram Municiapality-General Civil Work
GENERAL-Vallyassery Padasekharam-KPConstruction of Retaining wall, Motorthara and Vachal thode in Vallyassery Padasekharam in Ward No.8 of Thakazhy Gramapanchayath. - General Civil Work
G E N E R A L - S L T F 2 0 2 1 - 2 2 - P r o v i d i n g Extension to the existing retaining wall at Lakshamveedu colony at ch 74/800 to 75/500 RHS of Calicut Vythiri Gudallore road-General Civil Work
DEPOSIT-SP-Rain damages-Reformation and Construction of roads including side protection works, forming drains, retaining walls, etc and resurfacing from ch 000 km to 20200 km TS road between ch 12500 km to 16310 General Civil Work
Construction of Side Protection Wall for Chettuva Lake Near Jaram in Ward 9 of Kadappuram GP
DRIP II - KAS - Repairs to surface drain and protective works to toe drain of Kuttiady Augmentation main dam and clearing spillway channel and construction of retaining wall at downstream of spillway ( Banasurasagar Dam)
Poikayilpady Vettithanam Road culvert widening Reconcreting Side protection Wall Ward 10-VKM/86/23-24-General Civil Work in Vakathanam GP
Annual Plan-THOLICODE GP 2025-26 346 / 26 - CONSTRUCTION OF SIDE PROTECTION WALL IN PULICHAMALA ERA PULLICHAMALA ROAD-General Civil Work
Annual Plan-Vattavada GP 2024-25 Construction of Canal and protection wall at Vadiyangadu ward-2-13/25 General Civil Work
PVIP-Reconstruction of Right Side protection wall between ch.415m and 505m of Njavaripadam MD-General Civil Work-1
LACADSMLAADS202425 Improvements to Anyadi Kanjiramkadavu road second reach Pachalil Mannuvila Kakkat road concreting and construction of retaining wall in ValiyakattumpuramKizhakkeattathil road in Sooranad North GP
GENERAL-SR 2025-26 Construction of retaining wall and allied works in Udayagiri junction in Arunnoottimangalam Appanchira Road Ch- 2.600 km-General Civil Work
Annual Plan-2022-23 KUZHUR GP - Construction of Culvert Side protection wall and Road raising at Thirutha Chakkattikunnu Road ward 11-SO213/23- General Civil Work
RE E TENDER ITHIKKARA BLOCK-MPLADS-2022-23 CONSTRUCTION OF PROTECTION WALL ON BOTH SIDES OF THURUTHUKAVU ROAD IN WARD 10 POOTHAKULAM G.P
Construction of Protection wall in Athanikkal Velloor Alakkad Thadapparamba road ( II Reach)-B/N KM 0/100 to 0/200 in Malappuram LAC
a retaining wall is needed to construct at the rear side of the rest house.It is also necessary to retain the earth at the height of 3.50M located along the boundary of rest house and PWD Roads Subdivision Office compound
DR Retaining wall and CC retaining Wall
ALINCHUVADU G U R U M A N D H I R A M R O A D RECONCRETING AND RETAINING WALL
DEPOSIT SP Rain damages Reformation and Construction of roads including side protection Works forming drains retaining walls etc and resurfacing from ch 0000 km to 20200 km TS road between Ch. 16310 km to 16800 km General Civil Work
-side protection wall to TN puram therakam road at Attukal ward under fort zonal office of Thiruvananthapuram corporation
Annual Plan-Construction of protection wall and ramp near culvert of maniyar JunctionForeign padi Road in Ward No.VIII of Vadasserikara G P 2022-2023-VGP- proj no.264-20222023Gl Ciil Wk
Annual Plan-Cherthala Municipality- 2023-24 Pro no-374-Construction of Protection wall at Madathil thodu in ward 24-25
Construction of side protection wall and covering slab to Irukunnam thodu near Irukunnam temple in Nettayam ward in Thiruvananthapuram Corporation.
Construction of protection wall for Eriyal Kollama thodu side of Mogralputhur G.P in Ward no.X.-Project no. 354/24-25.
Annual Plan-29/2025-2026 KVPDY BLOCK -Construction of Side protection wall of Karippeli thodu in Rayamangalam GP ward 17
Idukki DP Works 2019 - 20 - Kanchiyar GP - Jhonykkada Anjurili Thurangam road Re tarring and Kochuchennattupadi Bhagam Protection wall (273/20
SLTF 2019-20 Construction of CC protection wall to Trikaripur Vellapp Ayitty road between Km 1/500 to 5/500
LAC ADS 2017-18.Adoor LAC.Construction of protection wall and Tarring at Eerickal Ayyathu Junction -Kudassanadu Road in Pandalam Municipality
LAC-ADS-Shornur Constituency (2022-23) Construction of Side protection Wall and Concrete in Alumkunnu Kizhakkumuri Road in Cherpulassery Municipality
Annual plan 2022-23 Madappally BP Project No.155 /2022-23 Protection wall for veliyam Nalunakal thodu in Madapplly GP
Annual Plan-Erattupetta Municipality Project No 108/24-25 -KURUMULAMTHADAM ROAD PROTECTION WALL IN WARD 12 (1.5L)-General Civil Work
Annual Plan-PR NO 57/2023-2024 PROTECTION WALL FOR MYLAPRA MANNARAKULANJI VALIYATHODU WARD 11-MYLAPRA GP-General Civil Work
ADOOR MUNICIPALITY 2023-24 PROJ No.168/24 CONSTRUCTION OF SIDE PROTECTION WALL AT PANAMTHUNDIL COLONY ROAD IN WARD 11
Annual Plan-MGPLY 2024-25 Proj No. 318/25-Manimala Kunnanki road side protection wall ward 11-General Civil Work
Annual Plan PNJRS- 40/2023 24 Protection wall construction for GLPS Kaippally in ward 5 Compound wall General Civil Work
P. No. 72/2025-26 - Valiyathodu Protection Wall 4th Phase Ward 07, 13 - Mangalam GP - under Annual Plan 2025-26
Annual Plan-Vechoor GP -Project No 198/25 26-Pipe laying across Kadappalli Kadamattu road and construction of protection wall
Punalur Municipality 2021-22 Construction of Protection wall at Prakrithy Chikilsa Kendram in Karakkadu ward Prj No. 116/2021-22
2017-2018 CONSTRUCTION OF PROTECTION WALL AT AMBALA COLONY (BALANCE WORK) ROAD IN WARD NO-20 OF THRIKKAKARA MUNICIPALITY (RETENDER)
Annual Plan THANNITHODU GP 44 24 25 Maintenance of side protection wall at market mupootikatil padi road in ward 13
Annual Plan-MGPLY 2024-25 Proj No. 90/25- Side protection wall for poovathumkal valiyathodu arappupalam area -General Civil Work
P. No. 73/2025-26 - Valiyathodu Protection Wall 5th Phase Ward 07, 13 - Mangalam GP - under Annual Plan 2025-26
Annual Plan-ADLY - Plan 2022-23 Kammala Protection Wall in ward 14 of Adimali GP230/2022-23 -General Civil Work
Annual Plan-2023-24 Iritty BP project no.168- Construction of protection wall to Vilamana ST Colony-General Civil Work