Loading…
Loading…
1,910 results • Best match
Protection wall and Bathing Ghat at Balughat of Brahmani River
Construction of Protection wall at Ambaguda in Ward no-24.
Protection wall and Bathing Ghat at Ruputola of Brahmani River
Construction of Protection Work(Toe Wall) to Prevent from Land Sliding from RD 819.50 mtr.to 1215.00 mtr.of Pakhnaguda-Katharagada Minor
Construction of Box culvert 3Nos. and SRMC from RD.00Km to 10.00Km with RCC toe wall and canal lining repair
S/R to Road from Kumkapali to Turukchuan (Toe Wall) in the District of Sambalpur for the year 2023-24.
Improvement to Hatadihi Branch Canal from RD. 17700M to 19530M (toe wall and bed concrete) for the year 2023-24
S/R to Construction of the Toe wall at chainage 35/550km of MMPKG Road for the year 2022-23.
Repairing of drainage syphon on P.Canal at RD 34.415 Km and construction of toe wall for the year 2025-26
Construction of protection wall
Repairing damaged R.C.C. retaining wall at LOCM siding-02 of SOCP, IB Valley Area.
Construction of Retaining Wall Guard Wall over Canal in Ward 13 of NAC Bhanjanagar
Construction of Retaining Wall of 500m along OB dumps under GOCP of Basundhara Area.
Providing Locking/Retaining wall across diverted Bangaru Nalla at different locations of Ananta OCP
Making of shed for generator and fencing wall around transformer platform retaining wall etc.
Construction of road, retaining wall and drain for central stock yard at mancheswar, Bhubaneswar.
Const. of retaining wall from Mitu House towards Talisahi well in ward No 04
BEAUTIFICATION OF PERIPHERY OF GUDI BANDHA W.NO.11 UNDER N.A.C KHALLIKOTE. (PROVIDING RETAINING WALL)
PWD Road to Jamunia_Road_CC Renewal coat with RCC Retaining Wall -235mtr-_0.000 to 0.610
Construction of RCC Retaining wall at Laxmisagar Area Drain no 5, Ward no 43
Construction of Retaining Wall at Northern Side bund Rameswar Tank in Ward No 4
Construction of Retaining Wall at Eastern Side bund Rameswar Tank in Ward No 4
Construction of Retaining Wall at Southern Side bund Rameswar Tank in Ward No 4
C.C. Protection wall
Construction of toe wall with strengthening to KSDR Embankment from RD 58.30 to 58.50 Km. and 56.95 to 57.05 Km.
Improvement and slope protection to left flood embankment of saipala nallah, D/S PWD bridge near village Dharol of Saipala Irrigation Project for the year 2024-25.
Renovation of structures such as repair of CDs, Falls, slope protection work, bank strengthening, silt clearance in between RD 00m to 2370m of Kasibahal Minor-Ex-LMC.
Slope protection to scoured bank on Birupa right embankment near Athamania from R.D. 6.00 Km to R.D. 6.180 Km and near Ichhapur for the year 2020-21
Construction of Retaining wall on left bank of TMC near downstream of Somepur Lock
Construction R.C.C protection wall
Construction of protection wall
Construction of Protection wall
Providing CC protection wall
Construction of protection wall
Construction of protection wall
Providing C.C protection wall
Construction of Protection wall
Construction of protection wall
Construction of protection wall
Construction of protection wall.
Improvement to Flood Protection embankment on Baitarani left (Construction of toe wall near Bancho to Sibanarayanpur for the year 2020-21.
Restoration of disturbed stone packing between Left Pavilion to Lunch Ghat including construction of toe wall for the year 2024-25
Construction of R.C.C. toe wall with FPE on Tareikela nallah near RD Bridge to Suktel River from RD 00m to 75m.
Improvement to Service Road Chetana Kendra to Salandi Barrage, Bidyadharapur from RD 00Km to 2.7Km including RCC Drain with Toe wall
Construction of bathing ghat and toe wall on Genguti Right embankment near Achyutabasanta, Chandia and Gadjit for the year 2024-25
Widening Of Counter berm with Construction of Toe Wall at VRB from Elephant Corridor to Canal Syphon at RD 20.90 KM.
Repairing of boundary wall from CKT-7 retaining wall to feeder point office and rly. line to CKT-7 retaining wall along with barbed wire fencing of existing boundary wall at CHP under Bharatpur OCP.
slope protection
Construction Of Protection Wall For Maszid Pokhari In Ward No.- 06